My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-783
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2022 1:27:35 PM
Creation date
2/27/2022 1:27:34 PM
Metadata
Fields
Template:
Building Department
Company Name
ADVENTIST HEALTH SYSTEM/SUNBELT INC
Building Department - Doc Type
Permit
Permit #
20-783
Building Department - Name
ADVENTIST HEALTH SYSTEM/SUNBELT INC
Address
7050 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RS&H <br /> 1715 Westshore Blvd.,Suite 600 O 813-289-5550 <br /> Tampa,Florida 33607-3999 rsandh.com <br /> PH001—PHASING PLANS <br /> • Revised phasing with Dishwash room,staff toilets and temporary pot wash sink(Bakery) <br /> portion of work in Phase 1. <br /> • Added extent of slab removal hatch for clarification <br /> • Revised Phase 1 sequence notes per updated phasing plan <br /> PH002—PHASING PLANS <br /> • Revised phasing with work in Servery and turning Bakery into temporary Prep, new dry <br /> storage and diet office portion of work in Phase 2. <br /> • Revised Phase 2 sequence notes per updated phasing plan <br /> PH003—PHASING PLANS <br /> • Revised phasing with main Kitchen work in Phase 3. <br /> • Added extent of slab removal hatch for clarification <br /> • Phase 4 consist of clearing equipment and providing storage racks. <br /> • Revised Phase 3 and 4 sequence notes per updated phasing plan <br /> PH004—PHASING PLANS <br /> • Added new Sheet for Construction complete plan <br /> A102—NEW CONSTRUCTION FLOOR PLAN <br /> • Revised elevation tags 2/A401 and 4/A401 in floor plan. <br /> • Revised equipment and Servery counter layout in floor plan. <br /> A103—REFLECTED CEILING PLAN AND ROOF PLAN <br /> • Revised exhaust hood size on ceiling floor plan. <br /> • Revised light fixtures in Engineering 116 in floor plan. <br /> A104—FINISH PLAN AND SCHEDULE <br /> • Added P-1 finish tags in floor plan to show extent of new finish <br /> • Revised Acoustical Ceiling grid manufacturer and style in finish schedule <br /> A401—ENLARGED PLANS AND INTERIOR ELEVATIONS <br /> • Revised elevation 1/A401 title <br /> • Revised 2/A401 elevation tags and note for GC to coordinate with equipment vendor and <br /> provide shopdrawing of millwork counter with coordinate equipment cut-outs for review. <br /> • Revised 3/A401 to depict servery counter <br /> • Revised 4/A401 to show elevation view from behind the counter. <br /> A503—MILLWORK DETAILS <br /> • Revised server counter millwork details 8/A503 and 9/A503. <br /> P001-GENERAL INFORMATION -PLUMBING <br /> • Added new sheets to Plumbing Drawing Index. <br /> Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.