My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-783
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2022 1:27:35 PM
Creation date
2/27/2022 1:27:34 PM
Metadata
Fields
Template:
Building Department
Company Name
ADVENTIST HEALTH SYSTEM/SUNBELT INC
Building Department - Doc Type
Permit
Permit #
20-783
Building Department - Name
ADVENTIST HEALTH SYSTEM/SUNBELT INC
Address
7050 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RS&H <br /> 171 S Westshore Blvd.,Suite 600 O 813-289-5550 <br /> Tampa;Florida 33607-3999 rsandh.com <br /> PD101-LEVEL 1 DEMOLITION PLAN-PHASE 1—GRAVITY <br /> • Note added to demo all existing below slab piping. <br /> PD102-LEVEL 1 DEMOLITION PLAN-PHASE 2—GRAVITY <br /> . • Notes added and Revised phasing. <br /> PD103-LEVEL 1 DEMOLITION PLAN-PHASE 3—GRAVITY <br /> • Sheet added. <br /> PD201-LEVEL 1 DEMOLITION PLAN -PHASE 1—PRESSURE <br /> • Notes added. <br /> • Revised phasing. <br /> PD202-LEVEL 1 DEMOLITION PLAN-PHASE 2—PRESSURE <br /> • Notes added. <br /> • Revised phasing. <br /> PD203-LEVEL 1 DEMOLITION PLAN-PHASE 3—PRESSURE <br /> • Sheet added. <br /> P101-LEVEL 1 RENOVATION PLAN - PHASE 1—GRAVITY <br /> • Notes and pipe sizes added. <br /> • Revised phasing. <br /> P102-LEVEL 1 RENOVATION PLAN-PHASE 2—GRAVITY <br /> • Grease waste piping previously shown as new changed to existing. <br /> • Revised phasing. <br /> P103-LEVEL 1 RENOVATION PLAN- PHASE 3—GRAVITY <br /> • Sheet added. <br /> P201-LEVEL 1 RENOVATION PLAN -PHASE 1—PRESSURE <br /> • Notes and pipe sizes added. <br /> • Revised phasing. <br /> P202-LEVEL 1 RENOVATION PLAN - PHASE 2—PRESSURE <br /> • Moved natural gas meter and regulator and associated piping to correct Phasing. <br /> • Natural gas piping for charbroiler removed. <br /> P203-LEVEL 1 RENOVATION PLAN-PHASE 3—PRESSURE <br /> • Sheet added. <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.