My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-783
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2022 1:27:35 PM
Creation date
2/27/2022 1:27:34 PM
Metadata
Fields
Template:
Building Department
Company Name
ADVENTIST HEALTH SYSTEM/SUNBELT INC
Building Department - Doc Type
Permit
Permit #
20-783
Building Department - Name
ADVENTIST HEALTH SYSTEM/SUNBELT INC
Address
7050 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RS&#f <br /> 1715 westshore Blvd.,Suite 600 O 813-289-5550 <br /> Tampa,Florida 33607-3999 rsandh.com <br /> M501-MECHANICAL CONTROLS <br /> • Revised AHU Sequence of Operation. <br /> • Revised notes. <br /> E001—GENERAL ELECTRICAL INFORMATION <br /> • Drawing index will change <br /> E002—ELECTRICAL ONE-LINE DIAGRAM <br /> • Updated coordination plot <br /> ED101-LEVEL 1 DEMOLITION PLAN-PHASE 1-POWER <br /> • Redesign plan to show demo work in Dishwash Room and temp Dishwash under phase 1 <br /> • Re-phase floor plan to accommodate new scope <br /> ED102-LEVEL 1 DEMOLITION PLAN- PHASE 2-POWER <br /> • Redesign plan to show demo work in the Kitchen under phase 2 <br /> • Re-phase floor plan to accommodate new scope <br /> • Modify notes <br /> E101-LEVEL 1 RENOVATION PLAN'-PHASE 1-POWER <br /> • Redesign power plan to show new work in Dishwash Room and temp Dishwash under phase <br /> 1 <br /> • Re-phase floor plan to accommodate new scope <br /> • Modify notes <br /> E102-LEVEL 1 RENOVATION PLAN.- PHASE 2- POWER <br /> • Redesign power plan to show new work in the Kitchen under phase 2 <br /> • Re-phase floor plan to accommodate new scope <br /> • Modify notes <br /> E103-LEVEL 1 RENOVATION PLAN-PHASE 3- POWER <br /> • Added sheet <br /> • Re-phase floor plan to accommodate new scope <br /> E201-LEVEL 1 RENOVATION PLAN-PHASE 1-LIGHTING <br /> • Redesign lighting plan to show new work in Dishwash Room and temp Dishwash under <br /> phase 1 <br /> • Re-phase floor plan to accommodate new scope <br /> • Modify notes <br /> Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.