Laserfiche WebLink
RS&H 1715 Westshore Blvd.,Suite 600 0 813-289-5550 <br /> Tampa,Florida 33607-3999 rsondh.com <br /> E202-LEVEL 1 RENOVATION PLAN-PHASE 2-LIGHTING <br /> • Redesign lighting plan to show new work in the Kitchen under phase 2 <br /> • Re-phase floor plan to accommodate new scope <br /> • Modify notes <br /> E203-LEVEL 1 RENOVATION PLAN-PHASE 3- LIGHTING <br /> • Added sheet <br /> • Re-phase floor plan to accommodate new scope <br /> E401—PANEL SCHEDULES <br /> • Adjusted panel schedules <br /> FP001—PLUMBING RISER DIAGRAM <br /> • Sheet added to sheet index. <br /> FP101-NEW FLOOR PLAN-PHASE 1- FIRE PROTECTION <br /> • Sprinkler components moved to correct phasing. <br /> FP102-NEW FLOOR PLAN-PHASE 2-FIRE PROTECTION <br /> • Sprinkler components moved to correct phasing. <br /> FP103-NEW FLOOR PLAN-PHASE 3-FIRE PROTECTION <br /> Sheet added. <br /> T001—GENERAL INFORMATION—TECHNOLOGY <br /> • Sheet added to sheet index. <br /> T101-LEVEL 1 RENOVATION PLAN-PHASE 1—TECHNOLOGY <br /> • Moved Technology devices to correct Phasing. <br /> T102-LEVEL 1 RENOVATION PLAN-PHASE 2—TECHNOLOGY <br /> • Moved Technology devices to correct Phasing. <br /> T103—LEVEL 1 RENOVATION PLAN—PHASE 3—TECHNOLOGY <br /> • Sheet added. <br /> Note: Narrative descriptions of changes to the drawing and specifications are <br /> general in nature, refer to actual revised documents for the full extent of changes. <br /> End of Revision 01 Narrative <br /> Page 8 of 8 <br />