Laserfiche WebLink
RS&H <br /> 1715 Westshore Blvd.,Suite 600 O 813-2.89-5550 <br /> Tampa,Florida 33607-3999 rsondhxom <br /> ARCHITECTURAL: <br /> G-1 The primary and first inspection of an ICRA is the responsibility of the facility, <br /> their procedures include a permit and daily inspection that is to be logged in. <br /> At the 80%the Arch reviewer is to request a copy of the ICRA log and permit <br /> (signed by facility and contractor)from the facility(at the initial meeting)and <br /> then conduct the survey of the area for ICRA compliance. <br /> G-1 Response Will Comply. Notes are included in Phasing plans on 'I.C.R.A DUST BARRIER <br /> LEGEND'. Refer to Sheets PH001,PH002, PH003. <br /> A-4 Show the locations of the HEPA machines,the temporary Fire Extinguishers <br /> and the temporary Exit signs on the Demolition plans and the method and <br /> location of the exhaust ducts and the Class Precautions during Construction/ <br /> Upon Completion of construction in accordance with the 2014 Guidelines <br /> sections 1.2- 1.3.2 and 1.2-3.2.2 <br /> A-4 Response HEPA machines, temporary Fire Extinguishers and the temporary Exit signs, <br /> method and location of exhaust ducts and the Class Precautions are <br /> indicated in Phasing plans PH001, PH002, PH003.Added note on Demolition <br /> plan to refer to Phasing plan. See updated AD101. <br /> ELECTRICAL: <br /> E-1 Panel NHK schedule does not properly identify the breaker feeding <br /> transformer <br /> T-NLK. Make changes as necessary. <br /> E-1 Response Will Comply.See updated sheet E401 <br /> E-2 Provide a panel schedule for all affected panels, including but not limited to, <br /> MSB, EQHK, and EQLK. <br /> E-2 Response Will Comply.See updated sheet E401 <br /> E-3 New 250A breaker in EQB does not coordinate with the upstream 600A <br /> breaker. <br /> E-3 Response Will Comply.See updated sheet E002 <br /> Page 2 of 8 <br />