My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-783
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2022 1:27:35 PM
Creation date
2/27/2022 1:27:34 PM
Metadata
Fields
Template:
Building Department
Company Name
ADVENTIST HEALTH SYSTEM/SUNBELT INC
Building Department - Doc Type
Permit
Permit #
20-783
Building Department - Name
ADVENTIST HEALTH SYSTEM/SUNBELT INC
Address
7050 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> . ^ <br /> RS&H 171swestshomm"�suue600 0813-289-5550 <br /> Tampa,Florida 33607-3e99 svmdh.mm <br /> Addendum no. 1 Narrative =ywew��»� If <br /> Kitchem & HVAC Renovation - - --- <br /> AdventHea|thZephyrhiXls ------�-- <br /> O7-17-20 <br /> Narrative summary of revisions:The following are issued for revision/clarification <br /> PROJECT SPECIFICATIONS REVISIONS: <br /> SPEC SECTION 092216—NON-STRUCTURAL METAL FRAMING <br /> w Revise section 2.2 8.1.e. Minimum Base-Metal Thickness to 0.8269 inch <br /> SPEC SECTION 0824QO—CEMENT PLASTERING <br /> w Delete White color requirement from.section 2.4A.1. <br /> SPEC SECTION 223100—DOMESTIC WATER SOFTENERS <br /> * Delete Specification Section 223100 in its entirety.See attached revised MEP TOC pages <br /> PROJECT DRAWING REVISIONS: <br /> GOOO—COVER <br /> * Revised sheet index to indicate revised sheets. <br /> A104—FINISH PLAN AND SCHEDULE <br /> w Revised LVT-1to American Bi|trite [EO-O3 <br /> * Added LVT'2 American Bi|triteVTG-13O for new Dry Storage Ill <br /> w Revised Paint P-1toSVV7O16' Eggshell, Mindful Gray <br /> w Revise Hollow metal doors and frames paint to SVV7675,Semigloss,Sealskin <br /> * Added VVP-3 Color:Sharkskin O3SO <br /> * Revised Plastic laminate PL1tnVVi|sonart7966K-1Z <br /> m Revised Solid Surface SS-1toVVi|sonart93O4CE ' <br /> A6Ql—DOOR FRAME SCHEDULE AND DETAILS <br /> w Revised doors 11O, 11S and 123to hollow metal doors. <br /> w Revised door 133 type toB <br /> P001—GENERAL INFORMATION-PLUMBING <br /> w Water softener(VVS'1) information changed in plumbing fixture schedule. <br /> ,P202—LEVEL l RENOVATION PLAN'PHASE 2- PRESSURE <br /> w Hot and cold water serving equipment in Temp Kitchen removed, no longer applicable. <br /> M102—LEVEL 1RENOVATION PLAN—PHASE 2—DUCT WORK ^ <br /> w Moved AHU-1 one foot plan west <br /> sa^m� <br /> ,IL Cert.Nos Vmm�6-IR2mOq9�^ cmM2m <br />
The URL can be used to link to this page
Your browser does not support the video tag.