Laserfiche WebLink
Bill Burgess <br /> From: Bill Burgess <br /> Sent: Monday, February 04, 2019 10:52 AM <br /> To: 'Steve Billiter' <br /> Cc: Kalvin Switzer; Gene Brown <br /> Subject: Hair Lab <br /> Steve, <br /> The following needs to be addressed or clarified as a revision: <br /> 1. Information on Hazardous materials required per FBC.414.1.3 <br /> 2. Mezzanine in High Hazard H-3 requires 1-hour construction,floor joist,etc. FBC.414.2.4 <br /> 3., Fire Wall between business and High Hazard 3 requires minimum 2hr separation (even with automatic fire <br /> sprinklers) NFPA 101 Table 6.1.14.4.1 <br /> 4. Exhaust hazardous area per FMC 502.8? <br /> Fire Alarms and Automatic Fire Sprinklers require separate permits <br /> William A. Burgess <br /> Building Official <br /> City Of Zephyrhills <br /> 1 <br />