My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-62
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-62
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 10:48:58 AM
Creation date
3/2/2022 8:11:03 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-62
Building Department - Name
COPPLE,RONALD & SUSAN & ALTI
Address
37120 CULLENS TRAIL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Required To®Is' <br /> Hammer or Stud Finder <br /> ` Roof Marking Crayon <br /> Drill With 1/8 inch.Pilot Drill Bit <br /> Roof Sealant . <br /> Threaded Bit Adapter <br /> • 1/2 inch Socket Wrench <br /> Torque Wrench <br /> Materials Included In Series 100 Hanger Bolt Kit: <br /> ® (1) SnapNrack Hanger Bolt Clamp Front <br /> 0 (1) SnapNrack Hanger Bolt Clamp Back <br /> p..(.1) 5/16in SS Split Lock Washer. <br /> 0 (1) 5/16in -18 X lin SS HCS Bolt. <br /> p (1) SnapNrack Channel N.ut, 5/16in - 18 . <br /> Other IWaterials-Required: <br /> 0-(1) 3/8" Stainless Steel Hanger Bolt <br /> Dimensioned Assembly 0 <br /> 0 <br /> 3�4 <br /> I . <br /> ©. 0 <br /> 713/8 When To User <br /> Any,Roof Style.- . <br /> Dimensioned Hanger <br /> Bolt Clarrip, <br /> i„ <br /> R 0.188" 3/4u <br /> R 0.1.7e' <br /> Technical Hanger.Bolt Clamp. <br /> Material 6000 Series Heat <br /> Treated Aluminum <br /> Color C«lass 2 Anodized Finish <br /> C«lear Finish Available <br /> Weight 0.7 LBS <br /> Design Uplift Load 200 LBS Uplift <br /> Design Ultimate Load 1600 LBS Uplift <br /> 12 <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.