Laserfiche WebLink
n <br /> _ Series 100 <br /> anger go1g <br /> b W Y 1) Loc <br /> j <br /> the ate the rafter l�'�'''•''"'�`; ",:.�,, <br /> decking of underneath the roof. h <br /> 2) Drill a <br /> pilot hole t <br /> material into <br /> the lag bolt the rafter to h the roofing <br /> solid portio will be locate ensure that <br /> C <br /> is not found ion of the rafter <br /> into a <br /> • immediately w to sea/ the he rafter <br /> • roofing pilot hole <br /> -, 3) Apply sealant. <br /> may , «*3 }" - _ • , the pilot hol fin ant <br /> g seal <br /> f _ lag to ensure and the hangrrctly onto <br /> water bolt <br /> r <br /> 4)Attach t tight seal. <br /> threaded bit a hanger bolt <br /> embedment apter w'th using the <br /> rafter. Ti ghteof 2 f»lag shank <br /> yt Y -k <br /> n Lag bolt to nk into the <br /> Attach the seat. <br /> hanger bolt assemble/nut of the <br /> ) Then aii. <br /> sett'ngt ttac <br /> the hangearound the threaded <br /> bolt clamp b <br /> �- tighten silver ha lt to the deaded portion of <br /> �l _ • hardware to 10 6 Ft'Ibs and <br /> > V ' <br /> 1k <br /> { <br /> SnapNrack <br /> {,. and be used wihneeYed systems should <br /> _ — may void thardare. qnY atte Wrack components <br /> calculations e Warrant ate applicatio <br /> w- could become inv/id. <br /> f If a plot dole 's <br /> Pilot drille <br /> roof'ngis�a aat tely seal and a rafter is not <br /> Do not over t° avoid Pilot hole w'th <br /> Always weartighten hardware <br /> damage. <br /> i d safet prote Fare. <br /> an fal! <br /> Y gear. ction <br /> SnapNrack�})��5 <br /> to help configure <br /> a suite of <br /> pure Your pV design tools <br /> visit uG an s at: vvvv and fast i instailat-at: w�v�,.Sna nstall. to <br /> pNrack corn Please <br />