My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-90
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-90
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 12:46:43 PM
Creation date
3/2/2022 8:31:34 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-90
Building Department - Name
AMBROS,KATHRYN & ALVARO
Address
38104 9TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> ROCK-IT SYSTeI.1`1 4.0 I nSTa LL <br /> l <br /> k <br /> a <br /> 5 <br /> f4 <br /> I <br /> R&A <br /> 1 install Ectilcasten Solar Flashing with Rock-it.Mounts <br /> Follow EcoFasten solarinstall lrutruMors forflashing and brackethutail(GreenFasten shaven above). <br /> •Optimum vertical distance between tag bolts is 13/8'plus module dimension. <br /> •Set mounts on eve mostrowsothattheRodc-k Pedestal Isonthe5outhendofRock4tSilde. <br /> •Set mounts on all upper rows sothat the Rock:it Pedestal Ison the No"end ofRock4tSlide. <br /> 2 Install Rock-It Array Skirt onto Eave Mounts <br /> • Slide Rock-It Array Skirt into front channel on Rock-It Shelf. <br /> -.Array Skirt End Caps are pre-lmtalied on the East end of each skirt section,and are-used to-couple the skirt sections where needed(see Fig.A). <br /> Tighten Mid-Clamp bolt,clamping Rock-It Array Skirtto mount.Torque to 200 hrtbs.(130In-tbs.when installing with 32mm modules). <br /> _4 Install Rock-It Couplings(when Joining 4 panels with a Coupling,the use of,a load bearing foot Is.required) <br /> • Prior to mounting on the roof,snap Load Searing Foot into the bottom of Rock-It Coupling if required.. <br /> (Each Load Bearing Foot Is set to same height as the Rock-It Mounts,-adjust accordingly)- <br /> •.On eave row only,slide Rock=lt Array Skirt onto Rock-It Coupling Shelf.Torque to specified value. <br /> • NOTE:If a coupling lands on a rafter,the Hybrid Mounts should be used In place of theRock-It Coupling(refer to imageAa)', <br /> *Hybrid Mount can be made in the field by assembling a coupling to amount pedestal;or-by purchasing separately. <br /> C, Align and Straighten First Row of the Rock-it System with Rock-it Array Skirt <br /> •Use North-South adjustment of the Rock-It Pedestal to straighten RodWtArray Skirt and align module with Array Skirt <br /> •Torque screw on side ofRock-It Pedestal to150in-Ibsto secure itto the Rdck-ItSlide. <br /> Adjust Flange Level Nut to level the system(optional—ran be leveled during or after Installation). <br /> 6_9 install 1st Row of PV Modules <br /> •Slide upslapeRock-It Mounts down to engage top offirst module. <br /> •install RockttCoupiingson the upstope side ofIst row ofpanels. <br /> •Torque 2nd row of Mid{lamps an Rock-it Mounts and Rock=tt Couplings to specified value. <br /> •Install balance ofPV modules,ensuring thattheRodc-It Pedestals are In the appropriate position,then torque Mid-Camps to secure modules. <br /> 1.0 -Level the Rock-It System <br /> •When assembly Is complete,level the entilmsystem by adjusting Flange Level Nuts(Flange Level Nuts have no torque value): <br /> •Height between roof surface and underside of modules should be 3'or less,when Installed with Type 2 modules <br /> INSTALLATION NOTE:Modules should be'installed so that the junction box Is Installed upslope,away.fram theleading-edge of the array. <br /> wwwecofastensolarcom info@ecofastensolarcom 877=859-3947 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.