My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-90
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-90
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 12:46:43 PM
Creation date
3/2/2022 8:31:34 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-90
Building Department - Name
AMBROS,KATHRYN & ALVARO
Address
38104 9TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GrounDinG LUG inSTaLL <br /> _ .. y-_' <br /> Necessary Components:. <br /> One of the following ground lugs(or any UL 2703 compliant.ground lug): <br /> Burndy CL50-1 TN Ground Lug(UL 2703-E351343 J UL 467-E999% <br /> ILSCO SGB-4 Ground Lug(UL 2703-E354420 /UL 467 E34440) <br /> 1LSCO GBL-4DBT(UL 2703-E354420 /_UL 467-.E34440) <br /> 1LSCO,GBL-4DBTH.(UL 2703 E354420 [UL 467-E34440) <br /> ILSCO GBL-4SS(UL 2703-E354420 /UL 467-E34440) <br /> Note:Drill and.deburr hole in Ground Lug prior to installation <br /> - 14 AWG-4 AWG Copper Ground Wire' Torque Values: <br /> - 8-32 x 0.5"Serrated Flange Head Bolt(300 Series SS), 14=1 GAWG=20 in-lbs. <br /> - 8-32-Serrated Flange-Nut(300 Series SS) 8 AWG=25 in-ibs. <br /> - 11/32"and 1/4"wrenches or ratchets/sockets 6-4 AWG=35 in-lbs. <br /> 1-Insert the flange bolt into the module ground hole:Place Star Washer-over bolt.Place ground lug over the bolfi.and <br /> Star Washer,and turn to desired orientation. <br /> 2. Install Flange Nut. <br /> 3 Tighten Flange Nut/Bolt. <br /> 4 Place wire in Ground Lug channel'and tighten set screw to.complete assembly,, <br /> *Wire should be sized In accordance with the National Electrical-Code,-NFPA 70,Section 690.45,and a minimum of <br /> 1/4"clearance required between bare copper wire and aluminum. <br /> i° HI Drill hole'per.grounding lug manufacturers <br /> f= specifications'in the upsiope part of Rock-It Coupling <br /> V. for attaching grounding lug. <br /> Note:Deburr hole in Ground Lug and Rock-it Coupling prior to installation. <br /> wwwecofastensolarcom info@ecofastensolarcom 877-859�3947 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.