My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-90
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-90
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 12:46:43 PM
Creation date
3/2/2022 8:31:34 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-90
Building Department - Name
AMBROS,KATHRYN & ALVARO
Address
38104 9TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R O C K-I T CLIP S S i n STa L L a Rccentat>fe btmmling Location] <br /> rep <br /> ...2*6tm.from. <br /> a I . Vnefion Roy <br /> I <br /> 1 Locate all,parts <br /> -Locate the Rock-It Clip'SS,micro-inverter/power optimizer;and the section of the module frame in which <br /> you.will be-mounting the micro inverter/power optimizer. <br /> See fig.A for acceptable mounting-locations. <br /> 2 Install the Rock-It Clip SS <br /> • Slide the RockAt"Clip SS onto the lip of the.module frame. <br /> • Slide the.micro-inverter/power optimizer.into the opposite-lip of the.Rock:lt Clip SS. <br /> • Tighten the bolt to 150 in-lb minumum to clamp.the Rock it Clip SS to the module.frame and the- <br /> micro=inverter/power.optimiier to the Rock-it Clip SS. <br /> • Ensure that the-lip on-the clip is tight against the frame and that the micro-inverter/power optimizer flange is <br /> tight against the clip flange to avoid rotation during tightening. <br /> ROCK. IT CLIP 2.O inSTaLL <br /> Inverter Flange <br /> Module Frame <br /> Rotk-lt=Clip 2.0 <br /> 1 Locate all parts <br /> •Locate the Rock-it Clip 2.0,micro-inverter/power optimizer,and the section ofthe module frame in which you <br /> Will be mounting the micro-inverter/power optimizer. <br /> 2-Install the Rock-It Clip 2.0.(See below detail) <br /> • Slide the Rock-It Clip 2.0 onto the lip of the micro-inverter/power optimizer. <br /> •-Slide the_micro;inverter/power.optimizer.Into the opposite lip of the module frame. <br /> • Tighten the.bolt to 1.50 in-lb.to clamp the Rock-it Clip 2.0 to the module frame and the micro=inverter/power <br /> optimizer to the Rock-it Clip 2.0. <br /> • 'Ensure that.the lip on the clip is tight.against.the frame and that the micro-inverter/power optimizer flange is. <br /> tight against the clip flange to avoid rotation during tightening. <br /> wwwecofastensolarcom info@ecofastensolarcom 877-859-3947 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.