Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 ofthe 2016 N.E.-C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> . <br /> feet-around the structure. <br /> 25. R403.5.3Hot water.pipe insulation <br /> Insulation for hot water. pipe with a minimum thermal resistance (R-value)'of R-3 shall be applied to the- <br /> followin <br /> Piping V.inch (19.1 mm) and larger_in,nominal diameter.. <br /> Piping:serving more than one dwelling unit. <br /> Piping located outside the conditioned space.. <br /> Piping from the water'heater to:a distribution manifold. <br /> Piping:located under a floor slab. <br /> Buried in' -piping. <br /> Supply and return piping in.recirculation systems other than demand�recirculation-systems. <br /> 25. Blower.door test shall be provided before C.O. <br /> 26. A copy of the energy cacls shall be with Permit at all times <br /> 27.. Copy of final,insulation report shall be provided with permit before r1o" <br /> 28. No fence, pool or screen enclosure is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />