My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-181
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 12:45:31 PM
Creation date
3/2/2022 9:37:27 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-181
Building Department - Name
RATERING,JOHN & MARGARET
Address
7924 MERCHANTVILLE CIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Array LaYOUT <br /> • Find the required structural attachment points. <br /> Mark these using a vertical(N-S).chalk line on the <br /> center of the rafters. <br /> • Spacing may.vary depending upon project specific <br /> structural requirements;Le:high snow and wind <br /> load areas may require lesser bracket spacing,in <br /> the E-W axis vs.the maximum spacing.Max spacing <br /> is 48"for.portrait orientation and 72"for landscape <br /> orientation..Consult project layout diagram for <br /> project specific bracket spacing on the.roof. <br /> • Install-Rock-It Mounts to predetermined mount <br /> spacing. <br /> • The Rock-it Array Skirt sections are.the width of a typical 60.cell <br /> module—.use the.Rock-It Array Skirt.as a guide to'lay out module <br /> placement. <br /> Note:The distance between the rows of mounts is calculated by the module dimension N-S plus T 3/8" <br /> (35mm).Lag screw should be Installed as close to center-of exposed shingle as possible..The minimum. <br /> distance between the lag screw and the edge of shingle is 1/2" <br /> -GreenFaSTe.nTm FLaSHinG InSTaLL <br /> i Locate the rafters and snap horizontal and,vertical lines to mark the installation_ <br /> position for each GreenFasten flashing. <br /> WFA <br /> &_ 2. Drill a pilot hole ON'diameter)for the lag bolt Backfill with sealant.Ecol asten Solar <br /> recommends an.EPDM mastic. <br /> 3 -insert-the flashing so the top part is underthe next row of shingles and pushed far <br /> f' enough-up.slope to prevent water infiltration through vertical joint in shingles.The <br /> leading edge.of flashing must butt against upper row.of nails to preventtuming. <br /> when torqued. <br /> 4 Line up pilot hole with GreenFasten flashing hole. <br /> insert the lag bolt through the EPDM bonded washer,the Rock-it slide,the gasketed. <br /> hole in the flashing and Into the rafter. <br /> Torque:The range Is.between,100-140 torque Inch-pounds depending on the type <br /> of wood and time of-year.The visual.lndicator.for proper torque is when the EPDM <br /> on the underside of the bonded washer-begins to push out the sides as the washer <br /> compresses.If.using an impact wrench to install the fasteners.be careful not to over <br /> torque the fastener.You may.need to stop and use a ratchet to finish the install. <br /> 9be Engineer of Record shall check capacity of rafter to support lag screw loading. <br /> www.ecofastensolarcom info@ecofastensolar.com. 87-77859-3947 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.