My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-181
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 12:45:31 PM
Creation date
3/2/2022 9:37:27 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-181
Building Department - Name
RATERING,JOHN & MARGARET
Address
7924 MERCHANTVILLE CIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROCK IT SY,STeI'l`1 4.0 insTaLL <br /> •..*•f'.i. III � 1C' III III I <br /> - I <br /> R <br /> 1 <br /> Fig.A <br /> install EcoFasten solar Flashing with Rack-It.Mounts <br /> •FollowEcolastenSolarinstalllnsWctloniforflashingandbracketIstall(GreenFastenshownabove).- <br /> •optimum vertical distancebetween tag bolts Is 1 3Arplus module dimension. <br /> •SetountsoneavemostmwsothattheRodcatPedestalisontheSouthendofRock-RSRds <br /> • mSet mounts on allupper mwsso thattheRod0tPedlestal'Is on the North end of Rod(4t SH& <br /> 2 Install Rock-It Array Skirt onto Eatre Mounts <br /> • Slide Rock-It Array Skirt into front channel on Rock It Shelf. <br /> •Array Skirt Enid Caps are pre-Installed on the East end of each skirt sectlon,and are used to couple the skirt sections where needed(see Fig.A). <br /> Tighten Mid-Clamp bolt,clamping Rocklt Array Skirt-to mount.Torque to 200 dribs.(130 in-lbs,when Installing with 32mm modules). <br /> —q- Install Rock-it Couplings(when joining 4 panels with a Couplingrthe use of a load bearing foot Is,required) <br /> • Prior to mounting on the roof,snap Load Bearing Foot Into the bottom of.Rodc-It Coupling If required. <br /> (Each Load Bearing Foot is set to same height as the Rock-it Mounts-adjust accordingly) <br /> • On eave row only,slide Rockit Array Skirt onto Rock It Coupling Shelf.Torque to specified value. <br /> • NOTE:If a coupling lands-on a rafter,the Hybrid Mount'should be used in place of the'Rock-It Coupling(refer to image:3a). <br /> "Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal,or by purchasing separately, <br /> C, Align and Straighten First Row of the Rock-it System with Rock-it Array.Skirt <br /> •Use North-South adjustment of the Rock4t Pedestal to straighten Ro&4t Array SkIrt and align module with Array SklrL <br /> •Torque screw on side of Rock-it Pedestal toISoin-ibstosecureitto the Rock-ItSlide. <br /> -Adjust Flange Level Nut tolevel the system(optional—can be leveled daringoraRerkutatlatlim)• <br /> 6-7 Install 1st Row of PV Modules <br /> •Slide upslope Rode-It Mounts down to engage top of first modulo— <br /> Install Rock-ItCouplIngs on the upsiope side ofist raw ofpanels. <br /> -Tonlue2nd row ofMid:ClampsonRock-It Mounts and Rock-it Couplings to specified value. <br /> •Install balance of PV modufesensudng that the Rock-ft Ped.estali are in the appropriate position,then torque MId-Clamps to secure moddes. <br /> 10 <br /> Level the Rock-it System <br /> •when assembly Is complete,level the entire system by adjusting Flange Level Nuts(Flange Level Nuts have no torque value). <br /> • Height between roof surface and underside of modules should be 3"or less,when Installed with iWw 2 modules <br /> INSTALLATION NOTE:Modules should.be Installed so that theJunctlon box is installed upslope,•away.from the-leading edge of the array. <br /> www.ecofastensolar.com iiifo@ecofastensoiarcom 877-859-3947 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.