My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-204
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 9:54:05 AM
Creation date
3/2/2022 9:53:57 AM
Metadata
Fields
Template:
Building Department
Company Name
SF ZEPHYR COMMONS LP
Building Department - Doc Type
Permit
Permit #
20-204
Building Department - Name
SF ZEPHYR COMMONS LP
Address
7910 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section <br /> # Final Inspection Complies? Comments/Assumptions <br /> & Reci.ID <br /> C303.3, ;Furnished O&M instructions for ;❑Complies <br /> C408.2.5. !systems and equipment to the ;❑Does Not <br /> 2 building owner or designated <br /> [FI17]3 representative. :❑Not Observable <br /> ❑Not Applicable <br /> C303.3, ;Furnished O&M manuals for HVAC I❑Complies <br /> C408.2.5. systems within 90 days of system ;❑Does Not <br /> 3 acceptance. <br /> [F18]3 ;❑Not Observable; <br /> ❑Not Applicable <br /> C403.2.4. I Minimum one humidity control device ;❑Complies <br /> 2.4 per installed ;❑Does Not <br /> [F156]3 humidification/dehumidification ❑Not Observable <br /> system.Controls prevent <br /> simultaneous operation of ;❑Not Applicable <br /> humidification and dehumidification <br /> equipment. <br /> C403.2.4. ?Minimum one humidity control device ;❑Complies <br /> 2.4 per installed ;❑Does Not <br /> [F156]3 t humidification/dehumidification <br /> system. Controls prevent :❑Not Observable <br /> simultaneous operation of ;❑Not Applicable <br /> humidification and dehumidification <br /> s equipment. <br /> C403.2.4. ;Minimum one humidity control device ;❑Complies I <br /> 2.4 per installed ;❑Does Not <br /> [F156]3 humidification/dehumidification <br /> system. Controls prevent I❑Not Observable <br /> simultaneous operation of ❑Not Applicable <br /> humidification and dehumidification <br /> equipment. <br /> C403.2.1 HVAC systems and equipment design ❑Complies <br /> [F150]3 I loads calculated in accordance with EDoes Not <br /> {ANSI/ASHRAE/ACCA Standard 183 or <br /> i ACCA Manual N or by an approved ❑Not Observable <br /> equivalent computational procedure. t❑Not Applicable <br /> (Design loads shall be attached to the <br /> I code compliance form submitted to <br /> i the building department when the <br /> j building is permitted or, in the event <br /> ;the mechanical permit is obtained at a <br /> i later time,the sizing calculation shall <br /> be submitted with the application for <br /> the mechanical permit. <br /> C403.2.2 ;HVAC systems and equipment ;❑Complies <br /> [F127]3 capacity does not exceed calculated ;❑Does Not <br /> loads, <br /> ;❑Not Observable <br /> ❑Not Applicable <br /> C403.2.4. !Heating and cooling to each zone is '❑Complies <br /> 1 controlled by a thermostat control. UDoes Not <br /> [F147]3 !Minimum one humidity control device <br /> 1 per installed ;[]Not Observable <br /> humidification/dehumidification ;❑Not Applicable <br /> system. <br /> C403.2.4. {Heating and cooling to each zone is ',❑Complies <br /> 1 controlled by a thermostat control. ;❑Does Not <br /> [FI47]3 Minimum one humidity control device <br /> per installed ;❑Not Observable <br /> humidification/dehumidification !❑Not Applicable <br /> fsystem. <br /> 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) <br /> Project Title: Planet Fitness-Zephyrhills, FL Report date: 04/09/20 <br /> Data filename: C:\Users\msaarem\Dropbox\ProductionL2020.013 Planet Fitness-Zephyrhills, FL Mar\20.013 Page 14 of 18 <br /> Planet Fitness-Zephyrhills, FL-ComCheck.cck <br />
The URL can be used to link to this page
Your browser does not support the video tag.