Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the.2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall.be sodded before final at least 10 <br /> feet around the structure: <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot.water pipe with'a minimum-thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31;inch (1.9.1 mm)and larger in nominal diameter: <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water-heater to a distribution manifold:. <br /> Piping located under a floor slab: <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation-systems. <br /> 25: Blower door test shall be provided before <br /> 26. A copy of the eneM cacls shall be with permit at all times <br /> 27.'Copy of final-insulation report shall be provided ivith permit before finab <br /> 28. No fence, pool or enclosure :is issued with:this.permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6'h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />