Laserfiche WebLink
23..Tamper- Resistant.Receptacles in accordance with 406.11. of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water.'pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping:V. inch (19.1 mm)and larger in nominal diameter._ <br /> Piping.serving more than one dwelling unit. <br /> Piping located.outside the conditioned space. <br /> Piping from the:water heater to a distribution manifold. <br /> Piping.located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower:door-test shall be provided before C.O. <br /> 26. A copy of the energy cacls shall be with permit at all times. <br /> 2Z, Copy offiftial-insulation report shall be provided with permit before rnab <br /> 28.No fence, pool or screen enclosure :is issued-with A&permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-.:Florida Building Code 6t' Edition <br /> R.O.W-Right of Way <br /> A.D.A.-.Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />