Laserfiche WebLink
k <br /> 23, Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots:shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot.water-pipe insulation <br /> Insulation for hotwater pipe with a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> follow* ing: <br /> Piping V.inch (19.1 mm)and larger in.nominal diameter: <br /> Piping serving more than.one dwelling unit: <br /> Piping located outside the conditioned space..,, <br /> Piping from the water heater to:adistribution manifold:. <br /> Piping located under,a floor slab: <br /> Buried in piping.' <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25: Blower door test shall be Provided before C.O <br /> 26. A cony of the enerey-cacls-shall be with uermit at all times <br /> 27. Copy of final insulation Yeport-shall-be provided with permit before I L <br /> 28. No fence,pool or screen-enclosure :is issued with this.permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.G.Florida Building Code Oh Edition <br /> R.O.W.-Right of Way. <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />