My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-393
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2022 4:31:13 PM
Creation date
3/3/2022 4:31:12 PM
Metadata
Fields
Template:
Building Department
Company Name
LENNAR HOMES LLC
Building Department - Doc Type
Permit
Permit #
20-393
Building Department - Name
LENNAR HOMES LLC
Address
2991 LYTTON HALL DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. <br /> Q <br /> Single Family Dwelling <br /> Plan Review Comments . <br /> 1. 'F.F.E.shall be a minimum of-8" above the road elevation and an engineered-site plan. ' <br /> 2.' Lots shall be graded to-comply-with R401.3:of the F.B.C. . <br /> 3: Compaction test required if 24':or more.of fill_dirt is brought in at any one,place. <br /> " 4: -Tie iri survey required before pouring concrete: <br /> 5. "'Driveways require.a R:O. use permit: All 4 sides of driveway thru the sidewalk shall have <br /> expansion material.'. <br /> 6: --All setbacks shall be'met. <br /> 7 :All property:markers sliall be uncovered,and:marked at time of first inspection. . <br /> 86: All A.D.A.requirements shall be met:_: <br /> 9: No electric,.plumbing;mechanical, or.framing shall.be:covered without an inspection and .. <br /> approval first. <br /> 10: All Garages shall comply with section R302:6 of the F.B.-C. (Fire-Separation): <br /> 11. Appliances shi ll.not be.installed in a location where"subject_to mechanicai.damage unless- <br /> protected by approved barriers. M303:4 of the RRQ <br /> 12. Water heaters shall comply with section P607.3 of the F.B.C: <br /> foundation supports for A/C units.shall be'raised at least 3" above'finished grade. M1308:1: .: <br /> . 14..Retum air iri all bedrooms: F.B:C. M1620:4 <br /> 1.5. Smoke detectors are to be-installed in accordance with_R313.1.of.the.F.B.C. <br /> 16.All glazing requirements are to be in accordance with R308A of the F.B:C: <br /> .17. All means.of egress are to be in accordance with R311 of the RB.C: <br /> , . <br /> 18. .'Green:gypsum-board" shall not-be used as a backer in showers or tubs.R702:4:2 F B.C. <br /> 10: Combination-type AM breakers are required at-all locations requiring_an AM type breaker <br /> 20. Carbon monoxide.alarms will be required in new construction that fossil-burning heating <br /> or appliances or an attached garage.- Theyshall be installed in accordance with the F.B.C. <br /> .21._All plumbing,mechanical; and electrical shall'b.e separate from unit to unit: This includes all <br /> underground:plumbing and.electric. <br /> 22: All 201.6-N:E.C. Codes-will be enforced: <br />
The URL can be used to link to this page
Your browser does not support the video tag.