Laserfiche WebLink
l <br /> 1 <br /> 21 Tamper- Resistant.Receptacles in accordance with 406.11 of the 20161 N.E:C <br /> 24. In accordance with the Land Devel.OP <br /> meet Code,lots.shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe.insulation <br /> Insulation for-hot water pipe-with-a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following': <br /> Piping V, inch (1.9.1 mm)and larger-in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located_outside the conditioned space. <br /> Piping from the:water heater to a distribution manifold:- <br /> Piping:located under a floor slab. <br /> Buried in piping. <br /> Supply and:return piping in recirculation systems other than demand recirculation systems. <br /> 25.'Blower door test shall be provided-before C.O. <br /> 26 A copy of the energy:cacls shall be with permit at all times: <br /> 27. Copy of final:insulation report shall be provided with permit before fnal <br /> 28. No fence,-poor onscreen enclosure :is issued with A&permit <br /> F.F.E.-Finished Floor Elevation <br /> RB.C-Florida Building Code 6a'Edition <br /> R.OM.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />