Laserfiche WebLink
21 Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots_ shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R4W.5.3Hot_water pipe insulation <br /> Insulation for hot-Water'pipe with a minimum thermal resistance (R-value) of R-3 shall. be applied to the <br /> following:: <br /> Piping�h inch-(19.1 mm)and larger in.nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold, <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation-systems. <br /> 25: Slower door test shall be provided before C.O: <br /> 26. A cony of the energy cacls-shall be with permit at all times <br /> 27. Cony of final insulation report shall be provided with permit before rinaL <br /> 28. No fence,pool or screen enclosure is issued with ahis permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric.Code(2016) <br />