Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 NEC <br /> 24. In accordance with the Land Development Code, lots_shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> insuiatiah for hot water pipe With a minimum thermal resistance(R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31;inch (1.9.1 mm)and larger in nominal diameter. <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold. <br /> Piping located under'a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower;door test shall be proviided before C.O. <br /> 26.A copy of the enerw cacls shall be.with perneit at all times. <br /> 27. Copy of final insulation Yeport shaft—&provided with permit before finaii <br /> 28.No fence,pool or screen enclosure :is issued with:thispermit <br /> F.F.E.-Finished Floor-Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />