My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-513
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 8:13:32 AM
Creation date
3/4/2022 8:13:30 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-513
Building Department - Name
ADEYEMI,REBECCA
Address
6014 ZEPHYR RIDGE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
467 Swan Ave • Hohenwald,TN 38462 • (800) 284-7437 • www.oIlvertechnologles.com • Fax (931) 796-8811 <br /> OLIVER TECHNOLOGIES,INC. <br /> FLORIDA INSTALLATION INSTRUCTIONS FOR THE <br /> MODEL 1101"V"SERIES ALL STEEL FOUNDATION SYSTEM <br /> MODEL 1101"V"(Steps 1-14) <br /> LONGITUDINAL ONLY:Follow Steps 1-9 <br /> LATERAL ONLY:Follow Steps 1-3 and Steps 10-14 <br /> ENGINEERS STAMP FOR CONCRETE APPLICATIONS:Follow Steps 1 S-18 ENGINEERS STAMP <br /> 1.SPECIAL CIRCUMSTANCES:If the following conditions occur-STOP!Contact Oliver Technologies at 1-800-284-7437: <br /> a)Pier height exceeds 48" c)Roof eaves exceed 16" e)Location Is within 1500 feet of coast <br /> b)length of home exceeds 76' d)Sidewall height exceed 96" <br /> INSTALLATION OF GROUND PAN <br /> 2.Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan(C). <br /> 3.Place ground pan(C)directly below chassis I-beam.Press or drive pan firmly into soil until flush or below soil then install pier per <br /> manufacturer's instructions or per Florida Regs. <br /> SPECIAL NOTE:The longitudinal"V"brace system may also serve as a pier under the home and should be loaded as any other pier. <br /> It is recommended that after leveling piers,and one-third inch(1/3")before home is lowered completely on to piers,complete <br /> steps 4 through 9 below then remove jacks. <br /> INSTALLATION OF LONGITUDINAL"V"BRACE SYSTEM(Model 1101 L"V") <br /> NOTE:WHEN INSTALLINGTHE LONGITUDINAL SYSTEM ONLY,A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED.SOIL TEST PROBE SHOULD BE <br /> USED TO DETERMINE CORRECTTYPE OF ANCHOR PER SOIL CLASSIFICATION.IF PROBETEST READINGS ARE BETWEEN 175&275 A 5 FOOT ANCHOR MUST <br /> BE USED.IF PROBETEST READINGS ARE BETWEEN 276&350 A 4 FOOT ANCHOR MAY BE USED.USE GROUND ANCHORS WITH DIAGONALTIES AND <br /> STABILIZER PLATES EVERY 5'4".VERTICALTIES ARE ALSO REQUIRED ON HOMES SUPPLIED WITH VERTICALTIE CONNECTION POINTS(PER FLORIDA REG.). <br /> 4.Choose one of the approved longitudinal tube installations;either Diagram A or B.Then select the correct square tube(E)length from the <br /> diagram for appropriate pier height at support location or cut and drill 1.5"square tube to achieve appropriate length. <br /> PIER HEIGHT 1.25" 1.50" PIER HEIGHT 1.50" <br /> (40"Min.- 45"Max.) Tube Length Tube Length 9/16"Dia.(562)hole 7 (40"Min.- 60'Max.) Tube Length <br /> 7 3/4"to 25" 22" 18" 1 "14 :...,::, <br /> 7777, <br /> „ <br /> 32'; ;:::18.:`:.' '.::.:: � 18 to 25 28 <br /> 33"to 4l" 18" <br /> " " " <br /> S4 30 to 40 44 <br /> Diagram 0.7s� :36"•to'g8'',>'' ';: '. , 54b -:',.` : , <br /> Diagram B <br /> 5.Install(2)of the 1.50"square tubes(E)into the"U"bracket(J),insert carriage bolt and leave nut loose for final adjustment. <br /> 6.Place I-beam connector(F)loosely on the bottom flange of the I-beam. <br /> 7.(For Diagram A installation)Slide the selected 1.25"tube(E)into a 1.50"tube(E)and attach to I-beam connectors(F)and fasten loosely <br /> with bolt and nut.(For Diagram B installation)Attach the selected 1.5"tubes(E)to the I-beam connectors(F)and fasten loosely with bolts <br /> and nuts. <br /> 8.Repeat steps 6 through 7 to create the"V"pattern of the square tubes loosely in place. <br /> 9.Using standard hand tools tighten all nuts and bolts.(For Diagram A installation only,secure 1.25"and 1 .50"tubes using <br /> four(4)1 /4"-14 x 3/4"self-tapping screws in pre-drilled holes.) <br /> INSTALLATION OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM(Model 1101 T"V") <br /> THE MODEL 1101"V"(LONGITUDINAL&LATERAL PROTECTION)ELIMINATE5THE NEED FOR STABILIZER PLATES&FRAMETIES. <br /> NOTE:THE USE OFTHIS SYSTEM REQUIRES VERTICALTIES SPACED AT 5'*'. <br /> FOUR FOOT(4)GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. <br /> 10.Install remaining vertical tle-down straps and 4'ground anchors per home manufacturer's Instructions.NOTE:Centerline anchors <br /> to be sized according to soil torque condition.Any manufacturer's specifications for sidewall anchor loads in excess of 4,000 lbs. <br /> require a 5'anchor per Florida Code. <br /> 11.Select the correct square tube brace(H)length for set-up lateral transverse at support location.The lengths come in either 60"or <br /> 72"lengths.(With the 1.50"tube as the bottom tube,and the 1.25"tube as the Inserted tube.) <br /> 12. Install the 1.50 transverse brace(H)to the ground pan connector(D)with bolt and nut. <br /> 13. Slide 1.25"transverse brace into the 1.50"brace and attach to adjacent I-beam connector(I)with bolt and nut. <br /> 14.Secure 1.50"transverse arm to 1.25"transverse arm using four(4)1 /4"-14 x 3/4"self-tapping screws in pre-drilled holes. PM-1 <br /> PATENT#6634150&OTHER PATENT PENDING Revision 08/23/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.