Laserfiche WebLink
D <br /> 4 <br /> f <br /> Single Family Dwelling <br /> Plan Review Comments <br /> 1. VTI...shall.be a minimum of 8" above the road elevation and an engineered site plan. <br /> 2: Lots shall be graded to comply with R401:3 of the F.B.C. <br /> 3: Compaction test required if 24" or more of fill dirt is brought in at any one place. <br /> 4: tic'in survey required before pouring concrete. <br /> 5: Driveways require.a R.O.W. use permit. All 4 sides of driveway thru the sidewalk shall have <br /> expansion material. <br /> 6. All setbacks shall be met. <br /> -7. All property markers sliall be uncovered,and marked O time of first inspection. <br /> 8: All A.D.A.requirements shall be met: <br /> 9: .No electric,.plumbing;mechanical, or framing shall be covered without an inspection and <br /> -approval first. <br /> 10.. All Garages shall comply with section R302:6 of the F.B.C. (Fire Separation): <br /> 11. Appliances sliall not be installed in a location where subject.to mechanical damage unless <br /> protected by approved barriers. M303.,4 of the FB.0 <br /> 12. water heaters shall coinply with section P607.3 of the FAIC. <br /> 13. Foundation supports for A/C units shall be raised at least 3" above finished grade. M1308:1 . <br /> 14. Return air in all bedrooms. RB:C. M1620.4 <br /> 15. Smoke detectors are to be installed in accordance with R313:1 of the F.B.C. <br /> 16.All glazing requirements are to be in accordance:with R308.4 of the RB:C: <br /> 17. All means.of egress are to be in accordance with R311 of the F.B.C. <br /> 18. "Green gypsum board"shall not be used as a backer in showers or tubs. R702:4.2 F.B.C. <br /> 19. Combination-type AFCI breakers are required at all locations requiring an AFCI type breaker. <br /> 20. Carbon monoxide alarms will be required in new construction that uses fossil-burning heating <br /> or appliances or an attached garage.- They shall be installed in accordance with the F.B.C. <br /> 21. All plumbing,mechanical, and electrical shall be separate from unit to unit: This includes all <br /> underground plumbing and electric. <br /> 22. All 2016 N.E.C. Codes will be enforced. <br />