Laserfiche WebLink
23. Tamper-Resistant.Receptacles in accordance with 406.11 ofthe 2016 N:E.-C <br /> 24. In accordance with the Land Development Code, lots shall.be sodded before final at least.10. <br /> feet around the structure. <br /> 25. R403.5.3Hot water'pipe insulation. <br /> Insulation for hot water pipe with'a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following:. <br /> :. <br /> Piping=1. inch (1.9.1,mm)and larger in.nominal diameter.; <br /> Piping,serving more than:one dwelling unit. <br /> Piping located outside the conditioned space. <br /> -Piping from the water.heater to adistribution manifold:. <br /> Piping located under.a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation-systems. <br /> 25:Blower door test shall be proviided.before C.O: . <br /> 26.A copy of the eneruy cads shall be ivith werntit at all tines <br /> 27.. Copy of j%atinsulation report shall be provided ivith permit before final <br /> 28. No fenee, pool or screen enclosure :is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> P.B.C= Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016). <br />