Laserfiche WebLink
SpeedSeall" Foot Installation <br /> Q Layout Speed-SealTm Foot locations -on. roof <br /> and mark locations for fasteners using a �. <br /> marking crayon or chalk based on :rafter <br /> location and these rules: ,. <br /> . 1) Pilot hole should be.located L573" from the <br /> bottom edge.of shingle course above <br /> 2) SpeedSealTm Foot should never. be.installed . <br /> across two shingle courses <br /> SpeedsealTm Foot may be.installed:over the-vertical seam: <br /> between singiles in the same row. <br /> Using locations drawn on roof during system <br /> layout, drill a 3 16 pilot' hole, into roof <br /> framing..-member. <br /> :Remove any dirt or debris from roof surface and properly seal any <br /> missed pilot holes with a flashing card before SpeedSeallm Foot is.-. <br /> installed: <br /> Turn SpeedS.ealTM .Foot over and :apply roof <br /> sealant,:filling the cavity formed by the. <br /> sealant :ring. <br /> 2 <br />