My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1411
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 2:02:43 PM
Creation date
5/9/2022 7:19:02 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
21-1411
Building Department - Name
ROJOS,DOLORES
Address
5315 KING ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SpeedSea JTm Foot • <br /> 0, Attach SpeedSealTm Foot to roof using .`= <br /> a 5/16" sealing lag screw. Dr.iv.e the lagrsT <br /> screw into the .picot hole and rafter for a' - <br /> recommended minimum 2-1/2" embedment.. <br /> .3 ref U�N�7}`.y 3y�.'.6A=i�`S'r•:�r"ft'Gti:' <br /> 0 As .the lag screw is being driven into the2 -s <br /> roof, watch rubber gasket on underside <br /> of sealing washer for compression: Stop ^ =� <br /> driving the lag screw when the gasket <br /> becomes visible- <br /> :around the edge of the . <br /> Washer <br /> Over tightening the lag screw will damage the rubber <br /> gasket. <br /> As Spee.dSealTm Foot is tightened to the roof <br /> sealant will ooze from the lower cavity of ! Yr <br /> the L Foot as .an indicator of proper sealing. ._ -•a : , <br /> 1f no sealant is seen, remove Spe, edSeaITM <br /> Foot from roof and add more sealant before lrrzv: ; <br /> reinstalling. - qy <br /> SpeedSeal- m Foot is now ready for the remaining Ultra Rail and <br /> .module 'installation. <br /> Notes: <br /> 877-732-2860 www.snapnrack.com contact@snapnrack.com <br /> ©2020 by SnapNrack Solar Mounting Solutions.All rights reserved <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.