Laserfiche WebLink
THermaL Expansion anD BonDi.nG <br /> JL <br /> A thermal expansion gap is required per <br /> each.continuous 40'length of modules. Bond Path <br /> Grounding Lug <br /> Omit-a coupling and leave a 2"gap in <br /> .the Rock-It Array Skirt and also-between / —Equipment <br /> ooruiducte�t(EGQ-ding <br /> generally to earth. <br /> the modules at:that point. ground <br /> Rock-It Coupling <br /> ■ Rock-It Mount <br /> If e —Rock-It Array Skirt <br /> BracKeT sPacinG <br /> Portrait Orientation Landscape Orientation <br /> Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"OC. <br /> 32mm modules:Max east/west bracket spacing is 48"OC. <br /> Spacing may vary depending upon project specific structural requirements,i.e.high snow and wind load <br /> areas may require lesser spacing E-W than the maximum. <br /> sTaGGereD LagOUT canTILever anD OFFseT <br /> Staggered Mounting Points <br /> Cantilever <br /> Offset �► <br /> .Rock-It Mount _Rock-It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait <br /> orientation installations,check layout prior to installing. <br /> The.array layout instructions in this installation manual offer a <br /> general overview of layout. Periodically;due to a variety of Offset: Offset from all roof edges depends on wind speed,snow <br /> factors(roof obstacles,shading,etc.)other.layouts are required. loads,local fire and building codes.per location <br /> www.-ecofastensolar.com info@ecofastensolar.com 877-859-3947 14 <br />