Laserfiche WebLink
j <br /> 23. Tamper-Resistant.Receptacles in accordance with 406.11 Of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot-water.pipe insulation. <br /> Insulation for hot water pipe with,a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping.-1, inch (19.1 mm) and larger in,nominel diameter. <br /> Piping.serving more than one dwelling unit.- <br /> Piping located outside'the conditioned space. <br /> Piping from the water heaterto a distribution manifold. <br /> Piping.located under a floor slab.- <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems: <br /> 25. Blower door test shall be provided before C.O: . <br /> 26. A copy of the energy cacls shall be with permit at all times <br /> 27. Copy.of flitial.insulations report-shall be prouided with permit before rinal <br /> 28.No fence, pool or screen enclosure .is issued with:this-permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />