Laserfiche WebLink
23. 'Pamper- Resistant Receptacles in accordance with 406.11 of the 2016 N:E.0 <br /> 24. In accordance with the Land Development Code,lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25; R403.5.3Hot.Water.pipe insulation. <br /> Insulation for hot_water pipe With.'a minimum thermal resistance_(R-value) of R-3 shall.tie applied to the <br /> following::. <br /> Piping:/; inch (1.9.1 mm)and larger in:nominal.diameter: <br /> . <br /> Piping.serving more than one dwelling unit.' <br /> Piping located.outside the conditioned space;. <br /> Piping from the water heater to.a distribution manifold.- <br /> Piping.located under,a floor slab: <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems: <br /> 25. Blower door test shall be provided,before C.O: <br /> -26.A copy of the energy eacls shall be with permit at all times. <br /> 27. Copy of final insulation report shall be provided with permit before fnab <br /> 28. No fence.-pool or screen enclosurejs issued with:thispermit. <br /> F.F.E-.-Finished Floor Elevation <br /> RB.0 Florida Building Code 6th Editioni <br /> R.O.W;-Right of Way . <br /> Ab'.A.-Americans with Disabilities Act, N.E.C.-National Electric Code (2016) <br />