Laserfiche WebLink
DocuSign Envelope ID:BD419273-3CB8-41DB-85F5-FF7C79AFD97B <br /> EXPERIENCE MATTERS, <br /> • ADVANCED ® ROOFING.= <br /> ESTABLISHED 1983 <br /> Florida's Premiere Commercial Roofing Contractor <br /> Committed to Quality <br /> To: Job Name: <br /> Dev Ramesh Motwani FAMILY DOLLAR&WIN_ N DIXIE-OAK VIEW PLAZA <br /> Merrimac Ventures <br /> 2434 E. Las Olas Blvd. Address: <br /> Ft. Lauderdale, FL 33301 38901 CR 54 <br /> (954)629-5708 Zephyrhills, FL 33542 <br /> Date: Reference: <br /> November 20, 2020 Carlisle TPO Recovery <br /> We are pleased to submit the following proposal for your consideration on the above referenced premises as <br /> follows. We agree to provide all labor, material,tools, equipment and proper insurance with excess liability of <br /> twenty-six(26) million dollars. <br /> PERMITTING AND TESTING <br /> Permitting and testing that is required to secure a roofing permit is included in our bid proposal.The <br /> following test will be completed in order to pull your permit: <br /> • Engineered signed and sealed design wind pressure calculation. <br /> • Miami Dade Product Approval NOA for the proposed system. <br /> • Roof plan with elevations of deck and parapet walls. <br /> • Perform moisture scan in accordance with Florida Building Code 2017 Edition-Testing.Application <br /> Standard TAS 126-95.1. <br /> • Perform fastener test procedure for field withdrawal resistance in accordance with Florida Building <br /> Code 2017-Testing Application Standard TAS 105-95.1. <br /> • Provide roof attachment and.engineered fastening pattern in accordance with ASCE 7-10 and Florida <br /> Building,Code 2017 Edition Roof Application Standard RAS 117. <br /> • Notice of Commencement filing with the county and fees before the start of the project. <br /> PREPARATORY WORK <br /> 1. At metal deck, remove existing vertical flashings and penetration flashings. Prepare the existing roof <br /> system to receive new recovery roof system. <br /> 2. At small roofs at front of property,cut and remove all existing roofing down to the plywood deck. <br /> Remove only as much roofing in one working day period that can be replaced.Water cut off to be <br /> installed at the end of each working day to assure a watertight condition. <br /> 3. Broom clean the entire roof. Remove all dust and dirt,then thoroughly clean with a power air blower. <br /> 4. Remove roofing debris and cart away to the local dump site or landfill. <br /> 5. Existing wood decking will be re-nailed to meet South Florida Building Codes. <br /> ROOF INSULATION <br /> At metal deck,furnish and install%" inch EPS FanFold roof insulation with an aged R-Value of 1.75. Each <br /> board to be mechanically fastened utilizing coated fasteners and Rhinobond insulation plates. <br /> Page 1 of 5 <br />