Laserfiche WebLink
Uocu5lgn Envelope ID:bU419Z(3-3G136-41U9-85F5-FF7C79AFD97B <br /> HARD BOARD INSULATION <br /> At wood deck,furnish and install 0.25 inch DensDeck roof deck insulation to entire deck.All boards to be <br /> mechanically fastened utilizing coated fasteners and Rhinobond plates. <br /> SINGLE PLY ROOFING SYSTEM <br /> 1. Furnish and install new Carlisle 60 MILTPO single ply roof system. New roof system to be heat <br /> induction welded to the Rhinobond plates in accordance with manufacturer specifications and local <br /> building code requirements. <br /> 2. All detail work including vent pipes, roof vents, and other miscellaneous roof projections to be done <br /> in accordance with Carlisle standard details. <br /> 3. Advanced Roofing, Inc. is an approved applicator of Single Ply Systems for Carlisle. <br /> TPO WALL/CURB FLASHINGS <br /> Furnish and install new fully adhered 60 MIL Carlisle Sure-Weld TPO membrane applied to prepared vertical <br /> surfaces utilizing Cav Grip spray adhesive per manufacturer approved details. <br /> MISCELLANEOUS INSTALLATIONS <br /> 1. Shop fabricate and install new TPO Clad metal drip edge. Set same in sealant and flash per <br /> manufacturer's recommendations. <br /> 2. Shop fabricate and install new 24 gauge galvanized kynar coping cap metal. Exterior face to be <br /> hemmed and cleated with a continuous clip. Interior face to be mechanically fastened and sealed <br /> with rubber grommets or sealant. <br /> 3. Shop fabricate and install 24 gauge kynar galvanized surfacing mounted counter flashing. All metal to <br /> be nailed off for proper securement and sealed with a caulk bead of sealant. <br /> 4. Furnish and install new pre-manufactured Split Pipe Boot flashing at pipe and stand leg penetrations. <br /> Flashing to be heat welded to membrane, and caulked and clamped at top side. <br /> 5. Furnish and install new unsupported single ply membrane field-manufactured flashing at abnormal <br /> shaped penetrations. Flashing to be heat welded to membrane and caulked and clamped at topside. <br /> 6. Shop fabricate and install new 24 gauge galvanized line jack goose necks to house refrigerant and gas <br /> lines for a/c units. <br /> 7. Shop fabricate and install 24 gauge galvanized slip metal counter flashing at curb locations. <br /> 8. Furnish and install new expansion joint cover flashing per manufacturer's recommendations. <br /> 9. Furnish and install new TPO walkway pads at the service side of existing HVAC units and at roof hatch. <br /> This includes up to 50 LF. <br /> 10. Furnish and install building department code approved pipe supports for existing PVC condensate <br /> lines on roof system.This includes up to 310 LF. <br /> 11. City or county roofing permit,crane and sales tax are included. <br /> 12. Digitized roof drawing and photographs depicting work areas and details for this work scope are <br /> attached. <br /> CLARIFICATION&EXCLUSIONS <br /> • All costs associated with utility line interface with roofing activities are excluded from this proposal. If <br /> utilities exist on the roof it is the owner's responsibility to pay for any required utility protection, <br /> shutdown, and standby power to allow for ARI to safely execute the project. <br /> • The cost to relocated one split unit on to a new code approved stand is included in the base bid.This <br /> work will be required per Florida Building Code. <br /> • Raising and/or removing steel I-Beams and mechanical units on I-Beams are not included in the base <br /> bid. <br /> Page 2 of 5 <br />