My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1594
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1594
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 2:44:34 PM
Creation date
5/9/2022 11:11:20 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
21-1594
Building Department - Name
BRYK,WILLIAM & PATRICIA
Address
6777 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPORTANT SAFETY INSTRUCTIONS <br /> . D ALL INSTRUCTIONS & SAFETY WARNINGS PRIOR TO INSTALLATION <br /> NOTE: SAVE THESE INSTRUCTIONS <br /> This manual contains important instructions that shall be followed. during.installation and maintenance of the- <br /> Soltection RJ-1 rooftop-junction box with flashing. <br /> 1ALETHAL.VOLTAGES ARE.PRESENT DURING THE INSTALLATION, OPERATION AND:SERVICE OF THIS EQUIPMENT. <br /> PROPER PRECAUTIONS MUST BETAKEN AT ALL TIMES TO ENSURE THE SAFETY OF THE SERVICE PERSONNEL. . <br /> SAFETY WARNINGS & CAUTIONS <br /> • Only qualified personnel or licensed electricians should install this product and the instructionsherein are <br /> provided-for those individual(s)only. <br /> ■ To reduce the.risk of electric shock, injury, or death, all electrical wiring and connections must be <br /> performed by qualified personnel. <br /> ■ Lethal voltages are present during the installation, operation, and servicing of this equipment. Proper <br /> precautions must be taken at all times to ensure the safety.of the service personnel. <br /> ■ Follow state and federal. Occupational Safety and Health Administration (OSHA) .guidelines- and <br /> regulations when installing this product. <br /> ■ Utilize proper Personal Protective Equipment(PPE)as required per national and local regulations-as well <br /> as for installation best practices. <br /> ■ Install this.apparatus-in accordance with ANSI/NFPA 70., National Electrical Code. (NEC). Follow.all <br /> national or local.electrical codes. <br /> ■ Install, operate, and use this product in.a.manner consistent with.the instructions provided: Failure to <br /> follow the procedures indicated may result in roof leaks,-property damage,-or-consequential damage. <br /> www.soltection.com Soltection RJ-1 Installation Manual Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.