Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.41 of the 2016 N.-E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25:.R403.5.3Hot water"pipe insulation. <br /> Insulation for hot-water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping /< inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than_one dwelling unit. <br /> Piping located outside the conditioned space;. <br /> Piping from the:water heater to'.a distribution manifold.. <br /> Piping located under a floor slab. <br /> Buried in piping.. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower.door test shall be provided before C.Q: <br /> 26. A copy of the enerzy:cacls shall be with permit at all times- <br /> 27.. Copy offlnatinsulation report shaft be provided with pertnit before rInab <br /> 28..No fence,pool or'screen enclosure is issued with:this-permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6f'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />