Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 ME <br /> 24. In accordance with the Land Development Code, lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water,pipe insulation. <br /> Insulation for hot water. pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: - <br /> Piping_V/ inch (19.1 mm) and larger in nominal diameter.. <br /> Piping serving more than one dwelling unit. <br /> Piping located,outside the conditioned space. <br /> Piping from the water heater to a distribution manifold:. <br /> Piping.located under_a floor slab. <br /> Buried-in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26 A copy of the ener,Qy cacls shall be with'pernut at all times <br /> 27. Copt/of finalinsulation report shall be provided with permit before final <br /> 28:No fence, pool or screen enclosure :is issued with this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W:-Right of Way <br /> A.D.A.-.Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />