My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1435-22 Abbott Park PUD Master Plan Amendment-Unknown Recorded Document-20220513-Document 1-001
Zephyrhills
>
Administration
>
City Clerk
>
Vault Files
>
ORDINANCES
>
2022
>
1435-22 Abbott Park PUD Master Plan Amendment-Unknown Recorded Document-20220513-Document 1-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 1:24:06 PM
Creation date
5/13/2022 1:23:54 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OR BK 10613 PG 2116 Page 4 of 8 <br />instruments to be used to convey in fee simple the above-mentioned areas to said association or <br />community development district. <br />7. In addition to these PUD conditions of approval, the developer shall comply with <br />all City of Zephyrhills ordinances including all impact fee ordinances. In the event <br />ordinances/resolutions are subsequently adopted by the City Council including, but not limited <br />to, utilities, public safety, impact fee or other, the developer shall be required to comply with <br />same except if such ordinances/resolutions materially and adversely change any conditions of the <br />approval granted herein. <br />8. All internal local roadways, including streetlights, shall be owned and maintained <br />by the Zephyr Lakes Community Development District, established by Ordinance No. 1232-14 <br />on June 23rd, 2014. <br />9. The developer has submitted an updated traffic study which has been reviewed by <br />City staff and Kimley-Horn, the City's consultant. The following issues shall be addressed based <br />on comments provided from Kimley Horn: 1) The applicant must construct the warranted <br />eastbound turn -lane at the intersection of Kossik Road and project access; 2) at the time <br />Applicant proposes a connection to Wire Road, Applicant will apply for a right-of-way use <br />permit from Pasco County, notify the City of Zephyrhills Planning Department of the same, and <br />the County will evaluate the connection and make recommendations for any improvements to <br />Wire Road at the time; and 3) Applicant shall meet with the City to discuss future traffic control <br />of the intersection of Pretty Pond Road and Wire Road. The Developer shall be required to <br />address City/engineer comments accordingly on the construction plans. An updated traffic <br />impact analysis will be required only if a unit increase is proposed. The developer shall apply <br />for a right-of-way use permit(s) from the appropriate governmental entity prior to <br />access/driveway connection, and shall comply with Pasco County's Access Management <br />Ordinance and Substandard road analysis standards, as applicable. <br />10. Developer shall convey to City or Pasco County as appropriate, at no cost to the <br />City or Pasco County, up to 47.5 feet of right-of-way along Wire Road as may be required by <br />Pasco County. The easternmost 30 feet of right-of-way shall be dedicated to Pasco County, and <br />the westernmost 17.5 feet of right-of-way shall be dedicated to the City of Zephyrhills. <br />11. Developer shall convey to the City, at no cost to the City, 50 feet of right-of-way <br />along Pretty Pond Road and 80 feet of right-of-way for Dairy Road extension on its property as <br />shown on the PUD Master Plan. In addition the developer shall construct Dairy Road to City <br />street standards as reflected on the PUD Master Plan from the south boundary of the property to <br />the entrance of Phase IV 4 as shown on the PUD Master Plan. <br />12. The developer shall convey to Pasco County the proposed 120 ft. right of way for <br />Kossik Road as depicted on the PUD Master Plan. In addition, the developer shall: <br />a. Design and permit Kossik Road from the eastern boundary of the Commercial <br />Parcel (at its existing eastern terminus) to Wire Road as a two 2 -lane collector <br />road and construct 2 lanes thereof. Subject to any Executive Order extensions <br />previously -approved by the City, Applicant shall construct or bond such section <br />of Kossik Road by December 31, 2022. In lieu of any obligation to design, permit <br />or construct lanes 3 and 4 of Kossik Road, Applicant hereby consents to the <br />City's imposition of a transportation impact fee surcharge of $1,000 per unit on <br />all remaining, 291 un -platted units within the PUD (Phases 3, 4C, 5 and 6) (the <br />"Surcharge"). The Surcharge will be payable and collected by the City at the time <br />of the issuance of each certificate of occupancy for each such unit (the remaining <br />291 un -platted units in Phases 3, 4C, 5 and 6 of the PUD). Additionally, <br />Applicant is willing to, and does hereby, forego (subject to there being no appeal <br />of the subject rezoning) $59,000.00 worth of transportation impact fee credits that <br />Applicant is otherwise due from the City in accordance with Condition No. 23 <br />hereof for Applicant's design and engineering of the portion of Dairy Road lying <br />south of Kossik Road and north of the entry to Phase IV. The intent of the parties <br />is that Applicant is foregoing an amount roughly equal to the consideration it <br />received from Duke Energy's predecessor as part of its acquisition from <br />Applicant of the existing easement along the east end of the PUD (along Wire <br />
The URL can be used to link to this page
Your browser does not support the video tag.