Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development_Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25-. R401­5.3Hot water pipe insulation. . <br /> Insulation for hot water'pipe with a.minimum thermal resistance (R-value) of:R-3 shall.be applied to the <br /> following: <br /> Piping 31;inch (19.1 mm)and larger in.nominal diameter. <br /> Piping serving more-than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the:water heater to a distribution manifold: <br /> Pipi <br /> ng.located under.a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided beffore C.O: <br /> 26.A copy of the enemy:cacls shall be:with permit at all times <br /> 27. Copt/of rnal.insulation reoort shall-be provided with permit before final <br /> 28. No ence,-pool or'screen enclosure :is issued with.thispermi . <br /> F.F.E.-Finished Floor Elevation <br /> RB.0 Florida Building Code 6 b Edition <br /> R.O.W.--Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric.Code(2016) <br />