Laserfiche WebLink
23, Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> .24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> M R403.5.3Hot water pipe insulation <br /> insulation for hot.water. pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping V. inch (1.9.1 mm) and larger in. nominal diameter. <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside the conditioned space.- <br /> Piping from the water heater to a distribution manifold. <br /> Piping.located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower.door test shall be provided before C.Q: <br /> 26. A copy of the energy cacls shall be with permit at all thnes <br /> 27. Copy of Anal insulation report shall be provided with permit before rnaL <br /> 28. No fence, pool or screen enclosure:is issued with this.permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.--Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />