Laserfiche WebLink
, s <br /> COMFORT11 <br /> SYSTEMS %0 A., <br /> Quality People.Buildink Solutions <br /> INTRACOMPANY PROJECT MEMORANDUM OF AGREEMENT <br /> Agreement made as of the 7th day of August 2020 <br /> Between Comfort Systems USA, Strategic Accounts / <br /> (Division of Comfort Systems USA) <br /> 2655 Fortune Circle West Suite E <br /> Indianapolis, IN 46241 <br /> And Operating Company: CSUSA Consery <br /> 6350 118th Avenue North <br /> Largo, FL 33773 <br /> For this project: <br /> Wells Fargo/BE#144909 Project No. C00184 <br /> Zephyr Commons PO#C00184001 <br /> 7780 Gall Boulevard BE# 144909 <br /> Zephyrhills, FL 33541 <br /> I. SCOPE OF WORK: <br /> Provide equipment, labor and materials to replace HVAC equipment per proposal (Exhibit A). <br /> Included in this scope of work is the following as it applies: <br /> • Operating Company shall coordinate all work with store manager each day. <br /> • Operating Company is responsible to verify equipment nameplate, specifications and voltage at <br /> delivery. Wrong equipment accepted by the Operating Company shall not be considered a change <br /> order. <br /> • All crane/helicopter cost and scheduling will be the responsibility of the Operating Company. <br /> • Operating Company shall provide all necessary permits and inspections per local and state codes. If a <br /> permit is not required, please provide a written statement indicating that permits are not required. <br /> • All reconnections of existing duct work and controls are the responsibility of the Operating Company. <br /> • All utility reconnections, gas, electric, and condensate piping will be the responsibility of the <br /> Operating Company. <br /> • Curb adaptor(s) shall be single stacked and fastened to roofed;in curb. Double stacking of curb <br /> adaptors is prohibited. <br /> • Equipment and curb adapters will be received at Operating Company's location or crane yard <br /> (Equipment should not be staged or stored on roof of location). <br /> • Completion time on the project is of the essence Estimated Completion Date 10/31/20. <br /> • Operating Company shall qualify Energy Management System (EMS) as per customer requirements. <br /> • Operating Company shall provide all smoke detectors as required by local code(s) and fire marshal. <br /> • Units shall be commissioned per factory standards, Et according to manufacturer specifications. <br /> • Operating Company shall provide EPA Record Maintenance documentation. Scope includes recovery of <br /> refrigerant from unit and disposal as per EPA regulations. <br />