Laserfiche WebLink
23. Tamper-'Resistant.Receptacles in*accordance with 406.11 of the 2016 N:E:C <br /> 24. In accordance with the Land Development Code, lots.shall be sodded before final at least:10.' <br /> feet around. .the structure: <br /> 25-. R403.5.Mot water pipe insulation. <br /> Insulation for hot_Water'pipe with a minimum thermal resistance(R-value) of R-3 shall.tie applied to the <br /> following: <br /> Piping,/<inch (1.9:1 mm) and larger, in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located.outside the conditioned space: <br /> Piping from the.water heater to a distribution manifold:. . <br /> Piping located under a floor siab: <br /> Buried in piping.. <br /> Supply and'return piping in recirculation-systems other than demand recirculation systems. <br /> 25.Blower.door test shall be proviided.before C.O. <br /> 26 A copy of the enemy cacls shall be:with permit at all tiines <br /> 27. Copy offinal'insulation retiortshall be provided with permit before final <br /> 28:No fence,pool or screen enclosure :is issued with:this permit. <br /> F.F.E.-Finished Floor Elevation . <br /> F.B.C-Florida Building Code Oh Edition' <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans With Disabilities Act N.E.C.-National Electric Code (2016) <br />