Laserfiche WebLink
x <br /> 23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hof water pipe insulation <br /> Insulation for Hot water pipe with a minimum thermal resistance (R.-value) of R-3 shall be applied to the <br /> following: - <br /> Piping.31. inch (19.1 mm) and larger in.nominal diameter, <br /> Piping:serving more than,one dwelling unit. <br /> Piping located outside the conditioned space:,, <br /> Piping from the water Heaterto a distribution manifold.. <br /> Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided-before C.O. <br /> 26. A copy of the energy cacls shall be with permit at all times <br /> 27. Copt/of final insulation report-shall-be provided with permit before f nab <br /> 28. No fence, pool or'screen enclosure :is issued with this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-.Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />