Laserfiche WebLink
OR BK 10730 PG 1511 Page 7 of 10 <br />2. In the case of private streets, dedication and maintenance shall be the responsibility of an appropriate <br />entity other than the City of Zephyrhills. The City of Zephyrhills will not be responsible for the maintenance <br />of any private streets. <br />3. Rights-of-way may be transferred by perpetual right-of-way easement, fee simple deed, or as otherwise <br />directed by Pasco County. All conveyances shall occur prior to the approval of the future site <br />development/construction plan or final plat, as may be applicable. All conveyances shall be clear of all <br />liens and encumbrances, including exemption from all covenants and deed restrictions. <br />F. Utilities/Waster Service/Wastewater Disposal <br />1. Utility plans for the entire development shall be submitted to the Utilities Department for review and <br />approval prior to or concurrent with submittal of the construction plans. This utility plan shall show, at a <br />minimum, the following: <br />a. Trunk sewer lines and life stations; <br />b. Main potable water lines and non -potable water lines, if applicable; <br />c. Sewage treatment facility locations, including discussion of the proposed method of treatment and <br />feasibility of a non -potable water system for irrigation; <br />d. The utility plans shall include AutoCAD and PDF electronic files and hydraulic analysis for the water, <br />wastewater and reclaimed water systems. <br />2. The developer shall construct all water and wastewater facilities within the development to current City <br />standards. A complete set of standards may be obtained from the Utilities Department. <br />G. Roadway Improvements/Access Management <br />1. Developer shall be required to design, engineer, permit and construct the following site access <br />improvements, where warranted by traffic analysis or other study, along Fort King and Eiland Boulevard: <br />a. West -bound right -turn lane(s) into the project on Eiland Boulevard; <br />b. East -bound left -turn lane(s) into the project on Eiland Boulevard; <br />c. South -bound right -turn lane(s) into the Project on Fort King Road; <br />d. North -bound left turn lane(s) into the Project on Fort King Road; <br />2. Developer shall be responsible for improvements to the intersection of Fort King Road and Eiland <br />Boulevard, limited to the south -bound right -turn lane from Fort King Road onto Eiland Boulevard. The <br />Developer shall be entitled to transportation impact fee credits related to such improvements. <br />H. Land Use <br />1. The residential and non-residential dimensional standards hall be as depicted on the PUD Master Plan, <br />limited to the following: <br />a. The maximum overall density of the project shall be 11.98 units per gross acre; <br />b. Area MF shall be limited to a maximum of 267 residential units and a maximum height of 4 stories; <br />