Laserfiche WebLink
DISABLED ACCESS NOTES I GENERAL NOTES <br />1. IN BUILDINGS AND FACILITIES, FLOORS OF A GIVEN STORY SHALL BE A COMMON LEVEL <br />THROUGHOUT, OR SHALL BE CONNECTED BY PEDESTRIAN RAMPS, PASSENGER <br />ELEVATORS OR SPECIAL ACCESS LIFTS. <br />2. FLOOR SURFACES SHALL BE SLIP -RESISTANT. <br />3. EVERY CORRIDOR AND AISLE SERVING AN OCCUPANT LOAD OF 10 OR MORE SHALL BE <br />NOT LESS THAN 44" IN WIDTH. <br />4. ABRUPT CHANGES IN LEVEL ALONG ANY ACCESSIBLE ROUTE SHALL NOT EXCEED 1/2" IN <br />HEIGHT. LEVEL CHANGES NOT EXCEEDING 1/4" MAY BE VERTICAL. BEVEL OTHERS WITH <br />A SLOPE NO GREATER THAN 1:2 <br />5. LATCHING AND LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN A PATH <br />OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, <br />PANIC BARS, PUSH-PULL ACTIVATING BARS, OR OTHER HARDWARE DESIGNED TO <br />PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING <br />HARDWARE. MOUNT DOOR OPENING HARDWARE BETWEEN 30" AND 44" ABOVE FLOOR <br />FINISH. <br />6. MAXIMUM PULL OR PUSH EFFORT TO OPERATE DOORS SHALL NOT EXCEED 8.5 POUNDS <br />FOR EXTERIOR DOORS AND 5 POUNDS FOR INTERIOR DOORS, MEASURED AT RIGHT <br />ANGLES TO HINGED DOORS AND AT CENTER PLANE OF SLIDING OR FOLDING DOORS. <br />CORRESPONDING DEVICES OR AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET <br />THE ABOVE STANDARDS. MAXIMUM EFFORT TO OPERATE REQUIRED FIRE DOORS MAY BE <br />INCREASED NOT TO EXCEED 15 POUNDS. <br />7. THE BOTTOM 10" OF ALL DOORS (EXCEPT SLIDING AND AUTOMATIC) SHALL HAVE A <br />SMOOTH UNINTERRUPTED SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEEL <br />CHAIR FOOTREST WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. PROVIDE A <br />10" HIGH SMOOTH PANEL ON THE PUSH SIDE OF NARROW FRAME DOORS. <br />8. EVERY REQUIRED ENTRANCE OR PASSAGE DOORWAY SHALL BE NOT LESS THAN 3' IN <br />WIDTH AND NOT LESS THAN 6-8" IN HEIGHT. DOORS SHALL BE CAPABLE OF OPENING AT <br />LEAST 90 DEGREES AND SHALL BE SO MOUNTED THAT THE CLEAR WIDTH OF THE <br />DOORWAY IS NOT LESS THAN 32". <br />9. WHERE A PAIR OF DOORS IS UTILIZED, AT LEAST ONE OF THE DOORS SHALL PROVIDE A <br />CLEAR, UNOBSTRUCTED OPENING WIDTH OF 32" WITH THE LEAF POSITIONED AT AN <br />ANGLE OF 90 DEGREES FROM ITS CLOSED POSITION. <br />10. IDENTIFY ACCESSIBLE ENTRANCES WITH AT LEAST ONE STANDARD SIGN AND WITH <br />ADDITIONAL DIRECTIONAL SIGNS, AS REQUIRED, VISIBLE FROM APPROACHING <br />PEDESTRIAN WAYS. <br />11. THE FLOOR OR LANDING ON EACH SIDE OF AN ENTRANCE OR PASSAGE DOOR SHALL BE <br />LEVEL AND CLEAR. THE LEVEL AND CLEAR AREA SHALL HAVE A LENGTH IN THE <br />DIRECTION OF DOOR SWING OF AT LEAST 60" AND THE LENGTH OPPOSITE THE <br />DIRECTION OF DOOR SWING OF 44" AS MEASURED AT RIGHT ANGLES TO THE PLANE OF <br />THE DOOR IN ITS CLOSED POSITION. (REFER TO DWG. 2/A00.40 FOR CLEARANCES BASED <br />ON DIFFERENT APPROACHES) <br />12. FLOORS OR LANDINGS SHALL BE NOT MORE THAN 1/2" LOWER THAN THE THRESHOLD OF <br />THE DOORWAY. CHANGE IN LEVEL BETWEEN 1/4" AND 1/2" SHALL BE BEVELED WITH A <br />SLOPE NO GREATER THAN 1:2. <br />13. TO ALERT THE VISUALLY IMPAIRED, MARK THE UPPER APPROACH AND THE LOWER TREAD <br />OF EACH INTERIOR STAIR WITH A STRIP OF CLEARLY CONTRASTING COLOR AT LEAST 2" <br />WIDE, PLACED PARALLEL TO AND NOT MORE THAN 1" FROM THE NOSE OF THE STEP OR <br />LANDING. THE STRIP SHALL BE OF A MATERIAL THAT IS AT LEAST AS SLIP RESISTANT AS <br />THE OTHER TREADS OF THE STAIR. <br />14. CENTER ELECTRICAL RECEPTACLE OUTLETS NOT LESS THAN 15" ABOVE THE FLOOR OR <br />WORKING PLATFORM. <br />15. ENTRY TO SANITARY FACILITIES: <br />A. 44" CLEAR AISLES OR CORRIDORS WHERE OCCUPANT LOAD IS 10 OR MORE. <br />B. DOORWAYS TO HAVE A 32" CLEAR OPENING. <br />C. ON APPROACH SIDE, PROVIDE A 60" CLEAR LEVEL SPACE WHEN DOOR SWINGS <br />TOWARD APPROACH AND 44" SPACE WHEN DOOR SWINGS AWAY FROM APPROACH. <br />(REFER TO DWG 2/A00.40 FOR CLEARANCES BASED ON DIFFERENT APPROACHES) <br />16. TOILET ROOM ACCESSORIES <br />A. MOUNT BOTTOM EDGE OF MIRROR'S REFLECTING SURFACE NO HIGHER THAN 40" FROM <br />THE FLOOR. <br />B. MOUNT TOILET TISSUE DISPENSERS WITHIN 7"-9" FROM THE FRONT EDGE OF THE <br />TOILET SEAT. <br />C. MOUNT DISPENSING AND DISPOSAL FIXTURES (TOWEL, SANITARY NAPKINS, WASTE, <br />COIN SLOTS, ETC.) WITH OPERATING PARTS NO HIGHER THAN 40" FROM THE FLOOR. <br />17. SINGLE ACCOMMODATION TOILET FACILITY SEE 5/A00.41 FOR CLEARANCE REQUIREMENTS <br />18. THE HEIGHT OF THE WATER CLOSET (TOP OF SEAT) SHALL BE BETWEEN 17" AND 19". <br />19. MOUNT FLUSH VALVE CONTROL NO MORE THAN 44" ABOVE THE FLOOR, ON THE SIDE OF <br />THE TOILET WITH THE GREATEST SEPARATION FROM ADJACENT WALL OR OTHER <br />SURFACE. <br />20. PROVIDE GRAB BARS ON EACH SIDE, OR ONE SIDE AND BACK OF WATER CLOSET. <br />A. GRAB BARS TO BE 33" ABOVE AND PARALLEL TO THE FLOOR. <br />B. SIDE BARS TO BE 42" LONG AND PROJECT 24" IN FRONT OF WATER CLOSET STOOL. <br />GRAB BAR AT BACK TO BE 36" LONG. <br />C. DIAMETER OF GRAB BARS TO BE 1-1/4" TO 1-1/21' <br />. <br />D. PROVIDE 1-1/2" CLEARANCE BETWEEN GRAB BARS AND WALL. <br />E. GRAB BARS (INCLUDING CONNECTORS, FASTENERS, SUPPORT BACKING, ETC.) SHALL <br />SUPPORT A 250 POUND LOAD. <br />F. GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS. <br />G. GRAB BARS AND ANY ADJACENT SURFACE SHALL BE FREE OF SHARP OR ABRASIVE <br />ELEMENTS. <br />H. EDGES SHALL HAVE A MINIMUM RADIUS OF 1/8 <br />21. PROVIDE A CLEAR FLOOR SPACE 30" X 48" IN FRONT OF LAVATORY TO PERMIT A FORWARD <br />APPROACH. <br />22. MOUNT LAVATORIES WITH A MINIMUM CLEARANCE OF 29" FROM THE FLOOR TO THE <br />BOTTOM OF THE APRON. PROVIDE KNEE CLEARANCE UNDER THE FRONT UP EXTENDING A <br />MINIMUM OF 30" IN WIDTH WITH 8" MINIMUM WIDTH, AND SHALL BE A MINIMUM OF 9" <br />HIGH FROM THE FLOOR A MINIMUM OF 17" DEEP FROM THE FRONT OF THE LAVATORY. <br />23. FAUCET CONTROLS AND OPERATING MECHANISMS SHALL BE OPERABLE WITH ONE HAND <br />AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING OR TWISTING OF THE WRIST. THE <br />FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5 POUNDS. LEVER <br />OPERATED, PUSH TYPE AND ELECTRONICALLY CONTROLLED MECHANISMS ARE EXAMPLES <br />OF ACCEPTABLE DESIGNS. IF SELF CLOSING VALVES ARE USED, FAUCET REMAINS OPEN A <br />MINIMUM OF 10 SECONDS. <br />24. INSULATE OR OTHERWISE COVER HOT WATER AND DRAIN PIPES UNDER LAVATORIES. <br />25. THE AMERICANS WITH DISABILITIES ACT (A.D.A.) PROVIDES THAT ALTERATIONS TO A <br />FACILITY MUST BE MADE IN SUCH A MANNER THAT, TO THE MAXIMUM EXTENT FEASIBLE, <br />THE ALTERED PORTIONS OF THE FACILITY ARE READILY ACCESSIBLE TO INDIVIDUALS <br />WITH DISABILITIES. BANK AND GENERAL CONTRACTOR ACKNOWLEDGES THAT THE <br />REQUIREMENTS OF A.D.A. WILL BE SUBJECT TO VARIOUS AND POSSIBLY CONTRADICTORY <br />INTERPRETATIONS. THE ARCHITECT THEREFORE, WILL USE ITS BEST PROFESSIONAL <br />EFFORTS TO INTERPRET A.D.A. REQUIREMENTS AND OTHER FEDERAL, STATE AND LOCAL <br />LAWS, RULES, CODES, ORDINANCES AND REGULATIONS AS THEY APPLY TO THE PROJECT. <br />THE ARCHITECT, HOWEVER, CANNOT AND DOES NOT WARRANT OR GUARANTEE THAT BANK <br />OF AMERICA WILL COMPLY WITH ALL INTERPRETATIONS OF THE A.D.A. REQUIREMENTS <br />AND/ OR THE OTHER FEDERAL, STATE AND LOCAL LAWS, RULES, CODES, ORDINANCES AND <br />REGULATIONS AS THEY APPLY TO THE PROJECT. <br />26. THE SCOPE OF WORK INDICATED ON THESE DRAWINGS IS FOR SPECIFIC ITEMS SELECTED <br />BY BANK OF AMERICA FOR CUSTOMER ACCESS TO GOODS AND SERVICES; NOTE THAT SOME <br />AREAS OF ACCESS HAVE NOT BEEN MODIFIED TO MEET A.D.A. REQUIREMENTS. ALL OTHER <br />AREAS OF A.D.A. UPGRADE THAT MAY BE REQUIRED AT THIS TIME ARE NOT IN THIS <br />CONTRACT AND ARE NOT INDICATED ON THESE DOCUMENTS. SEE BANK OF AMERICA FOR <br />ADDITIONAL INFORMATION CONCERNING OTHER AREAS OF A.D.A. SCOPE OF WORK. <br />1. ALL WORK SHALL CONFORM TO THE AMERICAN WITH DISABILITIES ACT (A.D.A.) ALONG <br />WITH ALL STATE, COUNTY, AND LOCAL APPLICABLE CODES, ORDERS, ORDINANCES AND <br />REGULATIONS. NOTIFY ARCHITECT PRIOR TO START OF WORK OF ANY DISCREPANCIES <br />BETWEEN THE DRAWINGS AND CODE. ALL WORK SHALL CONFORM TO THE MOST <br />RESTRICTIVE REQUIREMENT. <br />2. BEFORE COMMENCING WORK, CONTRACTOR SHALL BECOME FAMILIAR WITH DRAWINGS <br />SCOPE OF WORK AND VERIFY EXISTING CONDITIONS AND DIMENSIONS AT THE SITE AND <br />NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. <br />3. PRIOR TO STARTING WORK, THE GENERAL CONTRACTOR SHALL SUBMIT TO BANK OF <br />AMERICA PROJECT MANAGER AND ARCHITECT AN ITEMIZED COST BREAKDOWN OF ALL <br />SCOPE ITEMS AND A CONSTRUCTION SCHEDULE. WORK TO BE SCHEDULED TO MEET BANK <br />OF AMERICA REQUIREMENTS. <br />4. ALL WORK DESCRIBED OR INDICATED IN THESE DOCUMENTS AND ALL WORK DEPENDENT <br />UPON OR NECESSARY TO COMPLETE THIS WORK SHALL BE EXECUTED IN A WORKMAN LIKE <br />MANNER CONSISTENT WITH THE BEST STANDARDS OF THE TRADE INVOLVED AND BE OF <br />ITEMS AND MATERIALS SUITED FOR THE PURPOSE INTENDED. <br />5. TRADESMEN, CRAFTSMEN, INSTALLERS, FOREMEN, AND SUPERVISORS ARE TO BE SKILLED, <br />EXPERIENCED AND LICENSED IF REQUIRED IN THE WORK THEY WILL BE PERFORMING. <br />6. PROJECT CONSTRUCTION ITEMS TO BE NEW, UNLESS OTHERWISE NOTED. NO <br />SUBSTITUTIONS WILL BE ALLOWED UNLESS COMPLETE DESCRIPTIONS OF ITEMS INCLUDING <br />DRAWINGS, TEST DATA, SAMPLES, COST AND SCHEDULE CHANGES ARE SUBMITTED BY THE <br />CONTRACTOR AND APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION. ANY ITEM <br />NOTED ON THE DRAWINGS THAT ARE NOT AVAILABLE OR WOULD CAUSE A TIME DELAY <br />SHALL BE IDENTIFIED BY THE GENERAL CONTRACTOR AND THE ARCHITECT NOTIFIED. <br />7, TYPICAL DETAILS AND GENERAL NOTES SHALL BE USED WHENEVER APPLICABLE U.N.O. ALL <br />SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED CONSTRUCTION <br />STANDARDS, IF CONTRACTOR HAS ANY QUESTIONS REGARDING THE SAME OR EXACT <br />MEANING, ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION. <br />8. DIMENSION LINES ARE TO FACE OF FINISH ON EXISTING AND NEW WORK, UNLESS NOTED AS <br />FACE OF STUD OR MASONRY OR CENTERLINE OR OTHERWISE. DIMENSIONS SHALL HAVE <br />PRECEDENCE OVER SCALE AND LARGER SCALE DRAWINGS SHALL HAVE PRECEDENCE OVER <br />SMALLER SCALE DRAWINGS. <br />9. PROVIDE SHOP DRAWINGS WHERE INDICATED AND FOR ALL METAL FABRICATION OR WHERE <br />THEY ARE CALLED OUT FOR ON THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL <br />SUBMIT FIVE (5) SETS TO THE ARCHITECT WITH AMPLE TIME TO REVIEW. REQUIRED <br />CORRECTIONS WILL BE NOTED AND A COPY WILL BE RETURNED TO THE CONTRACTOR WHO <br />SHALL REVISE DRAWINGS AND RESUBMIT FOR FINAL APPROVAL PRIOR TO FABRICATION. <br />10. CONTRACTOR TO SUBMIT SAMPLES OF ALL FINISH MATERIALS TO ARCHITECT FOR APPROVAL <br />PRIOR TO INSTALLATION. <br />11. CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF AS -BUILT DRAWINGS NOTING <br />DEVIATIONS BETWEEN THESE DRAWINGS AND ACTUAL FIELD CONDITIONS AND NEW <br />CONSTRUCTION OF ALL TRADES AND DELIVER TO BANK OF AMERICA AT END OF PROJECT. <br />GENERAL CONTRACTOR SHALL PROVIDE ALL SUBCONTRACTORS WITH THE MOST CURRENT <br />CONSTRUCTION DOCUMENTS THROUGHOUT THE PROJECT, INCLUDING ALL REVISIONS. <br />12. CONTRACTOR TO NOTIFY ARCHITECT AND BANK OF AMERICA PROJECT MANAGER OF ALL <br />REVISIONS TO THE DRAWINGS AND CHANGES WITH THE SCOPE OF WORK OR SCHEDULE <br />REQUIRED BY GOVERNING AGENCIES, FIELD CONDITIONS OR BANK OF AMERICA PERSONNEL <br />REGARDLESS OF EXTENT, ALL REVISIONS TO BE IN WRITING AS CHANGE ORDERS AND <br />APPROVED PRIOR TO STARTING WORK. <br />13. CONTRACTOR TO PROVIDE EQUIPMENT TO ENSURE LIFE SAFETY OF PUBLIC, TENANTS AND <br />WORKERS AS REQUIRED BY FEDERAL, STATE AND LOCAL CODES THROUGHOUT <br />CONSTRUCTION. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT <br />PEDESTRIANS. <br />14. CONTRACTOR TO VERIFY EXISTING STRUCTURAL CONDITIONS AND REQUIREMENTS OF NEW <br />CONSTRUCTION PRIOR TO START OF WORK. CONTRACTOR SHALL FURNISH ADEQUATE <br />SHORING, BRACING, ETC., AS REQUIRED TO SAFELY EXECUTE ALL WORK AND SHALL BE FULLY <br />RESPONSIBLE FOR SAME, UNLESS SPECIFICALLY DETAILED IN THE DRAWINGS. CONTRACTOR <br />SHALL PROVIDE BLOCKING, BACKING, FRAMING, HANGERS, OR OTHER SUPPORTS AS <br />NECESSARY FOR ALL FIXTURES, EQUIPMENTS AND ALL OTHER ITEMS REQUIRING SAME. <br />FIRE DEPARTMENT NOTES <br />1. PROVIDE EXIT SIGN WITH 6" LETTERS OVER REQUIRED EXITS, WHERE SHOWN ON <br />DRAWINGS, AND ADDITIONAL SIGNS AS REQUIRED BY BUILDING DEPARTMENT <br />INSPECTOR OR FIRE DEPARTMENT FIELD INSPECTOR. CONNECT EXIT SIGNS TO <br />EMERGENCY POWER CIRCUITS. COMPLY WITH BUILDING CODES. <br />2. MAINTAIN AISLES AT LEAST 44" WIDE AT PUBLIC AREAS. <br />3, EVERY EXIT DOOR SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY <br />OR ANY SPECIAL KNOWLEDGE OR EFFORT, SPECIAL LOCKING DEVICES SHALL BE OF AN <br />APPROVED TYPE. ALL NEW DOORS SHALL HAVE APPROVED LEVER HANDLES. <br />4. DOORS OPENING INTO REQUIRED 1-HOUR, FIRE -RESISTIVE CORRIDORS SHALL BE <br />PROTECTED WITH A SMOKE OR DRAFT STOP ASSEMBLY HAVING A 20-MINUTE RATING <br />AND SHALL BE SELF -CLOSING. <br />5. 20-MINUTE DOOR JAMBS TO BE TIGHT -FITTING, SMOKE AND DRAFT CONTROLLED. <br />6. EXIT DOORS SHALL SWING IN THE DIRECTION OF TRAVEL WHEN SERVING 50 OR MORE <br />PERSONS AND IN ANY HAZARDOUS AREA. <br />7. INTERIOR WALL AND CEILING FINISHES FOR EXIT CORRIDOR SHALL NOT EXCEED AN END <br />POINT FLAME SPREAD RATING: <br />A. CLASS I, FLAME SPREAD 0-25, SMOKE DENSITY 150, FOR MATERIALS INSTALLED IN <br />VERTICAL EXITS. <br />B. CLASS II, FLAME SPREAD 26-75, SMOKE DENSITY 300, FOR MATERIALS INSTALLED IN <br />HORIZONTAL EXITS. <br />C. CLASS III, FLAME SPREAD 76-200, SMOKE DENSITY 450, FOR MATERIALS INSTALLED <br />IN ANY OTHER LOCATION. <br />15. SITE AND BUILDING SHALL BE MAINTAINED IN A CLEAN, SAFE MANNER. DIRTY/ NOISY <br />WORK SHALL BE PERFORMED AT SUCH TIME AS DIRECTED PER THE OWNER AND/OR CITY <br />WHEN THE WORK OF VARIOUS SECTIONS ARE COMPLETED, AND AT OTHER TIMES AS <br />DIRECTED BY BANK OF AMERICA, OR OWNER, ALL TRASH. DEBRIS, SURPLUS MATERIAL, <br />TOOLS AND EQUIPMENT ARE TO BE REMOVED FROM THE SITE AND DISPOSED OF IN A LEGAL <br />MANNER. LEAVE PREMISES IN A CONDITION ACCEPTABLE TO BANK OF AMERICA, OR OWNER. <br />16. PROTECT AREA OF WORK AND ADJACENT AREAS FROM DAMAGE. WHERE EXISTING <br />CONSTRUCTION, FINISHES OR EQUIPMENT IS DAMAGED BY WORK IN THIS CONTRACT, <br />THEY SHALL BE PATCHED, REPAIRED OR REPLACED AS REQUIRED TO MATCH EXISTING, BY <br />TRADE WHOSE WORK IS DAMAGED AT NO COST TO BANK OF AMERICA. <br />17. LAYOUT OF WORK: <br />A. LOCATION AND ELEVATION OF ALL WORK TO BE CONSTRUCTED ARE SHOWN ON <br />DRAWINGS AND UNLESS DISCREPANCIES ARE BROUGHT TO THE ATTENTION OF THE <br />ARCHITECT PRIOR TO CONSTRUCTION, THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR <br />THE PROPER LOCATION AND ELEVATIONS AS SHOWN AND INTENDED. <br />B. THE CONTRACTOR SHALL LAYOUT THE WORK AND SHALL ESTABLISH AND MAINTAIN <br />NECESSARY MARKERS, AND SHALL BE RESPONSIBLE FOR THE ACCURACY OF SAME. THE <br />CONTRACTOR SHALL LAYOUT, AS A GUIDE TO ALL TRADES AND TO HIS SUBCONTRACTORS, <br />THE EXACT LOCATIONS OF NEW OR REMODEL WORK WITH RESPECT TO CHANGES TO <br />EXISTING. <br />18. INSTALL AND APPLY ITEMS, MATERIALS, EQUIPMENT, FINISHES, ETC. INCLUDING THE <br />PREPARATION OF SURFACES IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED <br />RECOMMENDATIONS AND INSTALLATION REQUIREMENTS. <br />19. PERTAINING TO EQUIPMENT: GENERAL CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL <br />AND RELOCATION OF ANY EXISTING EQUIPMENT OR CONSTRUCTION AS NECESSARY FOR A <br />COMPLETE INSTALLATION. <br />20. ACCESS PANELS SHALL BE PROVIDED FOR ALL EQUIPMENT SWITCHES, VALVES AND OTHER <br />CONTROL DEVICES THAT ARE CONCEALED. EXACT LOCATIONS TO BE APPROVED BY <br />ARCHITECT PRIOR TO INSTALLATION. <br />21. BESIDES GUARANTEES REQUIRED ELSEWHERE, THE CONTRACTOR, HEREBY DOES, <br />GUARANTEE ALL WORK FOR A MINIMUM PERIOD OF ONE YEAR AFTER DATE OF ACCEPTANCE <br />OF WORK WITH ANY OTHER WORK, WHICH MAY BE DISPLACED IN SO DOING, THAT MAY <br />PROVE DEFECTIVE IN WORKMANSHIP AND/OR MATERIALS WITHIN A MINIMUM OF ONE <br />YEAR PERIOD FROM THE DATE OF ACCEPTANCE WITHOUT EXPENSE TO BANK OF AMERICA. <br />22.OBTAIN AND PAY FOR PERMITS AND INSPECTIONS REQUIRED BY PUBLIC AUTHORITIES <br />GOVERNING THE WORK. <br />23. SUBMIT REQUESTS FOR SUBSTITUTIONS, REVISIONS, OR CHANGES TO ARCHITECT FOR <br />REVIEW PRIOR TO PURCHASE, FABRICATION OR INSTALLATION. <br />24. OWNER WILL PROVIDE WORK NOTED "BY OTHERS" OR "NIC" UNDER SEPARATE CONTRACT. <br />INCLUDE SCHEDULE REQUIREMENTS IN CONSTRUCTION PROGRESS SCHEDULE AND <br />COORDINATE TO ASSURE ORDERLY SEQUENCE OF INSTALLATION. <br />25. COORDINATE TELECOMMUNICATIONS, DATA AND SECURITY SYSTEM INSTALLATIONS. <br />26. PROTECT AREA OF WORK AND ADJACENT AREAS FROM DAMAGE. <br />27. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. IN CASE OF CONFLICT, <br />CONSULT THE ARCHITECT. <br />28. COORDINATE AND PROVIDE BLOCKING FOR MILLWORK AND ITEMS ATTACHED OR <br />MOUNTED TO WALLS OR CEILINGS. <br />29. UNDERCUT DOORS TO CLEAR TOP OF FLOOR FINISHES BY 1/4 INCH, UNLESS OTHERWISE <br />NOTED. <br />30, CONCEALED INSULATING MATERIALS INSTALLED WITHIN WALL SHALL HAVE A FLAME <br />SPREAD INDEX OF NOT MORE THAN 75 AND A SMOKE -DEVELOPED INDEX OF NOT MORE <br />THAN 450. <br />31, INSULATING MATERIALS WHICH ARE SUBJECT TO DIRECT EXPOSURE TO POTENTIAL FIRE <br />ON THE INSIDE OF THE BUILDING DUE TO INSTALLATION IN UNCONCEALED SPACES SHALL <br />HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE -DEVELOPED INDEX OF <br />NOT MORE THAN 450. <br />32. MATERIALS EXPOSED WITHIN PLENUMS ARE REQUIRED TO BE NONCOMBUSTIBLE OR SHALL <br />HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE -DEVELOPED INDEX OF <br />NOT MORE THAN 50 AS DETERMINED IN ACCORDANCE WITH ASTM E 84. <br />8. PROVIDE FIRE DAMPERS OR DOORS WHERE AIR DUCTS PENETRATE FIRE -RATED WALLS <br />OR CEILINGS. <br />9. WOOD BLOCKING SHALL BE FIRE TREATED IN ACCORDANCE WITH APPLICABLE CODE <br />REQUIREMENTS. <br />10. HEARING IMPAIRED. FLASHING VISUAL WARNING SHALL HAVE A FREQUENCY OF NOT <br />MORE THAN 60 FLASHES PER MINUTE AND SHALL BE SYNCHRONIZED. <br />11. LOCATE THE CENTER OF FIRE ALARM INITIATING DEVICES 48" ABOVE THE LEVEL OF THE <br />FINISHED FLOOR, WORKING PLATFORM, GROUND SURFACE OR SIDEWALK. <br />12. CONTRACTOR SHALL PERMANENTLY IDENTIFY ALL PROTECTED OPENINGS, CORRIDOR <br />PARTITIONS, SMOKE STOP PARTITIONS, HORIZONTAL EXIT PARTITIONS, EXIT <br />ENCLOSURES AND ALL FIRE RATED WALLS WITH CORRESPONDING HOURLY RATING BY <br />EITHER INSTALLING SIGNS OR BY STENCILING IN CONCEALED SPACES THE FOLLOWING: <br />"1 HOUR FIRE AND SMOKE BARRIER - PROTECT ALL OPENINGS". NOTE: IDENTIFICATION <br />SHALL BE SPACED NO MORE THAN TWELVE (12) FEET ON CENTER WITH A MINIMUM <br />LETTER SIZE OF TWO (2) INCHES IN HEIGHT ON A CONTRASTING BACKGROUND. <br />13. DEVICE COVERS TO BE TO MATCH LUTRON LIGHT ALMOND UNLESS DICTATED <br />OTHERWISE BY LOCAL JURISDICTIONS. <br />Bank of America <br />ADA- ZEPHYRHILLS <br />5632 GALL BOULEVARD <br />ZEPHYRHILLS, FL 33542 <br />SERIAL NUM./MANH. ID: FL2-019 <br />� 'I <br />Nelco Architecture, Inc. <br />a licensed affiliate <br />Florida Certificate of Authorization Number: AA26000525 <br />Architect: Client Representative: <br />Firm Name: NELSON Firm Name: JLL <br />Attn: Mark Schroeder Attn: Lisa Drees <br />T: 404.881.1811 T: 813.624.4512 <br />e-mail: mschroeder@nelsononline.com e-mail: lisa.drees@am.jll.com <br />Engineering: <br />Infinity Engineering Group, LLC <br />Attn: Nisit Sapparkhao <br />T: 813.830.2330 <br />e-mail: nisit@iegroup.net <br />General Contractor: <br />Firm Name: Spartan Contracting Corporation <br />Attn: Scott Kramer <br />T: 813.481.5778 <br />e-mail: skramer@spartancc.com <br />Issue Date & Issue Description By Check <br />1 03/23/18 Issue For Review AJB AFO-- <br />2 04/23/18 Issue For CD Review KS AFO/MS <br />3 04/27/18 Issue For Permit KS MS <br />Seal/Signature <br />Architect of Record, Mark Schroeder <br />Lic. # : AR0016438 <br />Project Name <br />Bank of America <br />Zephyrhills <br />IProject Type <br />ADA Upgrade <br />NELSON <br />1� 8 003 <br />Number <br />IDescription <br />GENERAL NOTES <br />IScale & Sheet Number <br />A00olO <br />