1. THE HVAC UNITS ALONG WITH THE HOOD FANS (EXHAUST & MAKE-UP) SHALL
<br />BE SUPPLIED BY THE OWNER AND INSTALLED BY THE MECHANICAL
<br />CONTRACTOR. ALL THERMOSTATS, DUCTS, FITTINGS, LABOR, & OTHER
<br />MATERIALS SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL
<br />CONTRACTOR, AS REQUIRED IN ORDER TO ACHIEVE COMPLETE, CODE
<br />COMPLIANT, & OPERABLE HVAC SYSTEMS AS INDICATED IN THE PROJECT
<br />DOCUMENTS.
<br />2. CONTRACTORS AND SUB -CONTRACTORS SHALL CAREFULLY REVIEW THE
<br />COMPLETE CONSTRUCTION DOCUMENT PACKAGE. INFORMATION
<br />REGARDING THE SCOPE OF THE REQUIRED WORK IS DISPERSED
<br />THROUGHOUT THE PROJECT DOCUMENT SET, AND CANNOT BE ACCURATELY
<br />DEFINED WITHOUT REFERENCE TO THE COMPLETE PROJECT DOCUMENT
<br />SET.
<br />3. COORDINATE WITH THE WORK OF OTHER SECTIONS, EQUIPMENT FURNISHED
<br />BY OTHERS, REQUIREMENTS OF THE OWNER, AND WITH THE CONSTRAINTS
<br />OF THE EXISTING CONDITIONS OF THE PROJECT SITE. AFTER CAREFUL
<br />REVIEW OF THE PROJECT DOCUMENTS & THEIR REQUIREMENTS, NOTIFY THE
<br />ARCHITECT (IN WRITING) OF ANY DISCREPANCIES PRIOR TO COMMENCING
<br />WORK.
<br />4, THE DRAWINGS FOR THE HVAC WORK ARE DIAGRAMMATIC, SHOWING THE
<br />GENERAL LOCATION, TYPE, LAYOUT, AND EQUIPMENT REQUIRED. THE
<br />DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENT. REFER TO
<br />THE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS. REFER TO THE
<br />MANUFACTURER'S INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS
<br />AND OTHER INSTALLATION REQUIREMENTS. SUBMIT SHOP DRAWINGS FOR
<br />APPROVAL, PER THE SPECIFICATION REQUIREMENTS.
<br />5. ALL WORK SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE, & NATIONAL
<br />CODES, AS WELL AS INDUSTRY STANDARDS. ALL REQUIRED
<br />CONSTRUCTION/INSTALLATION PERMITS SHALL BE PURCHASED AS NEEDED.
<br />LIKEWISE, ALL REQUIRED SITE INSPECTIONS SHALL BE SCHEDULED,
<br />PERFORMED, & ALL PERTINENT GOVERNMENTAL APPROVALS/CERTIFICATES
<br />OBTAINED & PRESENTED TO THE OWNER PRIOR TO ACHIEVING SUBSTANTIAL
<br />COMPLETION.
<br />9. WHEN HVAC AIR FLOW IS OVER 2000 CFM PROVIDE SMOKE DUCT DETECTORS
<br />IN SUPPLY AND RETURN DUCTS OR AS REQUIRED BY APPLICABLE CODES.
<br />DUCT SMOKE DETECTOR SHALL BE SIMPLEX PHOTOELECTRIC SMOKE
<br />DETECTOR #2098-9201, SIMPLEX DUCT DETECTOR HOUSING #2098-9649,
<br />SIMPLEX BAFFLE #2098-9811, AND SIMPLEX SAMPLING TUBE #2098-9797.
<br />HVAC SHUT DOWN RELAY SHALL BE SIMPLEX #2088-9010. FIRE ALARM
<br />CONTROL PANEL SHALL BE SIMPLEX #4004-9101 WITH (2) SIMPLEX 6.2 AH
<br />BATTERIES #2081-9272. SYSTEM SHALL SHUT DOWN UNITS UPON
<br />ACTIVATION OF DUCT SMOKE DETECTOR WHICH WILL SOUND ALARM BELL
<br />AND ACTIVATE LIGHT LOCATED IN SIMPLEX FIRE ALARM CONTROL PANEL.
<br />FIRE ALARM CONTROL PANEL IS ONLY FOR MONITORING ACTIVATION OF OR
<br />TROUBLE WITH DUCT SMOKE DETECTORS. MECHANICAL CONTRACTOR
<br />SHALL PROVIDE AND INSTALL DEVICES TO COMPLY WITH N.F.P.A. 90A 4-4.
<br />ELECTRICAL CONTRACTOR SHALL WIRE PANEL AND SMOKE DETECTORS.
<br />10. CAREFULLY REVIEW THE SPECIFICATIONS FOR ADDITIONAL PROJECT
<br />REQUIREMENTS NOT SHOWN ON THE DRAWINGS.
<br />11. ALL INDICATED DUCT SIZES ARE "CLEAR INSIDE" DIMENSIONS.
<br />12. TESTING AND BALANCING:
<br />ALL HVAC SYSTEMS INSTALLED DURING THIS PROJECT ARE REQUIRED TO
<br />BE PROPERLY BALANCED BY AN -INDEPENDENT, 'THIRD PARTY" AIR
<br />BALANCING AGENCY. THE "T&B" CONTRACTOR MUST BE AABC &/OR
<br />NEBB CERTIFIED TO BE CONSIDERED FOR THIS PROJECT. AFTER
<br />RECEIPT OF THE OWNER'S APPROVAL, THE MECHANICAL CONTRACTOR
<br />SHALL ENGAGE THE APPROVED "T&B" (TESTING & BALANCING)
<br />CONTRACTOR.
<br />ALL OF THE SUBSEQUENT T&B REPORTS SHALL BE DISTRIBUTED
<br />DIRECTLY TO THE OWNER, & SHALL NOT BE ROUTED THROUGH THE
<br />MECHANICAL CONTRACTOR. IF THE MECHANICAL CONTRACTOR SHOULD
<br />DESIRE TO PERFORM THE "T&B" SERVICES HIMSELF, THE FOLLOWING
<br />PROCESSES SHALL APPLY - AABC &/OR NEBB CERTIFICATION IS
<br />REQUIRED, & THOROUGH DOCUMENTATION OF PREVIOUS PROJECTS'
<br />"T&B" GENERATED BY THE MECHANICAL CONTRACTOR, INCLUDING COPIES
<br />OF THE ISSUED REPORTS, SHALL BE PRESENTED TO THE OWNER FOR
<br />HIS REVIEW DURING THE REVIEW/APPROVAL PROCESS. IF THE
<br />MECHANICAL CONTRACTOR DOES NOT PROVIDE THE NECESSARY
<br />DOCUMENTATION, OR IF THE PRESENTED DOCUMENTATION DOES NOT
<br />SATISFY THE OWNER, THE "THIRD PARTY" T&B AGENCY WILL BE
<br />REQUIRED.
<br />ANY "T&B" DOCUMENTATION REQUIRED FOR A CERTIFICATE OF
<br />OCCUPANCY SHALL BE PROVIDED AS PART OF THE BASE SCOPE OF
<br />WORK; NO ADDITIONAL SERVICE FEES &/OR COSTS WILL BE
<br />ENTERTAINED REGARDING THIS ITEM. AGAIN, ANY & ALL "T&B"
<br />DOCUMENTATION SHALL BE DISTRIBUTED TO THE OWNER FIRST, & THEN
<br />AFTER OWNER APPROVAL, FURTHER DISSEMINATION OF THE SUBJECT
<br />DOCUMENTATION CAN OCCUR.
<br />REQUIRED MEASURING TECHNIQUES:
<br />• ALL DIFFUSERS, REGISTERS, &/OR GRILLES SHALL BE MEASURED
<br />BY UTILIZING A HOOD AXIAL VANE VELOMETER;
<br />• TOTAL FLOW OF SUPPLY, EXHAUST, MAKE-UP, & RETURN AIR
<br />SYSTEMS SHALL BE DETERMINED BY PITOT TUBE TRAVERSES;
<br />• UTILIZE THE INSTALLED VOLUME DAMPERS TO BALANCE ALL
<br />DEVICES PER THE PROJECT DOCUMENTS' REQUIRED AIR QUANTITIES; &
<br />• HOOD EXHAUST SYSTEMS SHALL NOT BE ACCEPTED, IF THE
<br />SYSTEM IS 1 CFM BELOW THE INDICATED EXHAUST AIR QUANTITY.
<br />LIKEWISE, THE HOOD EXHAUST SYSTEMS SHALL NOT BE ACCEPTED, IF
<br />THE SYSTEM IS MORE THAN 3% IN EXCESS OF THE INDICATED
<br />EXHAUST AIR QUANTITIES.
<br />O1 PROVIDE EXTERNALLY INSULATED 14"X12" MAKEUP AIR DUCT FROM SF-1 LOCATED 8 PROVIDE NEW THERMOSTAT MOUNTED AT 48" AFF. REFER TO SHEET M5, HVAC
<br />ON ROOF TO KITCHEN HOOD MAKEUP AIR CONNECTIONS. PROVIDE TRANSITIONS SPECIFICATIONS FOR THERMOSTAT REQUIREMENTS.
<br />AS REQUIRED.
<br />OROOF MOUNTED MAKEUP AIR UNIT AND ASSOCIATED CURB FURNISHED BY
<br />OWNER AND INSTALLED BY MECHANICAL CONTRACTOR. FIELD VERIFY MOUNTING
<br />LOCATION. REFER TO SHEET M6 FOR ADDITIONAL INFORMATION.
<br />OTYPE I EXHAUST HOOD AT PIZZA OVENS FURNISHED BY OWNER AND INSTALLED BY
<br />MECHANICAL CONTRACTOR. REFER TO SHEET M6 FOR ADDITIONAL
<br />INFORMATION.
<br />O4 CONNECT A WELDED STEEL GREASE DUCT TO EF-1 AT THE ROOF/CURB COLLAR,
<br />& TRANSITION AS REQUIRED TO AN 9"x9" WELDED STEEL GREASE DUCT FOR
<br />EXTENSION/CONNECTION TO THE TYPE I PIZZA OVEN EXHAUST HOOD AS SHOWN.
<br />THE DUCT SHALL BE WRAPPED (IN ACCORDANCE WITH THE MANUFACTURER'S
<br />INSTRUCTIONS) WITH 1-1/2" THICK FIREMASTER DUCT WRAP, AS MANUFACTURED
<br />BY 3M CO. (OR OTHER APPROVED EQUAL) AS REQUIRED; IN ORDER TO ACHIEVE
<br />COMPLIANCE WITH THE CODE REQUIRED GREASE DUCT ENCLOSURE. WRAP
<br />SHALL EXTEND FROM THE DUCT CONNECTION AT THE HOOD TO THE DUCT
<br />PENETRATION/CONNECTION AT THE ROOF/CURB COLLAR, COMPLETE
<br />THROUGHOUT THE ENTIRE LENGTH. IF DUCT ACCESS DOORS ARE REQUIRED, THE
<br />FIRE PROTECTIVE WRAP MUST BE INSTALLED/MODIFIED, PER THE
<br />MANUFACTURER'S INSTRUCTIONS. THE "OWNER SUPPLIED" ROOF CURB SHALL BE
<br />A MINIMUM OF 24" IN HEIGHT, WHEN UTILIZING THE SPECIFIED, "OWNER SUPPLIED"
<br />EXHAUST FAN. THE OWNER SHALL PROVIDE THE HOOD & ITS ASSOCIATED FAN
<br />(WITH CURB). THE MECHANICAL CONTRACTOR SHALL INSTALL THE EQUIPMENT,
<br />AS SHOWN, PROVIDING THE CONNECTING DUCTWORK, WRAP, SUPPORTS, &
<br />OTHER APPURTENANCES AS REQUIRED FOR A COMPLETE & OPERABLE SYSTEM.
<br />OTYPE I EXHAUST HOOD AT FRYERS FURNISHED BY OWNER AND INSTALLED BY
<br />MECHANICAL CONTRACTOR. REFER TO SHEET M7 FOR ADDITIONAL
<br />INFORMATION.
<br />OCONNECT A WELDED STEEL GREASE DUCT TO EF-2 AT THE ROOF/CURB COLLAR,
<br />& TRANSITION AS REQUIRED TO A 7"x7" WELDED STEEL GREASE DUCT FOR
<br />EXTENSION/CONNECTION TO THE TYPE I WINGSTREET FRYER EXHAUST HOOD AS
<br />SHOWN. THE DUCT SHALL BE WRAPPED (IN ACCORDANCE WITH THE
<br />MANUFACTURER'S INSTRUCTIONS) WITH 1-1/2" THICK FIREMASTER DUCT WRAP, AS
<br />MANUFACTURED BY 3M CO. (OR OTHER APPROVED EQUAL) AS REQUIRED, IN
<br />ORDER TO ACHIEVE COMPLIANCE WITH THE CODE REQUIRED GREASE DUCT
<br />ENCLOSURE. WRAP SHALL EXTEND FROM THE DUCT CONNECTION AT THE HOOD
<br />TO THE DUCT PENETRATION/CONNECTION AT THE ROOF/CURB COLLAR,
<br />COMPLETE THROUGHOUT THE ENTIRE LENGTH, IF DUCT ACCESS DOORS ARE
<br />REQUIRED, THE FIRE PROTECTIVE WRAP MUST BE INSTALLED/MODIFIED, PER THE
<br />MANUFACTURER'S INSTRUCTIONS. THE "OWNER SUPPLIED" ROOF CURB SHALL BE
<br />A MINIMUM OF 22 1/2" IN HEIGHT, WHEN UTILIZING THE SPECIFIED, "OWNER
<br />SUPPLIED" EXHAUST FAN. THE OWNER SHALL PROVIDE THE HOOD & ITS
<br />ASSOCIATED EXHAUST FAN (WITH CURB). THE MECHANICAL CONTRACTOR SHALL
<br />INSTALL THE EQUIPMENT, AS SHOWN, PROVIDING THE CONNECTING DUCTWORK,
<br />WRAP, SUPPORTS, & OTHER APPURTENANCES AS REQUIRED FOR A COMPLETE &
<br />OPERABLE SYSTEM.
<br />O7 INSTALL OWNER FURNISHED HOOD. PROVIDE ANSUL (OR OTHER APPROVED
<br />EQUAL) FIRE SUPPRESSION SYSTEM FOR PRE -PIPED HOOD.
<br />OROOF MOUNTED REMOTE CONDENSING UNITS FOR FREEZER/COOLER SHOWN
<br />FOR REFERENCE ONLY.
<br />10 PROVIDE CEILING MOUNTED EXHAUST FAN ABOVE RESTROOM. BALANCE FAN TO
<br />SCHEDULED CFM AND INTERLOCK OPERATION WITH RESTROOM LIGHT SWITCH.
<br />11 PROVIDE EXHAUST AIR DUCT FROM CEILING MOUNTED EXHAUST FAN. TERMINATE
<br />WITH WATER PROOF ROOF CAP WITH BIRD SCREEN. ROOF HOOD TO BE LOCATED
<br />A MINIMUM OF 10'-0" FROM ALL MECHANICAL AIR INTAKE LOCATIONS.
<br />12 PROVIDE PVC JACKET FOR REFRIGERANT LINES IN COOLER AND FREEZER.
<br />13 INSTALL HOOD MANUFACTURER FURNISHED REMOTE KITCHEN TEMPERATURE
<br />SENSOR AT CEILING.
<br />14 INSTALL NEW RTU AND ROOF CURB. COORDINATE WITH NPC CONSTRUCTION
<br />MANAGER AND STRUCTURAL DRAWINGS FOR EXACT RTU INSTALLATION
<br />LOCATION. MAINTAIN ALL MANUFACTURERS CLEARANCES FROM ADJACENT
<br />EQUIPMENT.
<br />GENERAL NOTES 1 3 1 KEY NOTES 1 2 1
<br />NOTE:
<br />FLEXIBLE DUCTWORK SHALL NOT EXCEED 5'-0" IN LENGTH AND SHALL NOT BE
<br />INSTALLED IN INACCESSIBLE AREAS. FLEXIBLE DUCT SHALL BE SUPPORTED TO
<br />AVOID SHARP BENDS AND SAGGING. ANY DUCT NOT PROPERLY INSTALLED WILL BE
<br />REPLACED AT CONTRACTORS EXPENSE.
<br />GREASE DUCT ALTERNATIVE
<br />AS AN ALTERNATIVE TO FIELD FABRICATED GREASE EXHAUST DUCT AS SPECIFIED,
<br />THE CONTRACTOR MAY FURNISH DOUBLE WALL, FACTORY BUILT GREASE DUCT FOR
<br />USE WITH TYPE I KITCHEN HOODS THAT CONFORM TO THE REQUIREMENTS OF
<br />NFPA-96. PRODUCTS SHALL BE ETL LISTED TO UL-1978 AND UL-221. DOUBLE WALL
<br />DUCTS SHALL BE LISTED FOR A CONTINUOUS INTERNAL TEMPERATURE OF 500°F AND
<br />INTERMITTENT TEMPERATURES OF 2000°F.
<br />BASIS OF DESIGN FOR FACTORY BUILT GREASE DUCT SHALL BE CAPTIVE AIRE
<br />MODELS DW-3Z, DW-3R, AND DW-2R. PRODUCTS SHALL BE SUBMITTED FOR
<br />APPROVAL BY THE ENGINEER OF RECORD IN ACCORDANCE WITH PROJECT
<br />SPECIFICATIONS AND REQUIREMENTS.
<br />FIELD VERIFICATION NOTES:
<br />1. CODE REQUIRED MINIMUM DISTANCES BETWEEN AIR INTAKE LOCATIONS, AND
<br />EXHAUST &/OR FLUE DISCHARGE LOCATIONS SHALL BE PROPERLY MAINTAINED.
<br />ALL CODE REQUIRED DIMENSIONS FOR THE VARIOUS APPURTENANCES SHALL
<br />BE REVIEWED, VERIFIED, & COORDINATED BY THE MECHANICAL CONTRACTOR.
<br />ANY DISCREPANCIES SHALL BE IDENTIFIED TO THE OWNER OR OWNER'S
<br />REPRESENTATIVE, IN WRITING, PRIOR TO THE COMMENCEMENT OF
<br />CONSTRUCTION/INSTALLATION.
<br />2. THE PROPOSED "PROJECT TEAM APPROVED" LOCATIONS OF ALL
<br />ROOF -MOUNTED EQUIPMENT SHALL BE PRESENTED TO THE OWNER/LANDLORD
<br />FOR THEIR APPROVAL (REQUIRED), PRIOR TO THE COMMENCEMENT OF
<br />CONSTRUCTION/INSTALLATION. SEE ARCHITECTURAL DRAWING FOR PROPOSED
<br />LOCATIONS. RECONCILE ANY DISCREPANCIES BEFORE PRESENTING THE
<br />PROPOSED LOCATIONS FOR APPROVAL.
<br />3. VERIFY THE AVAILABLE "ABOVE CEILING CLEAR SPACE" FOR DUCT INSTALLATION,
<br />PRIOR TO THE COMMENCEMENT OF ANY DUCT FABRICATION. ALLOW 6" ABOVE
<br />THE CEILING LINE FOR LIGHT FIXTURES. THE DUCTWORK SHALL EXTEND AS
<br />REQUIRED BELOW THE BAR JOISTS. IF ROUTING OF THE DUCT NEEDS TO BE
<br />"THROUGH" THE JOISTS IN ANY LOCATION, THIS MUST BE APPROVED BY THE
<br />OWNER, PRIOR TO INSTALLATION. LIKEWISE, IF THE DUCT DIMENSIONS ARE TO
<br />BE REVISED/MODIFIED, THE REVISIONS/MODIFICATIONS MUST BE APPROVED
<br />PRIOR TO INSTALLATION.
<br />4. VERIFY THE PROPOSED THERMOSTAT LOCATIONS WITH NPC FACILITIES/PROJECT
<br />MANAGER PRIOR TO THE INSTALLATION OF SAME.
<br />5, VERIFY AVAILABLE ELECTRICAL SYSTEM VOLTAGES, & COORDINATE WITH ALL "TO
<br />BE SUPPLIED" ELECTRICAL DEVICES/EQUIPMENT.
<br />MINIMUM OUTDOOR AIR REQUIREMENTS
<br />ROOM
<br />AREA
<br />IN SQ. FT
<br />PEOPLE
<br />PER 1000
<br />SQ. FT
<br />CFM PER
<br />PERSON
<br />CFM PER
<br />SQ. FT
<br />EXHAUST
<br />REQUIRED
<br />CFM
<br />CODE
<br />REQUIRED
<br />CFM
<br />NOTE
<br />KITCHEN AREA
<br />1025
<br />--
<br />--
<br />-
<br />718
<br />718
<br />LOBBY
<br />292
<br />30
<br />7.5
<br />0.06
<br />-
<br />66
<br />RESTROOM
<br />58
<br />--
<br />-
<br />70
<br />--
<br />TRANSFERRED FROM ADJACENT SPACE
<br />*TOTAL
<br />* PER AIR BALANCE SCHEDULE 1200 CFM OF OUTDOOR AIR TO BE SUPPLIED TO SPACE.
<br />783
<br />H.V.A.C. FLOOR PLAN 1 1/4" = V-0"
<br />1
<br />
|