Laserfiche WebLink
1. THE HVAC UNITS ALONG WITH THE HOOD FANS (EXHAUST & MAKE-UP) SHALL <br />BE SUPPLIED BY THE OWNER AND INSTALLED BY THE MECHANICAL <br />CONTRACTOR. ALL THERMOSTATS, DUCTS, FITTINGS, LABOR, & OTHER <br />MATERIALS SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL <br />CONTRACTOR, AS REQUIRED IN ORDER TO ACHIEVE COMPLETE, CODE <br />COMPLIANT, & OPERABLE HVAC SYSTEMS AS INDICATED IN THE PROJECT <br />DOCUMENTS. <br />2. CONTRACTORS AND SUB -CONTRACTORS SHALL CAREFULLY REVIEW THE <br />COMPLETE CONSTRUCTION DOCUMENT PACKAGE. INFORMATION <br />REGARDING THE SCOPE OF THE REQUIRED WORK IS DISPERSED <br />THROUGHOUT THE PROJECT DOCUMENT SET, AND CANNOT BE ACCURATELY <br />DEFINED WITHOUT REFERENCE TO THE COMPLETE PROJECT DOCUMENT <br />SET. <br />3. COORDINATE WITH THE WORK OF OTHER SECTIONS, EQUIPMENT FURNISHED <br />BY OTHERS, REQUIREMENTS OF THE OWNER, AND WITH THE CONSTRAINTS <br />OF THE EXISTING CONDITIONS OF THE PROJECT SITE. AFTER CAREFUL <br />REVIEW OF THE PROJECT DOCUMENTS & THEIR REQUIREMENTS, NOTIFY THE <br />ARCHITECT (IN WRITING) OF ANY DISCREPANCIES PRIOR TO COMMENCING <br />WORK. <br />4, THE DRAWINGS FOR THE HVAC WORK ARE DIAGRAMMATIC, SHOWING THE <br />GENERAL LOCATION, TYPE, LAYOUT, AND EQUIPMENT REQUIRED. THE <br />DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENT. REFER TO <br />THE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS. REFER TO THE <br />MANUFACTURER'S INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS <br />AND OTHER INSTALLATION REQUIREMENTS. SUBMIT SHOP DRAWINGS FOR <br />APPROVAL, PER THE SPECIFICATION REQUIREMENTS. <br />5. ALL WORK SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE, & NATIONAL <br />CODES, AS WELL AS INDUSTRY STANDARDS. ALL REQUIRED <br />CONSTRUCTION/INSTALLATION PERMITS SHALL BE PURCHASED AS NEEDED. <br />LIKEWISE, ALL REQUIRED SITE INSPECTIONS SHALL BE SCHEDULED, <br />PERFORMED, & ALL PERTINENT GOVERNMENTAL APPROVALS/CERTIFICATES <br />OBTAINED & PRESENTED TO THE OWNER PRIOR TO ACHIEVING SUBSTANTIAL <br />COMPLETION. <br />9. WHEN HVAC AIR FLOW IS OVER 2000 CFM PROVIDE SMOKE DUCT DETECTORS <br />IN SUPPLY AND RETURN DUCTS OR AS REQUIRED BY APPLICABLE CODES. <br />DUCT SMOKE DETECTOR SHALL BE SIMPLEX PHOTOELECTRIC SMOKE <br />DETECTOR #2098-9201, SIMPLEX DUCT DETECTOR HOUSING #2098-9649, <br />SIMPLEX BAFFLE #2098-9811, AND SIMPLEX SAMPLING TUBE #2098-9797. <br />HVAC SHUT DOWN RELAY SHALL BE SIMPLEX #2088-9010. FIRE ALARM <br />CONTROL PANEL SHALL BE SIMPLEX #4004-9101 WITH (2) SIMPLEX 6.2 AH <br />BATTERIES #2081-9272. SYSTEM SHALL SHUT DOWN UNITS UPON <br />ACTIVATION OF DUCT SMOKE DETECTOR WHICH WILL SOUND ALARM BELL <br />AND ACTIVATE LIGHT LOCATED IN SIMPLEX FIRE ALARM CONTROL PANEL. <br />FIRE ALARM CONTROL PANEL IS ONLY FOR MONITORING ACTIVATION OF OR <br />TROUBLE WITH DUCT SMOKE DETECTORS. MECHANICAL CONTRACTOR <br />SHALL PROVIDE AND INSTALL DEVICES TO COMPLY WITH N.F.P.A. 90A 4-4. <br />ELECTRICAL CONTRACTOR SHALL WIRE PANEL AND SMOKE DETECTORS. <br />10. CAREFULLY REVIEW THE SPECIFICATIONS FOR ADDITIONAL PROJECT <br />REQUIREMENTS NOT SHOWN ON THE DRAWINGS. <br />11. ALL INDICATED DUCT SIZES ARE "CLEAR INSIDE" DIMENSIONS. <br />12. TESTING AND BALANCING: <br />ALL HVAC SYSTEMS INSTALLED DURING THIS PROJECT ARE REQUIRED TO <br />BE PROPERLY BALANCED BY AN -INDEPENDENT, 'THIRD PARTY" AIR <br />BALANCING AGENCY. THE "T&B" CONTRACTOR MUST BE AABC &/OR <br />NEBB CERTIFIED TO BE CONSIDERED FOR THIS PROJECT. AFTER <br />RECEIPT OF THE OWNER'S APPROVAL, THE MECHANICAL CONTRACTOR <br />SHALL ENGAGE THE APPROVED "T&B" (TESTING & BALANCING) <br />CONTRACTOR. <br />ALL OF THE SUBSEQUENT T&B REPORTS SHALL BE DISTRIBUTED <br />DIRECTLY TO THE OWNER, & SHALL NOT BE ROUTED THROUGH THE <br />MECHANICAL CONTRACTOR. IF THE MECHANICAL CONTRACTOR SHOULD <br />DESIRE TO PERFORM THE "T&B" SERVICES HIMSELF, THE FOLLOWING <br />PROCESSES SHALL APPLY - AABC &/OR NEBB CERTIFICATION IS <br />REQUIRED, & THOROUGH DOCUMENTATION OF PREVIOUS PROJECTS' <br />"T&B" GENERATED BY THE MECHANICAL CONTRACTOR, INCLUDING COPIES <br />OF THE ISSUED REPORTS, SHALL BE PRESENTED TO THE OWNER FOR <br />HIS REVIEW DURING THE REVIEW/APPROVAL PROCESS. IF THE <br />MECHANICAL CONTRACTOR DOES NOT PROVIDE THE NECESSARY <br />DOCUMENTATION, OR IF THE PRESENTED DOCUMENTATION DOES NOT <br />SATISFY THE OWNER, THE "THIRD PARTY" T&B AGENCY WILL BE <br />REQUIRED. <br />ANY "T&B" DOCUMENTATION REQUIRED FOR A CERTIFICATE OF <br />OCCUPANCY SHALL BE PROVIDED AS PART OF THE BASE SCOPE OF <br />WORK; NO ADDITIONAL SERVICE FEES &/OR COSTS WILL BE <br />ENTERTAINED REGARDING THIS ITEM. AGAIN, ANY & ALL "T&B" <br />DOCUMENTATION SHALL BE DISTRIBUTED TO THE OWNER FIRST, & THEN <br />AFTER OWNER APPROVAL, FURTHER DISSEMINATION OF THE SUBJECT <br />DOCUMENTATION CAN OCCUR. <br />REQUIRED MEASURING TECHNIQUES: <br />• ALL DIFFUSERS, REGISTERS, &/OR GRILLES SHALL BE MEASURED <br />BY UTILIZING A HOOD AXIAL VANE VELOMETER; <br />• TOTAL FLOW OF SUPPLY, EXHAUST, MAKE-UP, & RETURN AIR <br />SYSTEMS SHALL BE DETERMINED BY PITOT TUBE TRAVERSES; <br />• UTILIZE THE INSTALLED VOLUME DAMPERS TO BALANCE ALL <br />DEVICES PER THE PROJECT DOCUMENTS' REQUIRED AIR QUANTITIES; & <br />• HOOD EXHAUST SYSTEMS SHALL NOT BE ACCEPTED, IF THE <br />SYSTEM IS 1 CFM BELOW THE INDICATED EXHAUST AIR QUANTITY. <br />LIKEWISE, THE HOOD EXHAUST SYSTEMS SHALL NOT BE ACCEPTED, IF <br />THE SYSTEM IS MORE THAN 3% IN EXCESS OF THE INDICATED <br />EXHAUST AIR QUANTITIES. <br />O1 PROVIDE EXTERNALLY INSULATED 14"X12" MAKEUP AIR DUCT FROM SF-1 LOCATED 8 PROVIDE NEW THERMOSTAT MOUNTED AT 48" AFF. REFER TO SHEET M5, HVAC <br />ON ROOF TO KITCHEN HOOD MAKEUP AIR CONNECTIONS. PROVIDE TRANSITIONS SPECIFICATIONS FOR THERMOSTAT REQUIREMENTS. <br />AS REQUIRED. <br />OROOF MOUNTED MAKEUP AIR UNIT AND ASSOCIATED CURB FURNISHED BY <br />OWNER AND INSTALLED BY MECHANICAL CONTRACTOR. FIELD VERIFY MOUNTING <br />LOCATION. REFER TO SHEET M6 FOR ADDITIONAL INFORMATION. <br />OTYPE I EXHAUST HOOD AT PIZZA OVENS FURNISHED BY OWNER AND INSTALLED BY <br />MECHANICAL CONTRACTOR. REFER TO SHEET M6 FOR ADDITIONAL <br />INFORMATION. <br />O4 CONNECT A WELDED STEEL GREASE DUCT TO EF-1 AT THE ROOF/CURB COLLAR, <br />& TRANSITION AS REQUIRED TO AN 9"x9" WELDED STEEL GREASE DUCT FOR <br />EXTENSION/CONNECTION TO THE TYPE I PIZZA OVEN EXHAUST HOOD AS SHOWN. <br />THE DUCT SHALL BE WRAPPED (IN ACCORDANCE WITH THE MANUFACTURER'S <br />INSTRUCTIONS) WITH 1-1/2" THICK FIREMASTER DUCT WRAP, AS MANUFACTURED <br />BY 3M CO. (OR OTHER APPROVED EQUAL) AS REQUIRED; IN ORDER TO ACHIEVE <br />COMPLIANCE WITH THE CODE REQUIRED GREASE DUCT ENCLOSURE. WRAP <br />SHALL EXTEND FROM THE DUCT CONNECTION AT THE HOOD TO THE DUCT <br />PENETRATION/CONNECTION AT THE ROOF/CURB COLLAR, COMPLETE <br />THROUGHOUT THE ENTIRE LENGTH. IF DUCT ACCESS DOORS ARE REQUIRED, THE <br />FIRE PROTECTIVE WRAP MUST BE INSTALLED/MODIFIED, PER THE <br />MANUFACTURER'S INSTRUCTIONS. THE "OWNER SUPPLIED" ROOF CURB SHALL BE <br />A MINIMUM OF 24" IN HEIGHT, WHEN UTILIZING THE SPECIFIED, "OWNER SUPPLIED" <br />EXHAUST FAN. THE OWNER SHALL PROVIDE THE HOOD & ITS ASSOCIATED FAN <br />(WITH CURB). THE MECHANICAL CONTRACTOR SHALL INSTALL THE EQUIPMENT, <br />AS SHOWN, PROVIDING THE CONNECTING DUCTWORK, WRAP, SUPPORTS, & <br />OTHER APPURTENANCES AS REQUIRED FOR A COMPLETE & OPERABLE SYSTEM. <br />OTYPE I EXHAUST HOOD AT FRYERS FURNISHED BY OWNER AND INSTALLED BY <br />MECHANICAL CONTRACTOR. REFER TO SHEET M7 FOR ADDITIONAL <br />INFORMATION. <br />OCONNECT A WELDED STEEL GREASE DUCT TO EF-2 AT THE ROOF/CURB COLLAR, <br />& TRANSITION AS REQUIRED TO A 7"x7" WELDED STEEL GREASE DUCT FOR <br />EXTENSION/CONNECTION TO THE TYPE I WINGSTREET FRYER EXHAUST HOOD AS <br />SHOWN. THE DUCT SHALL BE WRAPPED (IN ACCORDANCE WITH THE <br />MANUFACTURER'S INSTRUCTIONS) WITH 1-1/2" THICK FIREMASTER DUCT WRAP, AS <br />MANUFACTURED BY 3M CO. (OR OTHER APPROVED EQUAL) AS REQUIRED, IN <br />ORDER TO ACHIEVE COMPLIANCE WITH THE CODE REQUIRED GREASE DUCT <br />ENCLOSURE. WRAP SHALL EXTEND FROM THE DUCT CONNECTION AT THE HOOD <br />TO THE DUCT PENETRATION/CONNECTION AT THE ROOF/CURB COLLAR, <br />COMPLETE THROUGHOUT THE ENTIRE LENGTH, IF DUCT ACCESS DOORS ARE <br />REQUIRED, THE FIRE PROTECTIVE WRAP MUST BE INSTALLED/MODIFIED, PER THE <br />MANUFACTURER'S INSTRUCTIONS. THE "OWNER SUPPLIED" ROOF CURB SHALL BE <br />A MINIMUM OF 22 1/2" IN HEIGHT, WHEN UTILIZING THE SPECIFIED, "OWNER <br />SUPPLIED" EXHAUST FAN. THE OWNER SHALL PROVIDE THE HOOD & ITS <br />ASSOCIATED EXHAUST FAN (WITH CURB). THE MECHANICAL CONTRACTOR SHALL <br />INSTALL THE EQUIPMENT, AS SHOWN, PROVIDING THE CONNECTING DUCTWORK, <br />WRAP, SUPPORTS, & OTHER APPURTENANCES AS REQUIRED FOR A COMPLETE & <br />OPERABLE SYSTEM. <br />O7 INSTALL OWNER FURNISHED HOOD. PROVIDE ANSUL (OR OTHER APPROVED <br />EQUAL) FIRE SUPPRESSION SYSTEM FOR PRE -PIPED HOOD. <br />OROOF MOUNTED REMOTE CONDENSING UNITS FOR FREEZER/COOLER SHOWN <br />FOR REFERENCE ONLY. <br />10 PROVIDE CEILING MOUNTED EXHAUST FAN ABOVE RESTROOM. BALANCE FAN TO <br />SCHEDULED CFM AND INTERLOCK OPERATION WITH RESTROOM LIGHT SWITCH. <br />11 PROVIDE EXHAUST AIR DUCT FROM CEILING MOUNTED EXHAUST FAN. TERMINATE <br />WITH WATER PROOF ROOF CAP WITH BIRD SCREEN. ROOF HOOD TO BE LOCATED <br />A MINIMUM OF 10'-0" FROM ALL MECHANICAL AIR INTAKE LOCATIONS. <br />12 PROVIDE PVC JACKET FOR REFRIGERANT LINES IN COOLER AND FREEZER. <br />13 INSTALL HOOD MANUFACTURER FURNISHED REMOTE KITCHEN TEMPERATURE <br />SENSOR AT CEILING. <br />14 INSTALL NEW RTU AND ROOF CURB. COORDINATE WITH NPC CONSTRUCTION <br />MANAGER AND STRUCTURAL DRAWINGS FOR EXACT RTU INSTALLATION <br />LOCATION. MAINTAIN ALL MANUFACTURERS CLEARANCES FROM ADJACENT <br />EQUIPMENT. <br />GENERAL NOTES 1 3 1 KEY NOTES 1 2 1 <br />NOTE: <br />FLEXIBLE DUCTWORK SHALL NOT EXCEED 5'-0" IN LENGTH AND SHALL NOT BE <br />INSTALLED IN INACCESSIBLE AREAS. FLEXIBLE DUCT SHALL BE SUPPORTED TO <br />AVOID SHARP BENDS AND SAGGING. ANY DUCT NOT PROPERLY INSTALLED WILL BE <br />REPLACED AT CONTRACTORS EXPENSE. <br />GREASE DUCT ALTERNATIVE <br />AS AN ALTERNATIVE TO FIELD FABRICATED GREASE EXHAUST DUCT AS SPECIFIED, <br />THE CONTRACTOR MAY FURNISH DOUBLE WALL, FACTORY BUILT GREASE DUCT FOR <br />USE WITH TYPE I KITCHEN HOODS THAT CONFORM TO THE REQUIREMENTS OF <br />NFPA-96. PRODUCTS SHALL BE ETL LISTED TO UL-1978 AND UL-221. DOUBLE WALL <br />DUCTS SHALL BE LISTED FOR A CONTINUOUS INTERNAL TEMPERATURE OF 500°F AND <br />INTERMITTENT TEMPERATURES OF 2000°F. <br />BASIS OF DESIGN FOR FACTORY BUILT GREASE DUCT SHALL BE CAPTIVE AIRE <br />MODELS DW-3Z, DW-3R, AND DW-2R. PRODUCTS SHALL BE SUBMITTED FOR <br />APPROVAL BY THE ENGINEER OF RECORD IN ACCORDANCE WITH PROJECT <br />SPECIFICATIONS AND REQUIREMENTS. <br />FIELD VERIFICATION NOTES: <br />1. CODE REQUIRED MINIMUM DISTANCES BETWEEN AIR INTAKE LOCATIONS, AND <br />EXHAUST &/OR FLUE DISCHARGE LOCATIONS SHALL BE PROPERLY MAINTAINED. <br />ALL CODE REQUIRED DIMENSIONS FOR THE VARIOUS APPURTENANCES SHALL <br />BE REVIEWED, VERIFIED, & COORDINATED BY THE MECHANICAL CONTRACTOR. <br />ANY DISCREPANCIES SHALL BE IDENTIFIED TO THE OWNER OR OWNER'S <br />REPRESENTATIVE, IN WRITING, PRIOR TO THE COMMENCEMENT OF <br />CONSTRUCTION/INSTALLATION. <br />2. THE PROPOSED "PROJECT TEAM APPROVED" LOCATIONS OF ALL <br />ROOF -MOUNTED EQUIPMENT SHALL BE PRESENTED TO THE OWNER/LANDLORD <br />FOR THEIR APPROVAL (REQUIRED), PRIOR TO THE COMMENCEMENT OF <br />CONSTRUCTION/INSTALLATION. SEE ARCHITECTURAL DRAWING FOR PROPOSED <br />LOCATIONS. RECONCILE ANY DISCREPANCIES BEFORE PRESENTING THE <br />PROPOSED LOCATIONS FOR APPROVAL. <br />3. VERIFY THE AVAILABLE "ABOVE CEILING CLEAR SPACE" FOR DUCT INSTALLATION, <br />PRIOR TO THE COMMENCEMENT OF ANY DUCT FABRICATION. ALLOW 6" ABOVE <br />THE CEILING LINE FOR LIGHT FIXTURES. THE DUCTWORK SHALL EXTEND AS <br />REQUIRED BELOW THE BAR JOISTS. IF ROUTING OF THE DUCT NEEDS TO BE <br />"THROUGH" THE JOISTS IN ANY LOCATION, THIS MUST BE APPROVED BY THE <br />OWNER, PRIOR TO INSTALLATION. LIKEWISE, IF THE DUCT DIMENSIONS ARE TO <br />BE REVISED/MODIFIED, THE REVISIONS/MODIFICATIONS MUST BE APPROVED <br />PRIOR TO INSTALLATION. <br />4. VERIFY THE PROPOSED THERMOSTAT LOCATIONS WITH NPC FACILITIES/PROJECT <br />MANAGER PRIOR TO THE INSTALLATION OF SAME. <br />5, VERIFY AVAILABLE ELECTRICAL SYSTEM VOLTAGES, & COORDINATE WITH ALL "TO <br />BE SUPPLIED" ELECTRICAL DEVICES/EQUIPMENT. <br />MINIMUM OUTDOOR AIR REQUIREMENTS <br />ROOM <br />AREA <br />IN SQ. FT <br />PEOPLE <br />PER 1000 <br />SQ. FT <br />CFM PER <br />PERSON <br />CFM PER <br />SQ. FT <br />EXHAUST <br />REQUIRED <br />CFM <br />CODE <br />REQUIRED <br />CFM <br />NOTE <br />KITCHEN AREA <br />1025 <br />-- <br />-- <br />- <br />718 <br />718 <br />LOBBY <br />292 <br />30 <br />7.5 <br />0.06 <br />- <br />66 <br />RESTROOM <br />58 <br />-- <br />- <br />70 <br />-- <br />TRANSFERRED FROM ADJACENT SPACE <br />*TOTAL <br />* PER AIR BALANCE SCHEDULE 1200 CFM OF OUTDOOR AIR TO BE SUPPLIED TO SPACE. <br />783 <br />H.V.A.C. FLOOR PLAN 1 1/4" = V-0" <br />1 <br />