Laserfiche WebLink
> CV <br />2� N <br />S3 004 <br />FD 003 <br />2'V <br />FCO 003 <br />CV co <br />\ CV <br />353, <br />/ <br />3G� <br />FD 003 \ <br />0'w� FCO 0 <br />N <br />g s� <br />2� S3 004 <br />311VTR N CO 003 <br />I� - FS 002 <br />Usk <br />2'V <br />fV <br />FCO 003 <br />CW <br />> S3 004 <br />CV V <br />?'� N <br />411SW - <br />.I 'S4 <br />OKI-, <br />1. PLUMBING CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF THE SIZE & <br />DEPTH OF THE EXISTING SANITARY WASTE PIPING. <br />2. REFER TO SHEET P1 - PLUMBING SCHEDULE FOR LINE SIZES NOT SHOWN ON <br />PLAN. <br />3. ALL VENTS, VTRS, WCO'S, FCO'S, ETC. MAY NOT BE SHOWN ON PLAN. REFER TO <br />PLUMBING RISER DIAGRAM FOR VERIFICATION. <br />4. INSTALL VTR AT LOCATIONS AS SHOWN ON PLUMBING PLAN AND PLUMBING <br />RISER DIAGRAM. ALL OTHER VENTS GO TO VENT LINE AS SHOWN. <br />M <br />e52/000 <br />�\v <br />1O PROVIDE WITH TRAP PRIMER AND CONNECT TO NEAREST CW PIPING. REFER TO DETAIL 3/P4 <br />O2 VENT UP THROUGH ROOF. SEE RISER FOR ALL VENT AND PIPE SIZING. PLUMBING VENTS TO <br />BE LOCATED A MINIMUM OF 10' FROM FRESH AIR INTAKES. FIELD COORDINATE FINAL <br />LOCATIONS. <br />O3 PROVIDE 1" COPPER CONDENSATE DRAIN LINE FROM THE EVAPORATOR COILS IN THE <br />WALK-IN COOLER AND FREEZER, PROVIDE P-TRAPS ON CONDENSATE DRAIN LINE AT <br />EVAPORATOR COILS. ROUTE TO FLOOR DRAIN AS SHOWN. CONDENSATE PIPING SHALL BE <br />INSTALLED AS HIGH AS POSSIBLE IN WALK-IN COOLER AND FREEZER TO ALLOW FOR <br />SHELVING INSTALLATION. 1-1/2" AIRGAP FOR INDIRECT WASTE REQUIRED. <br />® PROVIDE 1" PVC CONDENSATE LINE FOR HVAC UNITS. DRAIN INTO STORM DRAIN CLOSEST TO <br />THE LOCATION AS SHOWN. PROVIDE AIR GAP PER CODE 1-112" MINIMUM REQUIRED. <br />PROVIDE SCREWED CLEAN OUT TYPICAL AS SHOWN. <br />© ROUTE 2" WASTE LINE FROM 3-COMPARTMENT SINK TO FLOOR SINK WITH INDIRECT WASTE <br />CONNECTION. PROVIDE AIR GAP PER CODE. 4" MINIMUM REQUIRED. <br />O7 ROUTE 2" WASTE LINE FROM DISHWASHER TO FLOOR SINK WITH INDIRECT WASTE <br />CONNECTION. PROVIDE AIR GAP PER CODE. 4" MINIMUM REQUIRED. <br />Q CONNECT NEW SANITARY WASTE PIPING TO EXISTING SANITARY WASTE LINE. VERIFY SIZE, <br />DEPTH AND LOCATION. <br />O CONNECT NEW GREASE WASTE PIPING TO EXISTING GREASE WASTE LINE. VERIFY SIZE DEPTH <br />AND LOCATION. <br />WASTE AND VENT ISOMETRIC RISER) NTS 1 4 1 GENERAL NOTESI NTS 1 3 1 KEYNOTES1 NTS 1 2 1 <br />4"GW <br />9 <br />3"GW - <br />_ 4„GW _ .................. <br />- 41'SW - oc <br />S5 003 <br />FD 003 <br />IL2" <br />T <br />3"VTR <br />IMPORTANT NOTE: <br />PLUMBING CONTRACTOR SHALL WRAP THE WALK-IN FREEZER DRAIN <br />PIPING WITH HEAT TRACE TAPE, INSULATE WITH 3/4" ARMAFLEX <br />INSULATION, AND PROVIDE PVC FIELD JACKET FOR ALL CONDENSATE <br />PIPE IN THE FREEZER. <br />FS 1 002 <br />mi m <br />ro-1 <br />4 <br />RTU <br />1 <br />Dq 003) <br />N <br />°r° <br />00 <br />O <br />LL <br />� <br />U) <br />t) <br />cc <br />co <br />Q <br />N <br />o <br />N <br />w <br />O <br />z <br />Y <br />Z <br />QQ <br />v <br />Q <br />O <br />oC <br />x <br />z <br />a <br />z <br />W <br />z <br />Q <br />W <br />U) <br />G <br />0093 <br />C0 J <br />*kmLL <br />.1 <br />J <br />�QJ <br />Lc) <br />Lrn i" <br />ui a <br />� W <br />L coo N <br />UN <br />U)10 <br />LO <br />LO <br />c <br />N <br />E <br />O <br />x <br />N <br />m <br />o <br />c: <br />- <br />n <br />o� <br />LL. <br />0 <br />� <br />-��Q <br />w Z <br />u' <br />8) <br />N <br />(y) <br />u <br />o, <br />z <br />o` <br />CL <br />0 <br />V00 <br />Nr <br />`�` Q�p°°°oo°°°� �s <br />- °°° \'� C ENSS, <br />* $ 00 <br />No. 65765 o * __ <br />O * O <br />o STATE OF o° <br />V3 $ o 'j <br />R oQ <br />unun++ <br />SHEET NUMBER <br />P2 <br />WASTE AND VENT PLAN 1 1/4" _ "-0" 11 <br />