41
<br />4
<br />r
<br />r�
<br />c
<br />C
<br />0
<br />EI
<br />O
<br />04
<br />J
<br />U-
<br />a)
<br />t
<br />IM
<br />cv
<br />06
<br />0
<br />cM
<br />0
<br />�I
<br />Y
<br />U
<br />(D
<br />U)
<br />c
<br />0)
<br />E
<br />U
<br />0
<br />i
<br />C
<br />C
<br />c
<br />ca
<br />0
<br />N
<br />O
<br />M
<br />M
<br />O
<br />LO
<br />T_
<br />O
<br />CV
<br />LO
<br />N
<br />O
<br />i r
<br />Start]°uckS-LEED Volume Build Certification Version 3.0
<br />Project Scorecard and Documentation
<br />Project Information
<br />Store Name
<br />P reject #:
<br />Store #:
<br />city:
<br />state/Provnce:
<br />Country:
<br />ZIP/P ostal, Code:
<br />US 301 & DAUGHTERY RD
<br />1186 1
<br />7050
<br />EPHY'RHILLS
<br />FL
<br />USA
<br />Gross Area (sf):le5W
<br />Starbucks LEED Cl Scorecard
<br />standard
<br />Version 3.5,.Updated: Jan 29, 2018
<br />Scope of Work & Responsibility: % Modification
<br />Foundation: LL, r- d
<br />Envelope: LL, nebV
<br />HVAC: LL, new `
<br />Parking Lot: LL, new
<br />Landscaping, H • new
<br />Irrigation: u , rietro..;'
<br />LEED Retail for. Commercial interior
<br />Ground Lip storek use NC; Stand Alone store Tenant improvement with greaterthan 6W envelope replacement or additions
<br />within Starbucks scope also use NC The above rating system selectdun ispruvided for guidance, it tan be changedif
<br />warranted if the ratingsystem seiemon is unclear please contact the HPBT.
<br />1 Bicycle Commuting NC/Cl 1 pt CM Checklist CM
<br />Commissioning Document FSM
<br />Water Use Reduction-20Ya(Req)$0"/u Reduction NC/Cl 3_11 pts Pre -Approved: Use1.28 gpftoilet. metered dipper Well and;6 gpm restroom and backlirt
<br />hand sink faucets. Flow rates shown in the plumbing schedule, AOR/EOR
<br />Cut sheets and calculator if XDID flow rates are higher than standard DIDs.
<br />Y �. Fundamental Commissioning Of Building Energy Systems NC/CI Req Commissioning Document FSM
<br />3 ' SOD AORIEOR
<br />, m
<br />��- EAp2Affidavit
<br />Y Minimum Energy Performance NC/CI Req AOR/EOR
<br />Or, EAp2 Checklist
<br />Y ;v Fundamental Refrigerant Management NC/CI Rep Pre-ApproVe& No Documentation Required HPBT
<br />a �6 Optimize Energy Performance - Lighting Power 16120125130135% Cl 1-a pts Pre -approved in most cases: talc squired for non compliant design
<br />Exterior Lighting Calc if Sbux control AOR/EOR
<br />„
<br />1 % AND, Optimize Energy Performance - Equipment & Appliances 70177 Cl 1.4 pis Pre -Approved: No Documentation Required if streamline requirements; met. Otherwise, AOWEOR
<br />184190% provide calculator,
<br />a Measurement and Verification " NC/CI 2.6 pts Lease HPBT
<br />Green Power NC/Cl 2 pts Pre -Approved': No documentation required. HFBT
<br />CM Checklist PM
<br />YStorage & Collection of Recyclables NC/Cl Req
<br />Ground for Your Garden disc in the drawings. AOR
<br />1 Tenant Space - Long -Term Commitment Cl 1 pt Lease HP13T
<br />%.-,1"9s: -; i'fs ,..I'f 3 _ _I�� ,•�• `r..�,'iC=fir".I'eS--:
<br />xR1,s; EQpt Calculator AOR/EOR
<br />Y Minimum Indoor Air Quality (IAQ) Performance NC/Cl Req
<br />TAB Report is 90 110% of design rate. PM
<br />Y Environmental Tobacco Smoke (ETS) Control NC/CI Req Pre -Approved in US and Canada: No documentation required. All others, provide completed HPBT
<br />�H credit form.
<br />Lit
<br />1 Construction FAQ Management Plan - During Construction NC/CI 1 pt IAQ Plan in drawings, AOR
<br />2 IAQ Checklists 0C
<br />1 Low -Emitting Materials -Adhesives and Sealants NC/Cl / pt
<br />E0o4 GC Affidavit GC
<br />t Low -Emitting Materials - Paints and -Coatings NC/CI 1 pt
<br />1 Low -Emitting Materials - Flooring Systems NC/Cl 1 pt
<br />1 - Low -Emitting Materials - Composite Wood and Agrifiber Products NC/Cl 1 pt Pre -Approved product list in the drawings AOR
<br />1 Low -Emitting Materials - Ceiling and Wall Systems NC/Cl 1 pt
<br />1 Thermal Comfort, Design NC/Cl 1 pt Starbucks Heat Load Calcs AOR/EOR
<br />ASHRAE 56 Cam pliance
<br />Ps9Approved: No documentation required for stoss with cads seating adjacent to glazing'
<br />I ;`!']Daylight & VI ews - VI ews for 90%of Spaces NC/CI 1 pt and no regularly occupied spaces in the BOH except ferthe Managers Workstation: AOR
<br />Provide calcand sigh1line floor plan It pre -approved requirements are not met
<br />Pre -Approved: No documentation required If using standard DID fixtures and bulbs or XOIDS
<br />1 oYJc Material Source Reduction - Mercury in Li ght Bulbs NC/CI 1 pt utilize integrated LEDs or standard DID bulbs. AOR/EOR
<br />Provide calculator If pre approved conditions are not met.
<br />CM Checklist
<br />CM
<br />1
<br />Green Educational Program
<br />NCACI
<br />1 t
<br />r
<br />Green Education Discs shewn:In the drawings
<br />ADR
<br />b�
<br />tj .�_!.
<br />;r
<br />l:,t
<br />_. '.,..c ;,�Y,.,,il
<br />r1,6ty, 7. r
<br />Ei-
<br />Go towww.usgbc.org/rpc and enter as much of the project's location as
<br />srgnatare rs cunjirmatron thatthSSCoremt'd haS been t a r ateit u€t rawrngt su., rcrerit y show the d etai s nee e to 76737 r(r, t ie pursuE urrregrrrs trs and cte Rs.
<br />+Dart•
<br />CONTRACTOR RESPONSIBILITIES FOR BUILDING COMMISSIONING
<br />CONTRACTOR SHALL PROVIDE SUPPORT AND WORKS AS SPECIFIED, NEEDED AND REQUIRED
<br />TO CONDUCT AND FACILITATE STARBUCKS STAFF BUILDING COMMISSIONING EFFORTS. THIS
<br />WORK WILL BE COMPRISED OF THREE DISTINCT EFFORTS:
<br />1) SUPPORT STARBUCKS COMMISSIONING AGENT (CXA) DURING INSTALLATION VERIFICATION
<br />AND CORRECT DISCLOSED DEFICIENCIES; 2) PERFORM TESTING, ADJUSTING, BALANCING AND
<br />SYSTEM STARTUP AND SUPPORT FUNCTIONAL PERFORMANCE TESTING BY STARBUCKS CXA; 3)
<br />CORRECT DEFICIENCIES DISCLOSED BY FUNCTIONAL PERFORMANCE TESTING AND SUBMIT
<br />REPORTS. CONTRACTOR SHALL PERFORM AND PROVIDE THE FOLLOWING:
<br />A. SYSTEMS SUBJECT TO COMMISSIONING MAY INCLUDE, BUT ARE NOT LIMITED TO, DOMESTIC
<br />HOT WATER GENERATION, HVAC SYSTEMS, ROOFTOP UNITS, EXHAUST FANS, HVAC CONTROLS,
<br />LIGHTING CONTROLS, AIR CURTAINS, BUILT -INN REFRIGERATION EQUIPMENT, AND RENEWABLE
<br />ENERGY SYSTEMS.
<br />B. CONTRACTOR SHALL INCLUDE COMMISSIONING ACTIVITIES IN PROJECT SCHEDULE AND
<br />SHOW INTERVALS FOR PERFORMANCE OF WORK FOR WHICH CONTRACTOR IS RESPONSIBLE
<br />AND INTERVALS FOR WORK PERFORMED BY STARBUCKS CXA. CONTRACTOR SHALL SHOW
<br />RESOURCES FOR PERFORMING ALL WORK RELATED TO COMMISSIONING ACTIVITIES ON A LINE
<br />ITEM IN THE SCHEDULE OF VALUES.
<br />C. CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S
<br />REQUIREMENTS AND ALL CONTRACT DOCUMENTS. ENSURE THAT ALL EQUIPMENT IS INSTALLED
<br />TOTALLY COMPLETE, AND ACCESSIBLE TO STARBUCKS CXA FOR INSTALLATION VERIFICATION
<br />AND FUNCTIONAL PERFORMANCE TESTING PRIOR TO THE SCHEDULED START OF INSTALLATION
<br />VERIFICATIONS.
<br />D. INSTALLATION VERIFICATION SHALL BE PERFORMED BY STARBUCKS' CXA. CONTRACTOR
<br />SHALL SUPPORT STARBUCKS CXA INSTALLATION VERIFICATION EFFORTS AS NECESSARY.
<br />PROVIDE ALL ACCESS AND EQUIPMENT NECESSARY FOR STARBUCKS STAFF TO VERIFY THAT
<br />THE EQUIPMENT IS INSTALLED CORRECTLY.
<br />E. CONTRACTOR SHALL BE READILY AVAILABLE DURING INSTALLATION VERIFICATION TO
<br />CORRECT ANY DEFICIENCIES OR DEFECTS DISCLOSED BY THE INSTALLATION VERIFICATION
<br />PROCESS. CORRECTIONS SHALL BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION OF THE
<br />CONSTRUCTION SCHEDULE.
<br />F. ALL HVAC, EXHAUST FAN AND AIR CURTAIN EQUIPMENT SHALL BE TESTED, ADJUSTED AND
<br />BALANCED BY THE CONTRACTORS TESTING, ADJUSTING AND BALANCE AGENT (SEE TESTING,
<br />ADJUSTING AND BALANCING) AFTER THE SYSTEM IS VERIFIED TO BE COMPLETE AND CORRECT
<br />BY STARBUCKS CXA, IN ACCORDANCE WITH THE REQUIREMENTS OF THESE DOCUMENTS. ALL
<br />HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES,
<br />COMPONENTS, EQUIPMENT AND SYSTEMS ARE CALIBRATED, ADJUSTED AND OPERATE IN
<br />ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. SEQUENCES OF OPERATION
<br />CALIBRATED, ADJUSTED AND OPERATE IN ACCORDANCE WITH THESE PLANS AND
<br />SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE TESTED TO ENSURE THAT THEY
<br />OPERATE IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS. DELIVERABLES:
<br />PRELIMINARY, WRITTEN TESTING AND AIR BALANCE REPORT CONFORMING TO THE
<br />REQUIREMENTS SPECIFIED HEREIN DOCUMENTING THE INFORMATION SPECIFIED,
<br />, ETC. TO THE
<br />STARBUCKS CXA IMMEDIATELY UPON COMPLETION OF THE WORK.
<br />G. CONTRACTOR SHALL INFORM STARBUCKS CXA WHEN EQUIPMENT IS READY FOR
<br />FUNCTIONAL PERFORMANCE TESTING. ALL EQUIPMENT SHALL BE READY FOR FUNCTIONAL
<br />PERFORMANCE TESTING PRIOR TO STARTING TESTING. CONTRACTOR SHALL OPERATE
<br />EQUIPMENT FOR STARBUCKS CXA AND VERIFY BY DEMONSTRATION THE CORRECT OPERATION
<br />OF EQUIPMENT, RESPONSE OF SENSORS, AND PROPER EXECUTION OF HVAC CONTROL AND
<br />LIGHTING SEQUENCES; INCLUDING BUT NOT LIMITED TO AIR MOVEMENT, TEMPERATURE,
<br />SOUND AND CONTROL RESPONSE. PROVIDE ANY SECURITY ACCESS, HARDWARE, SOFTWARE,
<br />OR OTHER SUPPORT AS NEEDED FOR THE STARBUCKS CXA TO EFFICIENTLY WITNESS AND
<br />DOCUMENT ALL EQUIPMENT TESTING. STARBUCKS CXA WILL RECORD TED EQUIPMENT
<br />OPERATION AND RESPONSE TO TESTING SEQUENCES AND PREPARE A LIST OF ANY
<br />DEFICIENCIES DISCLOSED BY THE FUNCTIONAL PERFORMANCE TESTS FOR CORRECTION BY
<br />THE CONTRACTOR. EQUIPMENT INCLUDES BUT IS NOT LIMITED TO, AIR HANDLING UNITS,
<br />ROOFTOP AND SPLIT TYPE, CONDENSING UNITS, EXHAUST FANS, LIGHTING CONTROLS, ETC.
<br />DELIVERABLES: PROVIDE COMPLETED COPIES OF ALL START UP REPORTS, FILLED OUT ON THE
<br />MANUFACTURERS FORMS, TO THE STARBUCKS CXA.
<br />H. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES OR DEFICIENCIES DISCLOSED
<br />DURING THE FUNCTIONAL PERFORMANCE TESTING PROCESS. CORRECTIONS SHOULD BE MADE
<br />IN A TIMELY MANNER WITHOUT DISRUPTION TO THE SYSTEM AND CONSTRUCTION SCHEDULE.
<br />I. CONTRACTOR SHALL BE READILY BE AVAILABLE FOR ANY RE -TESTING OF EQUIPMENT
<br />DEEMED NECESSARY BY STARBUCKS CXA DURING INSTALLATION VERIFICATION AND
<br />FUNCTIONAL PERFORMANCE TESTING. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY
<br />ISSUES OR DEFICIENCIES FOUND IN THE SYSTEM DURING ANY AND ALL RETESTING.
<br />CORRECTIONS SHOULD E MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE SYSTEM
<br />AND CONSTRUCTION SCHEDULE. DELIVERABLES: FINAL BALANCE REPORT, DEFICIENCIES LIST
<br />NOTING CORRECTIVE ACTIONS PERFORMED BY CONTRACTOR IN RESPONSE TO INSTALLATION
<br />VERIFICATION AND FUNCTIONAL PERFORMANCE TEST RESULTS.
<br />J. CONSTRUCTION AND POST CONSTRUCTION TESTING: ADDITIONAL TESTING MAY BE
<br />REQUIRED BY LEED AND OTHER PROCESSES THAT MAY OCCUR OUT OF SEQUENCE WITH
<br />COMMISSIONING SERVICE. CONTRACTOR SHALL CONDUCT, DOCUMENT, SUPPORT AND
<br />SCHEDULE THIS TESTING AS DIRECTED BY STARBUCKS CXA.
<br />STARBUCKS
<br />2401 UTAH AVENUE SOUTH
<br />SEATTLE, WASHINGTON 98134
<br />(206) 318-1575
<br />THESE DRAWINGS AND SPECIFICATIONS ARE
<br />CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br />PROPERTY OF STARBUCKS CORPORATION,
<br />WHICH IS THE OWNER OF THE COPYRIGHT IN
<br />THIS WORK. THEY SHALL NOT BE
<br />REPRODUCED (IN WHOLE OR IN PART), SHARED
<br />WITH THIRD PARTIES OR USED IN ANY MANNER
<br />ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br />PROJECT WITHOUT THE PRIOR WRITTEN
<br />CONSENT OF STARBUCKS CORPORATION.
<br />THESE DRAWINGS AND SPECIFICATIONS ARE
<br />INTENDED TO EXPRESS DESIGN INTENT FOR A
<br />PROTOTYPICAL STARBUCKS STORE (WHICH IS
<br />SUBJECT TO CHANGE AT ANYTIME) AND DO
<br />NOT REFLECT ACTUAL SITE CONDITIONS.
<br />NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br />NOR LIABILITY TO THE OTHER (EXCEPT STATED
<br />ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br />FULLY EXECUTED BY BOTH PARTIES.
<br />STARBUCKS TEMPLATE VERSION 2018.01.26
<br />Design Forum
<br />Architects Inc.
<br />700 W. Pete Rose Way, Suite 460 Donald J. Rethman
<br />Cincinnati, OH 45203 Architect In Charge
<br />Tel: (513) 421-2210 License: AR0017303
<br />Design Forum
<br />Engineering
<br />700 W. Pete Rose Way, Suite 460 Timothy L Raberding, PE
<br />Cincinnati, OH 45203 Professional Engineer
<br />Tel: 513 421-22 ucense:62078
<br />25 0 2
<br />1 8
<br />A1200iv 03 v
<br />I..L
<br />Ill
<br />n�
<br />(D
<br />LO
<br />D
<br />.
<br />C`M
<br />J
<br />Q
<br />0
<br />LL
<br />0
<br />J
<br />m
<br />J
<br />di
<br />Q
<br />�(
<br />W
<br />J
<br />J
<br />H
<br />r
<br />O
<br />C)
<br />H
<br />Q
<br />0
<br />M
<br />w
<br />_
<br />a
<br />a
<br />�N
<br />STORE #:
<br />56350
<br />PROJECT #:
<br />81186-001
<br />ISSUE DATE:
<br />06/22/18
<br />DESIGN PROGRAM
<br />ROMINA VIGNOLO
<br />MANAGER:
<br />LEEDO AP:
<br />PRODUCTION DESIGNER:
<br />MICHAEL.B.SARKA
<br />CHECKED BY�
<br />M.MCCAUGHEY
<br />Revision Schedule
<br />Rev Date By Description
<br />SHEET TITLE:
<br />LEED INFORMATION
<br />I SCALE: NO SCALE I
<br />SHEET NUMBER:
<br />G-005