Laserfiche WebLink
41 <br />4 <br />r <br />r� <br />c <br />C <br />0 <br />EI <br />O <br />04 <br />J <br />U- <br />a) <br />t <br />IM <br />cv <br />06 <br />0 <br />cM <br />0 <br />�I <br />Y <br />U <br />(D <br />U) <br />c <br />0) <br />E <br />U <br />0 <br />i <br />C <br />C <br />c <br />ca <br />0 <br />N <br />O <br />M <br />M <br />O <br />LO <br />T_ <br />O <br />CV <br />LO <br />N <br />O <br />i r <br />Start]°uckS-LEED Volume Build Certification Version 3.0 <br />Project Scorecard and Documentation <br />Project Information <br />Store Name <br />P reject #: <br />Store #: <br />city: <br />state/Provnce: <br />Country: <br />ZIP/P ostal, Code: <br />US 301 & DAUGHTERY RD <br />1186 1 <br />7050 <br />EPHY'RHILLS <br />FL <br />USA <br />Gross Area (sf):le5W <br />Starbucks LEED Cl Scorecard <br />standard <br />Version 3.5,.Updated: Jan 29, 2018 <br />Scope of Work & Responsibility: % Modification <br />Foundation: LL, r- d <br />Envelope: LL, nebV <br />HVAC: LL, new ` <br />Parking Lot: LL, new <br />Landscaping, H • new <br />Irrigation: u , rietro..;' <br />LEED Retail for. Commercial interior <br />Ground Lip storek use NC; Stand Alone store Tenant improvement with greaterthan 6W envelope replacement or additions <br />within Starbucks scope also use NC The above rating system selectdun ispruvided for guidance, it tan be changedif <br />warranted if the ratingsystem seiemon is unclear please contact the HPBT. <br />1 Bicycle Commuting NC/Cl 1 pt CM Checklist CM <br />Commissioning Document FSM <br />Water Use Reduction-20Ya(Req)$0"/u Reduction NC/Cl 3_11 pts Pre -Approved: Use1.28 gpftoilet. metered dipper Well and;6 gpm restroom and backlirt <br />hand sink faucets. Flow rates shown in the plumbing schedule, AOR/EOR <br />Cut sheets and calculator if XDID flow rates are higher than standard DIDs. <br />Y �. Fundamental Commissioning Of Building Energy Systems NC/CI Req Commissioning Document FSM <br />3 ' SOD AORIEOR <br />, m <br />��- EAp2Affidavit <br />Y Minimum Energy Performance NC/CI Req AOR/EOR <br />Or, EAp2 Checklist <br />Y ;v Fundamental Refrigerant Management NC/CI Rep Pre-ApproVe& No Documentation Required HPBT <br />a �6 Optimize Energy Performance - Lighting Power 16120125130135% Cl 1-a pts Pre -approved in most cases: talc squired for non compliant design <br />Exterior Lighting Calc if Sbux control AOR/EOR <br />„ <br />1 % AND, Optimize Energy Performance - Equipment & Appliances 70177 Cl 1.4 pis Pre -Approved: No Documentation Required if streamline requirements; met. Otherwise, AOWEOR <br />184190% provide calculator, <br />a Measurement and Verification " NC/CI 2.6 pts Lease HPBT <br />Green Power NC/Cl 2 pts Pre -Approved': No documentation required. HFBT <br />CM Checklist PM <br />YStorage & Collection of Recyclables NC/Cl Req <br />Ground for Your Garden disc in the drawings. AOR <br />1 Tenant Space - Long -Term Commitment Cl 1 pt Lease HP13T <br />%.-,1"9s: -; i'fs ,..I'f 3 _ _I�� ,•�• `r..�,'iC=fir".I'eS--: <br />xR1,s; EQpt Calculator AOR/EOR <br />Y Minimum Indoor Air Quality (IAQ) Performance NC/Cl Req <br />TAB Report is 90 110% of design rate. PM <br />Y Environmental Tobacco Smoke (ETS) Control NC/CI Req Pre -Approved in US and Canada: No documentation required. All others, provide completed HPBT <br />�H credit form. <br />Lit <br />1 Construction FAQ Management Plan - During Construction NC/CI 1 pt IAQ Plan in drawings, AOR <br />2 IAQ Checklists 0C <br />1 Low -Emitting Materials -Adhesives and Sealants NC/Cl / pt <br />E0o4 GC Affidavit GC <br />t Low -Emitting Materials - Paints and -Coatings NC/CI 1 pt <br />1 Low -Emitting Materials - Flooring Systems NC/Cl 1 pt <br />1 - Low -Emitting Materials - Composite Wood and Agrifiber Products NC/Cl 1 pt Pre -Approved product list in the drawings AOR <br />1 Low -Emitting Materials - Ceiling and Wall Systems NC/Cl 1 pt <br />1 Thermal Comfort, Design NC/Cl 1 pt Starbucks Heat Load Calcs AOR/EOR <br />ASHRAE 56 Cam pliance <br />Ps9Approved: No documentation required for stoss with cads seating adjacent to glazing' <br />I ;`!']Daylight & VI ews - VI ews for 90%of Spaces NC/CI 1 pt and no regularly occupied spaces in the BOH except ferthe Managers Workstation: AOR <br />Provide calcand sigh1line floor plan It pre -approved requirements are not met <br />Pre -Approved: No documentation required If using standard DID fixtures and bulbs or XOIDS <br />1 oYJc Material Source Reduction - Mercury in Li ght Bulbs NC/CI 1 pt utilize integrated LEDs or standard DID bulbs. AOR/EOR <br />Provide calculator If pre approved conditions are not met. <br />CM Checklist <br />CM <br />1 <br />Green Educational Program <br />NCACI <br />1 t <br />r <br />Green Education Discs shewn:In the drawings <br />ADR <br />b� <br />tj .�_!. <br />;r <br />l:,t <br />_. '.,..c ;,�Y,.,,il <br />r1,6ty, 7. r <br />Ei- <br />Go towww.usgbc.org/rpc and enter as much of the project's location as <br />srgnatare rs cunjirmatron thatthSSCoremt'd haS been t a r ateit u€t rawrngt su., rcrerit y show the d etai s nee e to 76737 r(r, t ie pursuE urrregrrrs trs and cte Rs. <br />+Dart• <br />CONTRACTOR RESPONSIBILITIES FOR BUILDING COMMISSIONING <br />CONTRACTOR SHALL PROVIDE SUPPORT AND WORKS AS SPECIFIED, NEEDED AND REQUIRED <br />TO CONDUCT AND FACILITATE STARBUCKS STAFF BUILDING COMMISSIONING EFFORTS. THIS <br />WORK WILL BE COMPRISED OF THREE DISTINCT EFFORTS: <br />1) SUPPORT STARBUCKS COMMISSIONING AGENT (CXA) DURING INSTALLATION VERIFICATION <br />AND CORRECT DISCLOSED DEFICIENCIES; 2) PERFORM TESTING, ADJUSTING, BALANCING AND <br />SYSTEM STARTUP AND SUPPORT FUNCTIONAL PERFORMANCE TESTING BY STARBUCKS CXA; 3) <br />CORRECT DEFICIENCIES DISCLOSED BY FUNCTIONAL PERFORMANCE TESTING AND SUBMIT <br />REPORTS. CONTRACTOR SHALL PERFORM AND PROVIDE THE FOLLOWING: <br />A. SYSTEMS SUBJECT TO COMMISSIONING MAY INCLUDE, BUT ARE NOT LIMITED TO, DOMESTIC <br />HOT WATER GENERATION, HVAC SYSTEMS, ROOFTOP UNITS, EXHAUST FANS, HVAC CONTROLS, <br />LIGHTING CONTROLS, AIR CURTAINS, BUILT -INN REFRIGERATION EQUIPMENT, AND RENEWABLE <br />ENERGY SYSTEMS. <br />B. CONTRACTOR SHALL INCLUDE COMMISSIONING ACTIVITIES IN PROJECT SCHEDULE AND <br />SHOW INTERVALS FOR PERFORMANCE OF WORK FOR WHICH CONTRACTOR IS RESPONSIBLE <br />AND INTERVALS FOR WORK PERFORMED BY STARBUCKS CXA. CONTRACTOR SHALL SHOW <br />RESOURCES FOR PERFORMING ALL WORK RELATED TO COMMISSIONING ACTIVITIES ON A LINE <br />ITEM IN THE SCHEDULE OF VALUES. <br />C. CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S <br />REQUIREMENTS AND ALL CONTRACT DOCUMENTS. ENSURE THAT ALL EQUIPMENT IS INSTALLED <br />TOTALLY COMPLETE, AND ACCESSIBLE TO STARBUCKS CXA FOR INSTALLATION VERIFICATION <br />AND FUNCTIONAL PERFORMANCE TESTING PRIOR TO THE SCHEDULED START OF INSTALLATION <br />VERIFICATIONS. <br />D. INSTALLATION VERIFICATION SHALL BE PERFORMED BY STARBUCKS' CXA. CONTRACTOR <br />SHALL SUPPORT STARBUCKS CXA INSTALLATION VERIFICATION EFFORTS AS NECESSARY. <br />PROVIDE ALL ACCESS AND EQUIPMENT NECESSARY FOR STARBUCKS STAFF TO VERIFY THAT <br />THE EQUIPMENT IS INSTALLED CORRECTLY. <br />E. CONTRACTOR SHALL BE READILY AVAILABLE DURING INSTALLATION VERIFICATION TO <br />CORRECT ANY DEFICIENCIES OR DEFECTS DISCLOSED BY THE INSTALLATION VERIFICATION <br />PROCESS. CORRECTIONS SHALL BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION OF THE <br />CONSTRUCTION SCHEDULE. <br />F. ALL HVAC, EXHAUST FAN AND AIR CURTAIN EQUIPMENT SHALL BE TESTED, ADJUSTED AND <br />BALANCED BY THE CONTRACTORS TESTING, ADJUSTING AND BALANCE AGENT (SEE TESTING, <br />ADJUSTING AND BALANCING) AFTER THE SYSTEM IS VERIFIED TO BE COMPLETE AND CORRECT <br />BY STARBUCKS CXA, IN ACCORDANCE WITH THE REQUIREMENTS OF THESE DOCUMENTS. ALL <br />HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES, <br />COMPONENTS, EQUIPMENT AND SYSTEMS ARE CALIBRATED, ADJUSTED AND OPERATE IN <br />ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. SEQUENCES OF OPERATION <br />CALIBRATED, ADJUSTED AND OPERATE IN ACCORDANCE WITH THESE PLANS AND <br />SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE TESTED TO ENSURE THAT THEY <br />OPERATE IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS. DELIVERABLES: <br />PRELIMINARY, WRITTEN TESTING AND AIR BALANCE REPORT CONFORMING TO THE <br />REQUIREMENTS SPECIFIED HEREIN DOCUMENTING THE INFORMATION SPECIFIED, <br />, ETC. TO THE <br />STARBUCKS CXA IMMEDIATELY UPON COMPLETION OF THE WORK. <br />G. CONTRACTOR SHALL INFORM STARBUCKS CXA WHEN EQUIPMENT IS READY FOR <br />FUNCTIONAL PERFORMANCE TESTING. ALL EQUIPMENT SHALL BE READY FOR FUNCTIONAL <br />PERFORMANCE TESTING PRIOR TO STARTING TESTING. CONTRACTOR SHALL OPERATE <br />EQUIPMENT FOR STARBUCKS CXA AND VERIFY BY DEMONSTRATION THE CORRECT OPERATION <br />OF EQUIPMENT, RESPONSE OF SENSORS, AND PROPER EXECUTION OF HVAC CONTROL AND <br />LIGHTING SEQUENCES; INCLUDING BUT NOT LIMITED TO AIR MOVEMENT, TEMPERATURE, <br />SOUND AND CONTROL RESPONSE. PROVIDE ANY SECURITY ACCESS, HARDWARE, SOFTWARE, <br />OR OTHER SUPPORT AS NEEDED FOR THE STARBUCKS CXA TO EFFICIENTLY WITNESS AND <br />DOCUMENT ALL EQUIPMENT TESTING. STARBUCKS CXA WILL RECORD TED EQUIPMENT <br />OPERATION AND RESPONSE TO TESTING SEQUENCES AND PREPARE A LIST OF ANY <br />DEFICIENCIES DISCLOSED BY THE FUNCTIONAL PERFORMANCE TESTS FOR CORRECTION BY <br />THE CONTRACTOR. EQUIPMENT INCLUDES BUT IS NOT LIMITED TO, AIR HANDLING UNITS, <br />ROOFTOP AND SPLIT TYPE, CONDENSING UNITS, EXHAUST FANS, LIGHTING CONTROLS, ETC. <br />DELIVERABLES: PROVIDE COMPLETED COPIES OF ALL START UP REPORTS, FILLED OUT ON THE <br />MANUFACTURERS FORMS, TO THE STARBUCKS CXA. <br />H. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES OR DEFICIENCIES DISCLOSED <br />DURING THE FUNCTIONAL PERFORMANCE TESTING PROCESS. CORRECTIONS SHOULD BE MADE <br />IN A TIMELY MANNER WITHOUT DISRUPTION TO THE SYSTEM AND CONSTRUCTION SCHEDULE. <br />I. CONTRACTOR SHALL BE READILY BE AVAILABLE FOR ANY RE -TESTING OF EQUIPMENT <br />DEEMED NECESSARY BY STARBUCKS CXA DURING INSTALLATION VERIFICATION AND <br />FUNCTIONAL PERFORMANCE TESTING. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY <br />ISSUES OR DEFICIENCIES FOUND IN THE SYSTEM DURING ANY AND ALL RETESTING. <br />CORRECTIONS SHOULD E MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE SYSTEM <br />AND CONSTRUCTION SCHEDULE. DELIVERABLES: FINAL BALANCE REPORT, DEFICIENCIES LIST <br />NOTING CORRECTIVE ACTIONS PERFORMED BY CONTRACTOR IN RESPONSE TO INSTALLATION <br />VERIFICATION AND FUNCTIONAL PERFORMANCE TEST RESULTS. <br />J. CONSTRUCTION AND POST CONSTRUCTION TESTING: ADDITIONAL TESTING MAY BE <br />REQUIRED BY LEED AND OTHER PROCESSES THAT MAY OCCUR OUT OF SEQUENCE WITH <br />COMMISSIONING SERVICE. CONTRACTOR SHALL CONDUCT, DOCUMENT, SUPPORT AND <br />SCHEDULE THIS TESTING AS DIRECTED BY STARBUCKS CXA. <br />STARBUCKS <br />2401 UTAH AVENUE SOUTH <br />SEATTLE, WASHINGTON 98134 <br />(206) 318-1575 <br />THESE DRAWINGS AND SPECIFICATIONS ARE <br />CONFIDENTIAL AND SHALL REMAIN THE SOLE <br />PROPERTY OF STARBUCKS CORPORATION, <br />WHICH IS THE OWNER OF THE COPYRIGHT IN <br />THIS WORK. THEY SHALL NOT BE <br />REPRODUCED (IN WHOLE OR IN PART), SHARED <br />WITH THIRD PARTIES OR USED IN ANY MANNER <br />ON OTHER PROJECTS OR EXTENSIONS TO THIS <br />PROJECT WITHOUT THE PRIOR WRITTEN <br />CONSENT OF STARBUCKS CORPORATION. <br />THESE DRAWINGS AND SPECIFICATIONS ARE <br />INTENDED TO EXPRESS DESIGN INTENT FOR A <br />PROTOTYPICAL STARBUCKS STORE (WHICH IS <br />SUBJECT TO CHANGE AT ANYTIME) AND DO <br />NOT REFLECT ACTUAL SITE CONDITIONS. <br />NEITHER PARTY SHALL HAVE ANY OBLIGATION <br />NOR LIABILITY TO THE OTHER (EXCEPT STATED <br />ABOVE) UNTIL A WRITTEN AGREEMENT IS <br />FULLY EXECUTED BY BOTH PARTIES. <br />STARBUCKS TEMPLATE VERSION 2018.01.26 <br />Design Forum <br />Architects Inc. <br />700 W. Pete Rose Way, Suite 460 Donald J. Rethman <br />Cincinnati, OH 45203 Architect In Charge <br />Tel: (513) 421-2210 License: AR0017303 <br />Design Forum <br />Engineering <br />700 W. Pete Rose Way, Suite 460 Timothy L Raberding, PE <br />Cincinnati, OH 45203 Professional Engineer <br />Tel: 513 421-22 ucense:62078 <br />25 0 2 <br />1 8 <br />A1200iv 03 v <br />I..L <br />Ill <br />n� <br />(D <br />LO <br />D <br />. <br />C`M <br />J <br />Q <br />0 <br />LL <br />0 <br />J <br />m <br />J <br />di <br />Q <br />�( <br />W <br />J <br />J <br />H <br />r <br />O <br />C) <br />H <br />Q <br />0 <br />M <br />w <br />_ <br />a <br />a <br />�N <br />STORE #: <br />56350 <br />PROJECT #: <br />81186-001 <br />ISSUE DATE: <br />06/22/18 <br />DESIGN PROGRAM <br />ROMINA VIGNOLO <br />MANAGER: <br />LEEDO AP: <br />PRODUCTION DESIGNER: <br />MICHAEL.B.SARKA <br />CHECKED BY� <br />M.MCCAUGHEY <br />Revision Schedule <br />Rev Date By Description <br />SHEET TITLE: <br />LEED INFORMATION <br />I SCALE: NO SCALE I <br />SHEET NUMBER: <br />G-005 <br />