Laserfiche WebLink
11. .lf 1"4 Se_I19lf All1 LI. _ ■ I <br />L <br />I <br />MECHANICAL SPECIFICATIONS <br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A PROPOSAL. <br />ALL WORK SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING CODES SIXTH EDITION (2017), WITH ALL AMENDMENTS, AND LOCAL CODES AND <br />ORDINANCES. THE SYSTEMS, EQUIPMENT, DEVICES AND ACCESSORIES SHALL BE INSTALLED, FINISHED, TESTED AND ADJUSTED FOR CONTINUOUS AND <br />PROPER OPERATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK FITTING IN PLACE AND SHALL COORDINATE WITH OTHER TRADES TO <br />AVOID INTERFERENCE WITH THEIR WORK. THE INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED, BUT ITS <br />EXTREME ACCURACY IS NOT GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL ARRANGEMENT, CAPACITY AND LOCATION OF <br />VARIOUS COMPONENTS, EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE IT IMPOSSIBLE TO PRODUCE FIRST CLASS WORK, OR <br />SHOULD DISCREPANCIES APPEAR AMOUNG THE CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT DOCUMENTS AND THE MANUFACTURER'S <br />RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST INTERPRETATION BEFORE PROCEDING WITH WORK. CONTRACTOR SHALL FURNISH AND INSTALL ALL <br />MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE THE INSTALLATION WHETHER OR NOT SPECIFIED IN THE DOCUMENTS. <br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING DIVIDED DUCTS) <br />AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. <br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED. <br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, ADJUSTING OR <br />MAINTENANCE SHALL BE LOCATED TO ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSMBLIES, IF REQUIRED. CONTRACTOR SHALL <br />PROVIDE ACCESS PANELS WHERE REQUIRED TO ALLOW ACCESS, EVEN IF NOT INDICATED ON THE DRAWINGS AT NO ADDITIONAL COST TO OWNER. <br />WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO RESIST WIND LOADS AS <br />DETAILED IN THE BUILDING CODE. <br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS, CEILINGS OR WALLS SHALL <br />BE SEALED AIRTIGHT WITH MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, CEILING OR FLOOR PENETRATED. <br />EQUIPMENT TAGS: ALL EQUIPMENT WILL HAVE A PERMANENTLY FIXED ENGRAVE PHENOLIC LABEL CORRESPONDING TO THE EQUIPMENT TAG ON THE <br />ENGINEER'S DRAWINGS. <br />FIRES PPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS OR <br />FLOORS. THE RATING OF THE FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL INSULATION SHALL HAVE COMPOSITE FIRE AND <br />SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM E-84, NFPA-225, UL-723 NOT EXCEEDING: <br />FLAME SPREAD 25 <br />SMOKE DEVELOPED 50 <br />FUEL DISTRIBUTED 50 <br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE. <br />START-UP: CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES. <br />OPERATING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS AND SPARE PARTS LIST <br />FOR EACH PIECE OF EQUIPMENT. <br />CONDENSATE DRAIN PIPING: CONDENSATE DRAIN PIPING SHALL BE PVC TYPE DWV. DRAINS SHALL BE PITCHED NOT LESS THAN 1" IN 10'. RUNS <br />SHALL BE AS SHORT AS POSSIBLE WITHOUT ANY DIPS TO TRAP WATER AND INTERFERE WITH PROPER DRAINAGE. PROVIDE TRAPS AND CLEANOUTS AT <br />DRAIN PAN CONNECTIONS. RUN CONDENSATE DRAIN PER PLANS. <br />DIMENSIONAL DATA: ALL DUCTWORK DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. <br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND <br />MATERIALS, IN ORDER TO PROVIDE A "VIBRATION -FREE" RIGID INSTALLATION. <br />DUCTWORK - GENERAL: FABRICATE AND INSTALL ALL DUCTWORK AND DUCT ACCESSORIES IN ACCORDANCE WITH THE LATEST EDITION OF SMACNA'S <br />HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE, THE LATEST NFPA STANDARDS, AND THIS SPECIFICATION. THE MOST STRINGENT OF THESE <br />SHALL BE THE MINIMUM STANDARD. MINIMUM OF 1" PRESSURE CLASS RATING FOR ALL FIBERGLASS DUCTWORK AND 2" FOR ALL SHEET METAL. <br />ALL NEW RIGID DUCTWORK SHALL BE GALVANIZED SHEET METAL STEEL OF LOCKFORMING GRADE CONFORMING TO ASTM A653 AND ASTM A924. G-60 <br />ZINC COATING. <br />DUCTWORK INSTALLATION: ALL INTERIOR DUCTWORK SHALL BE SEALED TO SMACNA CLASS (C) REQUIREMENTS. PROVIDE DOUBLE THICKNESS TURNING <br />VANES IN ALL NINETY (90) DEGREE SQUARE ELBOWS. CONTRACTOR SHALL FURNISH AND INSTALL ALL DUCT OFFSETS AS REQUIRED TO CLEAR <br />INTERFERENCES WITH EXISTING BUILDING STRUCTURE, PIPES AND ELECTRICAL CONDUITS. FURNISH AND INSTALL ALL MISCELLANEOUS STEEL SUPPORTS <br />REQUIRED FOR HANGING AND SUPPORTING DUCTWORK UNLESS OTHERWISE NOTED. <br />INSULATION: ASSURE ALL DUCTWORK IS SEALED PRIOR TO INSTALLING INSULATION. <br />ALL SHEET METAL SUPPLY & RETURN DUCTWORK SHALL BE WRAPPED WITH 2" THICK FIBERGLASS BLANKET INSULATION WITH FSK (ASJ) FACING, <br />MINIMUM INSTALLED R VALUE OF 6.0, AND FLAME SPREAD/SMOKE DEVELOPED RATINGS OF 25/50 BY ASTM E-84. <br />INSTALL INSULATION ON DUCTWORK USING ADHESIVE AND/OR WELD PINS WITH WASHERS. <br />SEAL ALL INSULATION JOINTS, SEAMS AND FASTENER PIN PENETRATIONS WITH VAPOR RETARDING PRESSURE SENSITIVE TAPE OR WITH GLASS FABRIC AND <br />MASTIC. <br />SMOKE DETECTORS: INSTALL SMOKE DETECTORS AS RECOMMENDED BY MANUFACTURER TO ACQUIRE PROPER READINGS. LOCATION OF DUCT MOUNTED <br />SMOKE DETECTORS ARE FOR REFERENCE LOCATION ONLY. FINAL PLACEMENT SHALL MEET ALL REQUIREMENTS IN THE MANUFACTURER'S INSTALLATION <br />INSTRUCTIONS. PROVIDE 12"X12" ACCESS DOOR FOR INSPECTION AND SERVICE. SMOKE DETECTORS SHALL BE FURNISHED & WIRED BY <br />ELECTRICIAN/FIRE ALARM CONTRACTOR AND INSTALLED BY MECHANICAL CONTRACTOR. WIRE SMOKE DETECTORS TO SHUTOFF UNIT WITH THE DETECTION <br />OF SMOKE. <br />CONTROLS: PROVIDE CONTROLS COMPLETE TO SUIT THE EQUIPMENT PROVIDED AND TO ACCOMPLISH THE SEQUENCE OF OPERATION AS REQUIRED BY <br />PLANS AND SYSTEMS. LOCATE THERMOSTATS 48" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. THERMOSTATIC CONTROLS SHALL BE <br />PROGRAMMABLE TO INCLUDE ALL ITEMS REQUIRED BY 2014 FBC-ENERGY CODE. <br />TESTING AND BALANCING: THE CONTRACTOR SHALL ENSURE THAT ALL DEVICES AND SYSTEMS ARE COMPLETE, TESTED AND BALANCED, AND READY FOR <br />OPERATION WHEN THE FACILITY IS HANDED OVER THE OWNER. THE AIR CONDITIONING SYSTEM SHALL BE TESTED IN ACCORDANCE WITH AABC OR NEBB <br />PROCEDURES. WRITTEN REPORT SHALL BE SUBMITTED TO MECHANICAL ENGINEER FOR APPROVAL. <br />SUBMITTALS REQUIRED: <br />SUBMIT SHOP DRAWINGS FOR ALL MATERIALS, EQUIPMENT, AND SYSTEMS REQUIRED BY THESE DOCUMENTS (SEE ARCH. PLANS/SPECS FOR SPECIFIC <br />FORMATTING), INCLUDING: <br />ROOFTOP UNITS <br />EXHAUST FANS <br />ROOF A/C STANDS <br />DUCTWORK & SHEET METAL ACCESSORIES (CONNECTIONS, MASTICS, ETC.) <br />THERMOSTATS & CONTROLS <br />SUBSTITUTIONS : RTU'S MUST BE MANUFACTURED BY TRANE - NO EXCEPTIONSI FOR ALL OTHER EQUIPMENT, CONTRACTOR SHALL PAY FOR ANY AND <br />ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING SUBSTITUTIONS THAT REQUIRE CHANGES TO THE OTHER BUILDING COMPONENTS, <br />SUCH AS ELECTRICAL, STRUCTURAL REINFORCING, CEILINGS, WALLS, ROOFS, ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL RE -DESIGN <br />COSTS AS A RESULT OF SAID SUBSTITUTION. THESE COSTS SHALL NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF <br />ACCEPTABILITY OF SUBSTITUTION. ENGINEER RESERVES THE RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT DEEM TO BE <br />EQUIVALENT, AND CONTRACTOR SHALL PROVIDE SPECIFIED OR EQUIVALENT MATERIALS/EQUIPMENT AT NO ADDITION COST TO OWNER, SHOULD A <br />SUBSTITUTION BE DENIED. <br />GUARANTEE@ THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE CONTRACTOR HAS RECEIVED <br />THE FINAL PAYMENT. ALL NEW EQUIPMENT AND ALL WORK SHALL BE FULLY GUARANTEED, PARTS AND LABOR, FROM DEFECTS IN MATERIAL AND <br />WORKMANSHIP FOR ONE YEAR FROM THE DATE OF THE FINAL PAYMENT, AT NO ADDITIONAL COST TO OWNER. REPAIRS MADE DURING THIS PERIOD <br />MUST BE FULLY GUARANTEED FROM DEFECTS IN MATERIAL AND WORKMANSHIP AT NO EXPENSE TO THE OWNER, FOR AN ADDITIONAL ONE YEAR PERIOD <br />FROM THE DATE OF REPAIRSAT NO ADDITIOAL COST TO OWNER. IN ADDITION, THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE <br />TO THE BUILDING, AND ITS CONTENTS OR OTHER EQUIPMENT, CAUSED BY DEFECTS OR IMPROPER INSTALLATION OF EQUIPMENT OR MATERIAL INSTALLED. <br />ALL NEW HVAC UNITS SHALL INCLUDE 5-YEAR WARRANTY ON COMPRESSORS AND 1-YEAR WARRANTY ON ALL OTHER PARTS AND LABOR FOR UNIT. <br />HVAC LEGEND <br />NEW DUCTWORK, WITH SIZE LISTED <br />DUCT SMOKE DETECTOR <br />THERMOSTAT BASE <br />�H <br />HUMIDITY SENSOR <br />BTU/H <br />BRITISH THERMAL UNITS / HOUR <br />0 <br />ROUND, DIAMETER <br />CD <br />CONDENSATE DRAIN PIPING <br />CFM <br />CUBIC FEET PER MINUTE <br />TYP <br />TYPICAL - ITEM OR METHOD <br />(�S <br />REMOTE SENSOR <br />® <br />SUPPLY AIR DIFFUSER OR GRILLE <br />RETURN/EXH. AIR REGISTER OR GRILLE <br />FLEXIBLE DUCT <br />--� <br />AIRFLOW DIRECTION <br />AFF <br />ABOVE FINISHED FLOOR <br />ROUND DUC T TAKE -OFF WITH VOLUME DAMPER <br />VD / L_ <br />MANUAL VOLUME DAMPER (W/HANDLE) <br />DIFFUSER TAG EQUIPMENT TAG <br />AIRFLOW EQUIPMENT <br />400 CFM R IU�TYPE <br />CD-12"0 � EQUIPMENT <br />MARK-/ SIZE NUMBER <br />KEY NOTES ON PLANS: <br />O1 PACKAGED ROOFTOP A/C UNIT - COORDINATE FINAL LOCATION WITH G.C. <br />O2 NEW ROOF MOUNTED EXHAUST FAN. <br />O 3 PROVIDE 4-FT LONG FULL SIZE (MIN. 12"X12") DUCT DROP DOWN BELOW ROOF. <br />® COORDINATE UNIT INSTALLATION REQUIREMENTS WITH G.C. AND STRUCTURAL PLANS AND <br />DETAILS. <br />O5 INSTALL THERMOSTAT / HUMIDITY SENSOR TEMPORARILY ON WALL WITH 75-FT EXTRA WIRING <br />COILED AT UNIT (TYPICAL) <br />© ROUTE CONDENSATE PIPING ON PIPE SUPORTS AT 4-FT INTERVALS. <br />7O INSTALL DUCT SMOKE DETECTOR IN SUPPLY DUCT DROP (TYPICAL-2 RTU'S) <br />® MECHANICAL CONTRACTOR SHALL FURNISH AND G.C. TO INSTALL NEW ROOF STAND FOR <br />FUTURE TENANT ICE MACHINE CONDENSER. <br />® OUTSIDE AIR INTAKE ON THIS END OF RTU - COORDINATE INSTALL TO ENSURE MIN. 10-FT <br />CLEAR FROM EXHAUST FAN AND PLUMBING VENT STACKS. <br />10 PROVIDE 4-FT LONG FULL-SIZE DUCT DROPS INTO CEILING CAVITY WITH ENDS CAPPED FOR <br />FUTURE. <br />11 12"X12" PIPE CURB FOR FUTURE ICE MACHINE CONDENSER. <br />Q SPILL CONDENSATE MANIFOLD THROUGH SCUPPER AND INTO DOWNSPOUT (TYPICAL ON ROOF) <br />13 PERMANENT LADDER ON WALL FOR ROOF ACCESS WITH OPENING IN PARAPET. <br />MECHANICAL ROOF PLAN <br />4STEPANEK- LEWIS <br />AND ASSOCIATES <br />2237 TWELVE OAKS WAY, SUITE 103 <br />WESLEY CHAPEL, FL 33344 <br />)PH (813) 991-1248 <br />MATTHEW D. LEWIS, P.E. FL L.IC#56189 <br />N0M- FINAL UNIT SIZING, SPECS, <br />AND LOCATIONS MUST BE APPROVED <br />BY TENANT AND LANDLORD'S <br />ENGINEER PRIOR TO BID. <br />