Laserfiche WebLink
PLUMBING SPECIFICATIONS <br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A PROPOSAL. ALL <br />WORK SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING CODES SIXTH EDITION (2017), WITH AMENDMENTS, AND LOCAL <br />CODES AND ORDINANCES. INSTALLATION SHALL COMPLY WITH THE CODE REFERENCED STANDARDS SET BY NFPA, ASHRAE, ASPE, SMACNA, <br />NEC AND UL. THE SYSTEMS, EQUIPMENT, DEVICES AND ACCESSORIES SHALL BE INSTALLED, FINISHED, TESTED AND ADJUSTED FOR <br />CONTINUOUS AND PROPER OPERATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK FITTING IN PLACE AND SHALL COORDINATE <br />WITH OTHER TRADES TO AVOID INTERFERENCE WITH THEIR WORK. THE INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS <br />COULD BE SECURED, BUT ITS EXTREME ACCURACY IS NOT GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL <br />ARRANGEMENT, CAPACITY AND LOCATION OF VARIOUS COMPONENTS, EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE <br />IT IMPOSSIBLE TO PRODUCE FIRST CLASS WORK, OR SHOULD DISCREPANCIES APPEAR AMOUNG THE CONTRACT DOCUMENTS, OR BETWEEN THE <br />CONTRACT DOCUMENTS AND THE MANUFACTURER'S RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST INTERPRETATION BEFORE PROCEDNG <br />WITH WORK. CONTRACTOR SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE <br />THE INSTALLATION WHETHER OR NOT SPECIFIED IN THE DOCUMENTS. <br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING <br />DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. <br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED. <br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, ADJUSTING OR <br />MAINTENANCE SHALL BE LOCATED TO ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSMBLIES, IF REQUIRED. CONTRACTOR <br />SHALL PROVIDE ACCESS PANELS WHERE REQUIRED TO ALLOW ACCESS, EVEN IF NOT INDICATED ON THE DRAWINGS AT NO ADDITIONAL COST TO <br />OWNER. <br />WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO RESIST WIND <br />LOADS AS DETAILED IN THE BUILDING CODE. <br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS, CEILINGS OR WALLS <br />SHALL BE SEALED AIRTIGHT WITH MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, CEILING OR FLOOR PENETRATED. <br />EQUIPMENT TAGS: ALL. EQUIPMENT WILL HAVE A PERMANENTLY FIXED TAG CORRESPONDING TO THE EQUIPMENT TAG ON THE ENGINEER'S <br />DRAWINGS. <br />FIRESTOPPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS <br />OR FLOORS. THE RATING OF THE FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL INSULATION SHALL HAVE <br />COMPOSITE FIRE AND SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM E-84, NFPA-225, UL-723 NOT EXCEEDING: <br />FLAME SPREAD 25 SMOKE DEVELOPED 50 FUEL DISTRIBUTED 50 <br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE. <br />SERVICE AND PERMITS: CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH UTILITY COMPANIES FOR SERVICE AND CONNECTIONS AND SHALL <br />PAY FOR PERMITS. <br />SHOP DRAWINGS: EACH TRADE SHALL PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH PROCEDURES OUTLINED IN DIVISION 1. <br />RESPONSIBILITY FOR ERRORS OR OMISSIONS IN THE SUBMITTALS SHALL NOT BE RELIEVED BY THE ARCHITECT'S OR ENGINEER'S REVIEW. <br />ENGINEER'S PROCESSING WILL NOT CONSTITUTE A COMPLETE CHECK BUT WILL INDICATE ONLY THAT A GENERAL METHOD OF CONSTRUCTION <br />AND DETAILING IS SATISFACTORY. AT A MINIMUM SUBMITTALS SHALL INCLUDE FIXTURES, VALVES, PIPING, INSULATION AND ACCESSORIES. <br />START-UP CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES. <br />OPEMJING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS AND SPARE <br />PARTS UST FOR EACH PIECE OF EQUIPMENT. <br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND <br />MATERIALS, IN ORDER TO PROVIDE A "VIBRATION -FREE" RIGID INSTALLATION. <br />DIELECTRIC UNIONS: PROVIDE DIELECTRIC UNIONS OR FLANGES AT CONNECTIONS OR CONTACT BETWEEN PIPES OF DISSIMILAR METALS. <br />WATER PIPING: INSIDE WATER LINES SHALL BE HARD -DRAWN COPPER TUBING, TYPE "L" ABOVE -GROUND, TYPE "K" BELOW -GROUND. <br />PROVIDE DIELECTRIC UNIONS WHERE DISSIMILAR METAL ARE IN CONTACT. ALL BURIED PIPING SHALL BE PROTECTED FROM CORROSION WITH <br />3/8" THICK FOAM RUBBER INSULATION WITH SEAMS SEALED WATERTIGHT. WATER PIPING SHALL BE TYPE-L COPPER TUBING, WITH WROUGHT <br />COPPER FITTINGS (ASTM-1388). CONTRACTOR SHALL PROVIDE FOR EXPANSION AND CONTRACTION OF TUBING. TUBING SHALL BE SLEEVED AT <br />PENETRATION OF CONCRETE SLABS OR WALLS. <br />EXPOSED PIPING: EXPOSED PIPING SHALL BE POLISHED CHROMIUM ON EITHER BRASS OR BRONZE. PROVIDE ADA INSULATED WATER AND <br />WASTE LINE COVERINGS FOR WALL HUNG SINKS AND LAVATORIES. <br />VALVES ALL VALVES SHALL HAVE A MINIMUM OF 125 PSIG WORKING PRESSURE. VALVES AND COCKS MAY NOT BE INDICATED IN EVERY <br />INSTANCE ON THE DRAWINGS, BUT WHETHER OR NOT SHOWN, ALL VALVES, COCKS AND CHECK VALVES NECESSARY FOR THE PROPER <br />OPERATION OF THE SYSTEM SHALL BE FURNISHED AND INSTALLED. INSTALL ISOLATION/SHUT-OFF VALVES AT ALL MAIN RISERS, AND MAIN <br />BRANCH TAKEOFFS. INSTALL ISOLATION/SHUT-OFF VALVES ON EACH INLET AND OUTLET OF EACH PIECE OF EQUIPMENT. PROVIDE A FLANGE <br />OR UNION BETWEEN THE VALVE AND THE EQUIPMENT TO PERMIT DISCONNECTION, REMOVAL AND SERVICE. <br />TERILIIZATION OF DOMESTIC WATER SYSTEM: THE ENTIRE DOMESTIC WATER DISTRIBUTION SYSTEM SHALL BE THOROUGHLY STERILIZED AS <br />REQUIRED BY THE HEALTH AUTHORITY OR WATER PURVEYOR HAVING JURISDICTION, OR IN THE ABSENCE OF A PRESCRIBED METHOD, THE <br />PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652, OR AS DESCRIBED IN SECTION 610 FBC-P (2017). <br />YENTING: THE STACKS SHALL BE EXTENDED THROUGH ROOF OF BUILDING TO POINTS NOT LESS THAN 12" ABOVE ROOF. VENTS SHALL BE <br />OFFSET AS REQUIRED TO PENETRATE ROOFS AT LEAST 3 FEET FROM THE RIDGE OR EDGE OF BUILDING AND 10 FEET FROM ANY FRESH AIR <br />INTAKE OR OPERABLE WINDOW OR DOOR. <br />SANITARY, WASTE, GREASEā€ž STORM AND VENT PIPING: ALL BELOW AND ABOVE GROUND PIPING AND FITTINGS SHALL BE SCHEDULE 40 <br />PVC-DWV. (SOLID CORE) SLOPE OF SANITARY OR DRAINAGE PIPING 2-1/2" AND SMALLER SHALL BE A MINIMUM OF 1/4" PER FOOT; PIPING <br />3" AND LARGER SHALL BE SLOPED A MINIMUM OF 1/8" PER FOOT. CLEANOUTS WILL BE LOCATED NOT MORE THAN 100 FEET APART AND AT <br />EACH CHANGE OF DIRECTION GREATER THAN 45' ALONG THE HORIZONTAL DRAIN. CLEANOUTS SHALL BE INSTALLED AT BASE OF EACH STACK. <br />CONCEALED CLEANOUTS SHALL HAVE CAST BRASS CHROMIUM PLATED FLAT ACCESS COVER PLATE. <br />PLUMBING_ FIXTURES AND TRIM: PLUMBING FIXTURES SHALL BE FURNISHED AND INSTALLED IN A NEAT AND WORKMANLIKE MANNER WITH <br />PROPER CONNECTIONS TO SUPPLY AND DRAINAGE PIPING. ALL FIXTURES SHALL BE FREE OF FLAWS AND DEFECTS OF ANY SORT IN MATERIAL <br />AND WORKMANSHIP AND SHALL OPERATE PERFECTLY WHEN INSTALLED IN ACCORDANCE WITH MANUFACTURER'S DIRECTIONS. CONTRACTOR <br />SHALL PROVIDE ROUGH -IN, AND SHALL CONNECT ALL FIXTURES TO THE PLUMBING SYSTEMS. ALL FIXTURES TO BE PROVIDED WITH <br />CHROME -PLATED SUPPLIES AND STOPS. PROVIDE 17 GAUGE CHROME -PLATED BRASS TRAPS FOR ALL FIXTURES WITHOUT INTEGRAL TRAPS. <br />PROVIDE CONCEALED ARM CARRIERS AND SUPPORTS FOR ALL FIXTURES REQUIRING SAME. <br />TEUNG: TEST ALL WASTE AND VENT PIPING FOR A PERIOD OF NOT LESS THAN 8 HOURS BY CAPPING OR PLUGGING. ALL JOINTS TO A <br />LEVEL OF THE HIGHEST FIXTURE OR FITTINGS. FILLING THE SYSTEM WITH WATER, AND OBSERVING FOR LEAKS. TEST WATER PIPING AT 100 <br />PSIG FOR A PERIOD OF 8 HOURS, OBSERVING FOR ANY VISIBLE LEAKS. TEST PIPING AGAIN WITH FIXTURES INSTALLED. REPAIR ANY LEAKS <br />FOUND BY REMAKING JOINT. DO NOT USE CAULKING OR SIMILAR METHODS TO CORRECT LEAKS. UPON REPAIRING ANY LEAKS FOUND. AGAIN <br />TEST THAT PORTION OF THE SYSTEM AS DESCRIBED ABOVE. <br />EQUIPMENT FURNISHED BY OTHERS: WHERE SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL MAKE ALL PIPING CONNECTIONS TO <br />EQUIPMENT FURNISHED BY OTHERS. THIS WORK SHALL INCLUDE FURNISHING AND INSTALLATION OF ALL WATER AND DRAIN PIPING. ALL WORK <br />SHALL BE PERFORMED IN ACCORDANCE WITH RECOMMENDATIONS OF EQUIPMENT MANUFACTURER. <br />GUARANTEE: THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE CONTRACTOR HAS <br />RECEIVED THE FINAL PAYMENT AND CERTIFICATION OF COMPLETION. ALL EQUIPMENT AND ALL WORK SHALL BE FULLY GUARANTEED, PARTS AND <br />LABOR, FOR ONE YEAR FROM THE DATE OF THE CERTIFICATE OF COMPLETION. REPAIRS MADE DURING THIS PEROID MUST BE FULLY <br />GUARANTEED FOR AN ADDITIONAL ONE YEAR PERIOD FROM THE DATE OF REPAIRS. IN ADDITION, THE CONTRACTOR SHALL ASSUME FULL <br />RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, AND ITS CONTENTS OR OTHER EQUIPMENT, CAUSED BY DEFECTS OR IMPROPER <br />INSTALLATION OF EQUIPMENT OR MATERIAL INSTALLED. <br />SUBSTITUTIONS: CONTRACTOR SHALL PAY FOR ANY AND ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING SUBSTITUTIONS <br />THAT REQUIRE CHANGES TO THE OTHER BUILDING COMPONENTS, SUCH AS ELECTRICAL, STRUCTURAL REINFORCING, CEILINGS, WALLS, ROOFS, <br />ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL RE -DESIGN COSTS AS A RESULT OF SAID SUBSTITUTION. THESE COSTS SHALL <br />NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF ACCEPTABILITY OF SUBSTITUTION. ENGINEER RESERVES THE <br />RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT DEEM TO BE EQUIVALENT, AND CONTRACTOR SHALL PROVIDE SPECIFIED OR <br />EQUIVALENT MATERIALS/EQUIPMENT AT NO ADDITIONAL COST TO OWNER, SHOULD A SUBSTITUTION BE DENIED. <br />KEY NOTES ON PLAN: <br />04"GREASE WITH CLEANOUT 5-FT INSIDE REAR WALL LABELED "GREASE" <br />(PROVIDE MAXIMUM DEPTH INVERT - APPROX. 19" BFF AVAILABLE). <br />2O 4-SANITARY WITH CLEANOUT 5-FT INSIDE REAR WALL (MIN 27" BFF). <br />® 1-1/2""CW TO BUILDING, PROVIDE BALL VALVE AT 24"AFF, THEN ROUTE UP <br />INSIDE BUILDING TIGHT TO WALL & UP WITHIN JOISTS. OFFSET UNDERGROUND <br />WATER ENTRY TO CORNER OF BUILDING AS SHOWN & AVOID ELECTRICAL GEAR. <br />0 EXTEND 1-1/2-CW THROUGH JOISTS TO BOOSTER PUMP # BP-1. <br />O HANG BOOSTER PUMP TIGHT BELOW JOISTS. <br />® EXTEND 1-1/2" CW FROM BP-1 TO VALVED CAP IN JOISTS. <br />42> ROUTE 3/4"CW PIPING BEFORE BP-1, WITHIN JOISTS TO EACH HOSE BIBB. <br />® 3"VTR ON ROOF FOR FUTURE TENANT CONNECTION. (LOCATE 10-FT FROM ALL <br />FRESH AIR INTAKES) <br />® SEE CIVIL FOR CONTINUATION 5-FT FROM BUILDING. <br />1 q REFER TO CIVIL PLANS FOR 5/8"CW TO AND HOSE BIBB AT DUMPSTER <br />ENCLOSURE. <br />11 1,250-GALLON GREASE INTERCEPTOR PER CITY OF ZEPHYRHILLS STANDARD <br />DETAILS 5-15. <br />Q ROUTE 2"VENT UNDERGROUND TO BUILDING, THEN ROUTE UP TIGHT TO WALL <br />AND CONNECT TO 3"VTR WITHIN JOISTS. <br />NOTE ON SITE UTILITIES: <br />CONTRACTOR SHALL FIELD VERIFY LOCATIONS & INVERTS <br />OF ALL UTILITY MAINS (I.E. SEWER, DOMESTIC WATER, ETC.) <br />PRIOR TO ANY INSTALLATION OR CONSTRUCTION. ADVISE <br />ENGINEER OF ANY DISCREPANCIES BEFORE PROCEEDING <br />ANY FURTHER. <br />NOTE: PLEASE REFER TO CIVIL ENGINEER'S UTILITY PLANS FOR <br />FURTHER REFERENCE AND CONTINUATIONS BEYOND 5-FT FROM <br />BUILDING. FIELD COORDINATE WITH SITE CONTRACTOR PRIOR <br />TO ANY INSTALLATION OF UNDERGROUND PIPING. <br />DQWSM WATER PRESSURE REMM ENTS: <br />THE DOMESTIC WATER SERVICE SHALL BE A MINIMUM OF 50 PSI <br />AND NO GREATER THAN 65 PSI DYNAMIC PRESSURE AT THE <br />POINT OF BUILDING ENTRY. IF THE SERICE STATIC IS OVER 65 <br />PSI, A PRESSURE REDUCING VALVE TO BE PROVIDED BY THE <br />SHELL GENERAL CONTRACTOR. IF THE PRESSURE IS UNDER 50 <br />PSI AT THE POINT OF ENTRY, A BOOSTER PUMP AND SURGE <br />TANK SHALL BE PROVIDED AND INSTALLED. <br />IMMEDIATELY UPON INSTALLATION OF THE WATER SERVICE TO <br />THE BUILDING, THE PLUMBING CONTRACTOR SHALL PERFORM A <br />PRESSURE TEST. SHOULD THE PRESSURES NOT MEET THE <br />ABOVE STATED CRITERIA, THE GENERAL CONTRACTOR SHALL <br />PROVIDE RESULTS TO THE ARCHITECT AT THE EARLIEST <br />POSSIBLE DATE. THE ARCHITECT WILL THEN PROVIDE THE <br />NECESSARY DESIGN REMEDIES TO THE CONTRACTOR FOR <br />PRICING, PERMIT AND CONSTRUCTION. <br />PLUMBING FLOOR PLAN <br />STEPANEK- LEWIS <br />AND ASSOCIATES <br />2257 TWELVE OAKS WAY, SUITE 103 <br />WESLEY CHAPEL. FL 335" <br />PH (513) 991-1245 <br />CERT. AUTH. # 8397 18-041 <br />MATTHEW D. LEWIS, P.E. FL LIC#56189 <br />PLUMBING LEGEND <br />DESCRIPTION <br />ABBREV. <br />SYMBOL <br />SANITARY PIPING <br />SAN <br />GREASE PIPING <br />GR <br />GR <br />VENT PIPING <br />V <br />----------- <br />DOMESTIC COLD WATER <br />CW <br />- - - - <br />DOMESTIC HOT WATER <br />HW <br />- - <br />BALL/ISOLATION VALVE <br />BV <br />--- <br />DUAL -CHECK BACKFLOW <br />N <br />PREVENTER <br />GRADE CLEAN OUT <br />COTG <br />COTG® <br />FLOOR CLEAN OUT <br />FCO <br />FCO 0------- <br />PIPE TURNING UP <br />0---- - <br />PIPE TURNING DOWN <br />C - <br />CAPPED PIPING <br />E- - <br />BELOW FINISHED FLOOR <br />BFF <br />TYPICAL ITEM <br />TYP <br />NOTE ON ROOF DRAINAGE: <br />ALL ROOF DRAINAGE DESIGNED BY ARCHITECT. REFER <br />TO ARCHITECTURAL PLANS FOR SIZES, QUANTITIES AND <br />LOCATIONS OF GUTTERS, ROOF DRAINS, SCUPPERS, <br />DOWNSPOUTS, ETC. <br />40 <br />