Laserfiche WebLink
1 -1 <br />".,,. _ _ _ I ___ __ _ ___ _ _ _ __ _ __ _ _ _ _ _ _ _ __ _ <br />1 1 2 1 3 I 4 1 5 <br />X <br />C <br />2. <br />A <br />2 <br />a. <br />PE IFICATI S <br />FIRE PROTECTION LEGENDGENERAL <br />FIRECRITERIA <br />S <br />NOTES <br />210100 -AUTOMATIC SPRINKLERS SYSTEMS <br />SYMBOL <br />DESCRIPTION <br />THESE DRAWINGS ARE COMPLETE SPRINKLER DESIGN DRAWINGS FOR REVIEW BY AHCA FOR <br />1. FIRE PROTECTION SYSTEM TO COMPLY WITH NFPA 13 AND ALL APPLICABLE STATE CODES. <br />STAGE III CONSTRUCTION DOCUMENTS, THE LAYOUT OF THE PIPING SYSTEM COMPLETED BY <br />100- GENERAL PROVISIONS <br />0(9 OR Q(K <br />- CONTROL VALVE w/TAMPER SWITCH <br />TLC, AND ARE IN COMPLIANCE WITH FLORIDA STATUTE 61G15-32.003 AND-32.004. <br />2. FINAL INSPECTION AND APPROVAL BY LOCAL FIRE MARSHAL AND ARCHITECT/ENGINEER. <br />1.1 PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT FOR A COMPLETE AND PROPERLY <br />D4 <br />- U/G GATE VALVE <br />ENTIRE BUILDING (EXCEPT AS NOTED) <br />3. SPRINKLER SHOP DRAWINGS AND MATERIAL SUBMITTALS SHALL BE SUBMITTED TO THE <br />OPERATING FIRE PROTECTION SYSTEM. <br />a <br />- FIRE VALVE CABINET <br />OCCUPANCY CLASSIFICATION: LIGHT HAZARD <br />ARCHITECT/ENGINEER AND STATE FIRE MARSHAL AND SHALL BE APPROVED PRIOR TO ANY <br />SYSTEM TYPE: WET PIPE <br />INSTALLATION. <br />1.2 CODES AND STANDARDS: THE FIRE SPRINKLER PROTECTION SYSTEMS INSTALLATION, <br />- NEW SPRINKLER PIPING <br />DESIGN DENSITY: .10 GPM/SQ. FT. <br />FLUSHING AND TESTING SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 13, AND 24 AND <br />HYDRAULIC REMOTE AREA: 1,500 SQ. FT. <br />4. PIPE ROUTING SHOWN IS SCHEMATIC ONLY. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO <br />ALL LOCAL CODES HAVING JURISDICTION. <br />________ <br />- EXISTING SPRINKLER PIPING <br />SPRINKLER ORIFICE SIZE: 1/2" <br />PROVIDE ANY ADDITIONAL OFFSETS REQUIRED FOR PROPER INSTALLATION AND COORDINATION <br />DURATION OF SUPPLY: 30 MIN. <br />WITH OTHER TRADES. <br />1.3 PIPE THREAD PATTERN: ALL THREADS SHALL BE IN ACCORDANCE WITH LOCAL FIRE <br />MAXIMUM COVERAGE/SPRINKLER HEAD: 225 SQ. FT. <br />DEPARTMENT SPECIFICATIONS AND NFPA 1963, 1998 REVISION. <br />----- -- <br />DEMOLISHED SPRINKLER PIPING <br />HOSE STREAM ALLOWANCE: 100 GPM <br />5. PIPING IN AREAS WITH EXPOSED STRUCTURE SHALL BE INSTALLED AS HIGH AS POSSIBLE TO <br />21/2" <br />ALLOW THE OWNER MAXIMUM USE OF THE SPACE. <br />1.4 UUFM APPROVAL: ALL EQUIPMENT, VALVES, COUPLINGS, HANGERS AND DEVICES SHALL BE <br />-PIPE SIZE <br />UNLESS OTHERWISE NOTED ALL STORAGE, SHELLSPACES. MECHANICAL AND ELEGIR&AL ROOMS: <br />APPROVED BY UNDERWRITERS' LABORATORY (UL) OR FACTORY MUTUAL (FM) FOR USE IN FIRE <br />6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING DESCRIPTIONS AND HEIGHTS. <br />PROTECTION SERVICE. <br />21/2" <br />OCCUPANCY CLASSIFICATION: ORDINARY HAZARD GROUP I <br />1.5 LICENSURE: THE FIRE PROTECTION SYSTEMS SHALL BE INSTALLED BY A STATE OF FLORIDA <br />3-0 <br />- PIPE SIZE AND LENGTH <br />SYSTEM TYPE: WET PIPE <br />DESIGN DENSITY: .15 GPM/SQ. FT. <br />7. SPRINKLERS ARE TO BE COORDINATED WITH ALL DIFFUSERS, SPEAKERS, LIGHTING FIXTURES AND <br />CEILING SYSTEMS. SPACING OF SPRINKLERS SHALL BE IN ACCORDANCE WITH NFPA 13 AND THE <br />CERTIFIED FIRE PROTECTION CONTRACTOR. <br />HYDRAULIC REMOTE AREA: 1,500 SQ. FT. <br />LISTING OF THE SPRINKLER. <br />1.6 ALL FIRE PROTECTION WORK SHALL BE DONE IN A NEAT AND WORKMAN -LIKE MANNER. <br />-� <br />- CONTROL VALVE W/ TAMPER SWITCH <br />SPRINKLER ORIFICE SIZE: 1/2" <br />DURATION OF SUPPLY: 60-90 MIN. <br />8. SPRINKLER LOCATIONS SHALL BE CENTERED IN THE TILE. PROVIDE ARMOVER OR SWING JOINT AS <br />MAXIMUM COVERAGE/SPRINKLER HEAD: 130 SQ. FT. <br />REQUIRED. <br />1.7 CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND FEES, ETC., REQUIRED FOR THE <br />1404 allm <br />- 2-1/2" FIRE DEPARTMENT VALVE W/ CAP AND CHAIN <br />HOSE STREAM ALLOWANCE: 250 GPM <br />EXECUTION OF THIS WORK. <br />9. SPRINKLERS IN AREAS WITH EXPOSED STRUCTURE (OBSTRUCTED CONSTRUCTION) SHALL BE <br />DESIGN CRITERIA: <br />INSTALLED WITH DEFLECTOR V BELOW THE BOTTOM OF THE BEAM (MAXIMUM 22" BELOW ROOF <br />1.8 CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES BEFORE FABRICATION OR <br />INSTALLATION. OFFSETS AND/OR TRANSITIONS REQUIRED SHALL BE PROVIDED WITHOUT <br />- HYDRAULIC REMOTE AREA <br />THE FOLLOWING PUBLICATIONS SHALL BE USED AS A REFERENCE FOR <br />DECK). EXPOSED BAR JOISTS THAT HAVE SPRAY- FIRE PROOFING THAT MAKES THE JOIST SOLID <br />SHALL BE TREATED LIKE A BEAM WITH THE SPRINKKLL ERS 1" BELOW THE BOTTOM OF THE FIRE <br />ADDITIONAL COST. CONTRACTOR SHALL COORDINATE AND INSTALL WORK IN A TIMELY <br />THE DESIGN OF THE FIRE SUPPRESSION SYSTEM ON THIS PROJECT. <br />PROOFING. <br />--� <br />MANNER TO PREVENT DELAYS IN THE CONSTRUCTION. <br />1. NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2013 EDITION <br />-KEYNOTE <br />2. FLORIDA FIRE PREVENTION CODE, 6TH EDITION (2017) <br />10. SLEEVE AND/OR FIRESTOP ALL PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND FLOORS <br />1.9 CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE DAMAGED EQUIPMENT AND/OR <br />WITH U/L LISTED ASSEMBLIES. FIRESTOP ASSEMBLIES SHALL BE EQUAL OR EXCEED THE RATING OF <br />MATERIAL. <br />® <br />- HYDRAULIC REFERENCE NODE <br />THE WALL, CEILING OR FLOOR. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. <br />1.10 PIPING SHOP DRAWINGS: SUBMIT 1/8" SCALE PIPING SHOP DRAWINGS. SHOP DRAWINGS SHALL <br />FIRE SPRINKLER: <br />11. PROVIDE ACCESS PANELS TO ALL VALVES ABOVE NON -ACCESSIBLE CEILINGS AND CHASES. <br />INCLUDE SPRINKLER PIPING CUT LENGTHS, OFFSETS, FITTINGS AND DEVICES, ELEVATIONS, <br />Q <br />- REVISION REFERENCE <br />HANGER LOCATIONS, SPRINKLER HEAD COUNT BY TYPE, ELEVATION SECTIONS AND OTHER <br />THE CONTRACTOR SHALL PREPARE SYSTEM LAYOUT DRAWINGS PER CHAPTER 23, OF NFPA <br />12. PROVIDE A PERMANENTLY ATTACHED NAME TAG TO THE RISER STATING THE REQUIRED DESIGN <br />INSTALLATION INFORMATION. SUBMIT HYDRAULIC CALCULATIONS PROVING THE VIABILITY OF <br />- CONNECT TO <br />13 - 2013 EDITION. THE CONTRACTOR SHALL PERFORM HYDRAULIC CALCULATIONS. <br />CRITERIA FOR EACH HYDRAULICALLY -DESIGNED SYSTEM. <br />THE MOST HYDRAULICALLY -REMOTE AREAS OF THE PROJECT. INDICATE HYDRAULIC <br />CONTRACTOR'S SPRINKLER SYSTEM LAYOUT (SHOP DRAWINGS), HYDRAULIC CALCULATIONS <br />REFERENCE POINTS AND SUBMIT COMPUTER ANALYZED NODAL CALCULATIONS IN BOTH <br />- DEMO TO <br />AND MATERIAL DATA SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER AND AUTHORITY <br />13. PROVIDE SPRINKLERS UNDERNEATH ALL EXPOSED DUCTWORK WHICH IS OVER 48" WIDE AND <br />TABULAR AND GRAPHICAL FORMATS. HYDRAULIC IMBALANCE SHALL NOT EXCEED 0.01 GPM AT <br />HAVING JURISDICTION FOR APPROVAL PRIOR TO SYSTEM INSTALLATION. <br />SPACE HEADS AROUND ALL OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13. HEADS UNDER DUCTS <br />ANY NODE, AND WATER VELOCITY SHALL NOT EXCEED 20 FEET PER SECOND, DEMONSTRATE <br />ARE NOT INDICATED ON THE DRAWINGS BUT ARE REQUIRED AND SHALL BE PROVIDED IN <br />COMPLIANCE WITH THE REQUIREMENTS OF NFPA-13 REGARDING DENSITY, AREA OF <br />ACCORDANCE WITH NFPA 13. SPRINKLER LOCATIONS UNDER DUCTWORK AND AROUND <br />APPLICATION, SELECTION OF HYDRAULICALLY -REMOTE AREAS, AND MAXIMUM COVERAGE PER <br />WATER SUPPLY DATA <br />OBSTRUCTIONS SHALL BE GOVERNED BY FINAL INSTALLED LOCATIONS. <br />SPRINKLER. <br />THE CONTRACTOR SHALL PERFORM HYDRANT -FLOW TEST TO VERIFY WATER PRESSURE <br />14. PROVIDE SPRINKLERS AT THE TOP AND BOTTOM OF ALL STAIRWELLS AND AT THE LANDING OF <br />1.11 COORDINATE ALL PIPE ROUTING WITH ALL OTHER TRADES PRIOR TO INSTALLATION. ROUTE ALL <br />REQUIRED FOR HYDRAULIC CALCULATIONS. <br />EACH FLOOR THAT OPENS INTO MORE THAN ONE FIRE ZONE. <br />PIPING TO AVOID DUCTWORK, PIPING, AND BUILDING STRUCTURE. <br />15. PROVIDE SPRINKLER GUARDS ON ALL HEADS IN ELECTRIC ROOMS, TELEPHONE ROOMS, ELEVATOR <br />2.00 - BASIC MATERIALS AND METHODS <br />ROOMS, ELEVATOR SHAFTS AND ON ANY HEADS LESS THAN 7'-0" ABOVE THE FLOOR. <br />2.1 GENERAL: ONLY THE FOLLOWING MATERIALS DESIGNED FOR 175 PSIG CWP SHALL BE USED <br />16. IF SYSTEM PRESSURE EXCEEDS 100 PSI PROVIDE HANGERS PER NFPA 13 9.2.3.4. AND 9.2.3.5.2 THAT <br />FOR FIRE PROTECTION PIPING UNLESS SPECIFICALLY INDICATED OTHERWISE. ALL PIPING <br />PREVENTS UPWARD MOVEMENT OF THE PIPE FOR SPRINKLERS IN THE PENDENT POSITION. A <br />MATERIALS SHALL HAVE A CORROSION RESISTANCE RATING (CCR) OF 1.0 OR GREATER. <br />MAXIMUM OF 12" FROM THE END SPRINKLER ON A BRANCH LINE AND ALL ARM-OVERS OVER 12". <br />2.2 PIPE: 2 INCH OR SMALLER PIPE, AND ALL THREADED PIPING SHALL BE BLACK STEEL, SCHEDULE <br />NOTE: SOME SYMBOLS <br />SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT <br />17. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT (PANELS, TRANSFORMERS, ETC.) PRIOR TO <br />40, ASTM A-53. 2-1/2 INCH AND LARGER PIPE MAYBE BLACK STEEL, SCHEDULE 10, ASTM A-135. <br />ANY INSTALLATION. DO NOT ROUTE ANY PIPING OVER ANY ELECTRICAL PANELS UNDER ANY <br />MNERALFIRE PROTECT" I�IGTE ��R <br />FLORIDA ADM�IINI TRATI'�E BODE <br />2.3 FITTINGS: SCHEDULE 40 BLACK STEEL PIPE SHALL BE JOINED BY MECHANICAL COUPLINGS, <br />IR T ELECTRICAL HALL BE REROUTED AT N ADDITIONAL <br />C CUMS ANCES. ANY PIPING RUN OVER EL CT S O O <br />COST. <br />THREADED OR WELDED FITTINGS; SCHEDULE 10 BLACK STEEL PIPE SHALL BE JOINED BY <br />ROLLED GROOVE COUPLINGS OR WELDED FITTINGS ONLY. WELDED BRANCH CONNECTIONS <br />WHICH ARE AT LEAST 2 NOMINAL PIPE SIZES SMALLER THAN THE MAINS ARE PERMITTED. <br />,� <br />FLORIDA HEALTHCARE PRO�IECT`S STAGE III <br />CHAPTER 1" 5-3 NOTES <br />° <br />18. SPRINKLERS IN EQUIPMENT ROOMS ARE TO BE INTERMEDIATE TEMPERATURE 200 F SPRINKLERS <br />■ <br />PER NFPA 13. <br />THREADED FITTINGS ARE ACCEPTABLE ONLY FOR PIPING 2 INCHES AND SMALLER. <br />THE WATER -BASED FIRE PROTECTION SYSTEM HAS BEEN DESIGNED IN COMPLIANCE WITH <br />a. THE POINT OF SERVICE AND THE WATER SUPPLY CHARACTERISTIC'S FOR THE FIRE <br />19. WET BULK SUPPLY MAINS AND HOSE SUPPLY MAINS EXPOSED TO THE WEATHER SHALL BE <br />2.4 HANGERS: ALL HANGER SPACING SHALL COMPLY WITH THE REQUIREMENTS OF NFPA-13. <br />NFPA 13-2010, FLORIDA ADMINISTRATIVE CODE 61G15-32, AND THE STATE OF FLORIDA AGENCY <br />PROTECTION SYSTEM IS SHOWN ON THE FIRE PROTECTION SITE PLAN. <br />INSULATED AND PROVIDED WITH AN ALUMINUM JACKET. <br />FOR HEALTHCARE ADMINISTRATION (AHCA) AS FOLLOWS: <br />2.5 SPRINKLER HEAD LOCATION: INSTALL SPRINKLER HEADS IN THE CENTER OF THE CEILING TILES <br />b. THE FIRE PROTECTION DESIGN, CALCULATIONS, INSTALLATION AND THE ACCEPTANCE TESTING <br />20. PROVIDE A TEMPORARY STANDPIPE SYSTEM WITH FIRE DEPARTMENT CONNECTIONS DURING <br />FOR SUSPENDED CEILING APPLICATIONS. <br />1. THESE DRAWINGS REPRESENT A COMPLETE SPRINKLER DESIGN AS REQUIRED FOR REVIEW BY <br />OF THE FIRE PROTECTION SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13, 2013 EDITION; THE <br />CONSTRUCTION. <br />AHCA FOR STAGE III CONSTRUCTION DOCUMENTS, IN CONJUNCTION WITH ASSOCIATED <br />FLORIDA BUILDING CODE AND THE FLORIDA FIRE PREVENTION CODE 6TH EDITION AND ALL <br />2.6 SPRINKLER CAGE GUARD: PROVIDE HEAD GUARDS ON ALL HEADS IN ELECTRICAL ROOMS AND <br />HYDRAULIC CALCULATIONS AND A LAYOUT OF THE PIPING SYSTEM COMPLETED BY TLC, AND <br />LOCAL CODES REQUIRED BY THE AUTHORITY HAVING JURISDICTION. <br />ON ALL HEADS LESS THAN T-0" ABOVE FINISHED FLOOR. <br />ARE THE COMPLETE ENGINEERING DOCUMENTS IN COMPLIANCE WITH FLORIDA <br />ADMINISTRATIVE CODE 61G15-32.003 AND-32.004. <br />c, AREA OCCUPANCIES AND HAZARD CLASSIFICATIONS ARE LISTED IN THE DESIGN CRITERIA NOTE <br />LRpRMIILE,"C',RONTITICN <br />COMIERATItN <br />2.7 GAUGES: PROVIDE GAUGES AND GAUGE VALVES AS REQUIRED BY NFPA 13. GAUGE <br />LOCATED ON THE CONTRACT DOCUMENTS. <br />SCALE SHALL BE 0-300 PSI UNLESS OTHERWISE INDICATED. <br />2. SUPPLEMENTAL INFORMATION HAS ALSO BEEN PROVIDED HEREIN TO ASSIST AHCA AND <br />OTHER AUTHORITIES HAVING JURISDICTION (AHJ) IN UNDERSTANDING THE OWNER'S INTENDED <br />d. THE FIRE PROTECTION CONTRACTOR SHALL PREPARE AND PROVIDE FIRE PROTECTION SYSTEM <br />THE EXISTING FIRE PROTECTION SYSTEM SHALL REMAIN ACTIVE DURING THE CONSTRUCTION <br />2.8 ACCESS PANELS: PROVIDE ACCESS PANELS TO ALL VALVES WITHIN CHASES OR ABOVE NOW <br />USE AND PROPOSED PROTECTION OF THE BUILDING PURSUANT TO FLORIDA ADMINISTRATIVE <br />LAYOUT DOCUMENTS WITH HYDRAULIC CALCULATIONS. FIRE PROTECTION SYSTEM LAYOUT <br />AND INSTALLATION OF THE NEW FIRE SPRINKLER SYSTEM. ONCE THE NEW SYSTEM IS <br />ACCESSIBLE CEILINGS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. <br />CODE 61G15-32.003 (8) AND AS OUTLINED IN NFPA 13 - 23.1 AS PRELIMINARY PLANS TO PROVIDE <br />DOCUMENTS WITH HYDRAULIC CALCULATIONS SHALL BE SUBMITTED TO THE <br />INSTALLED, CONNECTED TO THE WATER SOURCE, IS TESTED AND ACCEPTED BY THE AHJ THE <br />A CLEAR REPRESENTATION OF THE HAZARD TO BE PROTECTED, THE SYSTEM DESIGN <br />ARCHITECT/ENGINEER AND THE LOCAL AHJ FOR ACCEPTANCE PRIOR TO PERMITTING. <br />EXISTING SYSTEM CAN BE DEMOLISHED. THE BUILDING SHALL NOT BE WITH OUT FIRE <br />2.9 HYDROSTATIC TESTS: ABOVE GROUND AND BELOW GROUND PIPING SYSTEMS SHALL BE <br />CONCEPT, THE PROPOSED WATER SUPPLY CONFIGURATION, AND BUILDING CONSTRUCTION <br />SPRINKLER PROTECTION AT ANY TIME DURING CONSTRUCTION EXCEPT FOR THE TIME OF <br />HYDROSTATICALLY TESTED AT NOT LESS THAN 200 PSI PRESSURE, OR AT 50 PSI IN EXCESS OF <br />INFORMATION PERTINENT TO THE SYSTEM LAYOUT AND DETAILING. <br />e. SEE SITE PLAN FOR THE CHARACTERISTICS WATER SUPPLY PIPING. <br />CONNECTING THE NEW SYSTEM AND DISCONNECTING THE EXISTING SYSTEM. PROVIDE 72 <br />THE MAXIMUM PRESSURE, WHICHEVER IS GREATER, FOR A PERIOD OF 2 HOURS. THE TEST <br />HOUR NOTICE TO THE OWNER PRIOR TO SYSTEM SHUT DOWNS. COORDINATION WITH THE <br />PRESSURE SHALL BE READ FROM A GAUGE LOCATED AT THE LOW ELEVATION POINT OF THE <br />3. IN ACCORDANCE WITH FLORIDA ADMINISTRATIVE CODE 61G15-32.004 (4), INSOFAR AS <br />f. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE A HYDRANT FLOW TEST AND PERFORM <br />OWNER PRIOR TO SHUT DOWN OF THE EXISTING FIRE SPRINKLER SYSTEM IS REQUIRED TO <br />INDIVIDUAL SYSTEM OR PORTION OF THE SYSTEM BEING TESTED. THE SPRINKLER PIPING <br />ADDITIONAL INFORMATION IS SHOWN IN THESE ENGINEERING DOCUMENTS THAN IS REQUIRED, <br />HYDRAULIC CALCULATIONS FOR PREPARATION OF THE FIRE PROTECTION SYSTEM LAYOUT <br />IMPLEMENT OTHER MEANS OF FIRE SAFETY FOR THE BUILDING. <br />SHALL NOT HAVE LEAKAGE EXCEEDING THE AMOUNTS SPECIFIED IN NFPA 24. LEAKAGE <br />TLC IS RESPONSIBLE FOR THE TECHNICAL ACCURACY OF THE WORK IN ACCORDANCE WITH <br />DOCUMENTS (WORKING PLANS), <br />QUANTITIES SHALL BE DETERMINED BY PUMPING AT THE SPECIFIED TEST PRESSURE FROM A <br />APPLICABLE CODES, STANDARDS AND SOUND ENGINEERING PRINCIPLES. <br />TEMPORARY FIRE PROTECTION: <br />CALIBRATED CONTAINER. REPAIR LEAKING JOINTS AND RETEST AS NECESSARY UNTIL ALL <br />g. ALL SYSTEM CONTROL VALVES SHALL BE PROVIDED WITH TAMPER SWITCHES AND INTERFACE <br />PROVIDE TEMPORARY SPRINKLER HEADS TO PROVIDE COVERAGE IN ALL CONSTRUCTION <br />SYSTEMS HAVE BEEN TESTED. TEST THE PIPING BETWEEN THE CHECK VALVE IN THE FIRE <br />4. SHOP DRAWINGS SHALL BE DEVELOPED AND SUBMITTED BY THE FIRE PROTECTION SUB- <br />THE ALARM CIRCUIT. <br />ZONES CREATED BY TEMPORARY CONSTRUCTION BARRIERS INCLUDING CONSTRUCTION FOR <br />DEPARTMENT INLET PIPE AND THE OUTSIDE CONNECTION THE SAME AS THE BALANCE OF THE <br />CONTRACTOR AS FOLLOWS: <br />ALL PHASES. <br />SYSTEM. <br />A. THE FIRE PROTECTION INSTALLING SUBCONTRACTOR, IN ACCORDANCE WITH THE FIRE <br />h. THE WATER SUPPLY FOR THE FIRE PROTECTION SYSTEM HAS NOT SHOWN ANY EVIDENCE OF <br />PROTECTION SPECIFICATION SECTIONS, MUST PROVIDE LAYOUT DOCUMENTS OR <br />MICROBIAL INDUCED CORROSION (MIC). THE FIRE PROTECTION CONTRACTOR SHALL NOTIFY <br />3.00 - FIRE PROTECTION VALVES AND ACCESSORIES <br />WORKING PLANS (SHOP DRAWINGS) IN COMPLIANCE WITH FLORIDA ADMINISTRATIVE CODE <br />THE ARCHITECT/ENGINEER OF ANY EVIDENCE OF MIC AND PROVIDE NECESSARY WATER <br />61G15-32.002 AND NFPA 13 CHAPTER 23 FOR TLC REVIEW. <br />TREATMENT AS NEEDED TO REDUCE OR ELIMINATE MIC. <br />T. T <br />,� . <br />FIRE PR 1 E 1 M N DIIN NO <br />3.1 QUICK -RESPONSE UPRIGHT SPRINKLERS: SPRINKLER HEADS SHALL BE MANUFACTURED WITH <br />UPRIGHT DEFLECTORS FOR INSTALLATION ABOVE THE BRANCH LINE WITH BRASS FINISH - <br />B. TLC WILL REVIEW THE SHOP DRAWINGS FOR ACCURACY, DESIGN INTENT AND COMPLIANCE <br />1. ALL METERING AND BACK FLOW PREVENTION DEVICES SHALL MEET WITH ALL WATER <br />CENTRAL GB-QR OR VIKING MICROFAST MODEL M. <br />WITH THE REQUIREMENTS OF FLORIDA ADMINISTRATIVE CODE 61 G15 AND NFPA 13. <br />PURVEYORS REQUIREMENTS. <br />SHEET <br />DESCRIPTION <br />ISSUED <br />3.2 QUICK RESPONSE SEMI -RECESSED SPRINKLERS: SPRINKLER HEADS SHALL BE MANUFACTURED <br />C. IF THE LAYOUT DOCUMENTS CONTAIN MATERIAL DEVIATIONS (ANY DEVIATION FROM THE <br />j. ALL FIRE PROTECTION EQUIPMENT AND COMPONENTS SHALL BE LISTED AND TESTED FOR FIRE <br />FP103 <br />NEW CONSTRUCTION PLAN - FIRE PROTECTION <br />Yes <br />WITH PENDANT DEFLECTOR FOR INSTALLATION BELOW THE BRANCH LINE WITH CHROME- <br />DESIGN PARAMETERS ESTABLISHED AND DOCUMENTED IN THESE PLANS), THE FIRE <br />PROTECTION USE. ALL FIRE PROTECTION EQUIPMENT AND COMPONENTS SHALL BE THE U.L. <br />FP001 <br />GENERAL FIRE PROTECTION INFORMATION <br />Yes <br />PLATED FINISH - RELIABLE G5-56 OR VIKING MICROFAST MODEL M WITH MODEL F-1 <br />PROTECTION SUBCONTRACTOR SHALL REIMBURSE TLC ENGINEERING FOR ALL <br />LISTED AND FM APPROVED. <br />ESCUTCHEON. <br />ENGINEERING FEES REQUIRED TO REVISE THE ENGINEERING DOCUMENTS AND FOR <br />RESUBMISSION TO AHCA AND OTHER AHJ'S. <br />3.3 QUICK -RESPONSE CONCEALED SPRINKLERS: SPRINKLER HEADS SHALL BE MANUFACTURED <br />WITH PENDANT DEFLECTOR FOR INSTALLATION BELOW THE BRANCH LINE WITH WHITE FINISH - <br />D. A COPY OF THE APPROVED SHOP DRAWINGS AND ENGINEERING DOCUMENTS SHALL BE <br />RELIABLE G5-56 OR VIKING MICROFAST MODEL M. <br />PROVIDED FOR AHJ REVIEW AS REQUIRED FOR PERMITS. <br />3.4 SPRINKLER CAGE GUARD: PROVIDE SPRINKLER HEAD OPEN -WIRE CAGE GUARD TO PROTECT <br />HEADS FROM INJURY. CAGE WIRE SHALL BE CADMIUM -PLATED STEEL - TYCO SPRINKLER <br />GUARD A-1 OR VIKING MODEL A-1 SPRINKLER GUARD. <br />3.5 BUTTERFLY TYPE ISOLATION, 2-1/2 INCH AND LARGER: ISOLATION VALVES 2-1/2 INCH AND <br />LARGER SHALL BE CAST IRON BODY BUTTERFLY VALVES WITH THE VALVE SIZE, PRESSURE <br />FIREPRINILR LEGEND <br />RATING, MANUFACTURER AND "UL" AND "FM" CAST INTO THE BODY. VALVE SHALL HAVE <br />BRONZE OR CAST IRON DISC, NEOPRENE DISC LINER, CAST IRON HANDWHEEL WITH DISC <br />POSITION INDICATOR, INTEGRAL TAMPER SWITCH 175 PSIG CWP WORKING PRESSURE 350 <br />PSIG CWP TEST PRESSURE, AND FLANGED OR GROOVED CONNECTIONS - GRINNELL 8000 FP OR <br />,SYMBOL <br />ORIFICE <br />TEMP <br />RESPONSE <br />K-FACTOR <br />FINISH <br />MODEL <br />STYLE <br />PLATE <br />MFG <br />EQUAL. <br />• <br />1/2" <br />155° F <br />QUICK <br />5.6 <br />WHITE <br />GB-56 <br />CONCEALED <br />WHITE <br />RELIABLE <br />3.6 ISOLATION VALVE TAMPER SWITCH: PROVIDE AN ELECTRONIC SUPERVISORY OR TAMPER <br />0 <br />3/4" <br />165' F <br />QUICK <br />11.2 <br />BRASS <br />G4 XLO QREC <br />CONCEALED EXT COVERAGE <br />WHITE <br />RELIABLE <br />SWITCH ON EACH ISOLATION VALVE IN THE SPRINKLER SYSTEM. UNIT SHALL HAVE A RED <br />C) <br />1/2" <br />155° F <br />-- <br />- <br />-- <br />EXISTING <br />PENDENT <br />-- <br />EXISTING <br />TAMPER -PROOF COVER WHICH WILL ACTIVATE AN ALARM OR TROUBLE SIGNAL WHEN <br />F; <br />1/2" <br />155° F <br />- <br />-- <br />-- <br />EXISTING <br />UPRIGHT <br />-- <br />EXISTING <br />ADJUSTED. PROVIDE UNIT WITH SINGLE -POLE, NORMALLY CLOSED MICROSWITCH, MOUNTING <br />BRACKET, AND NON-RESETTABLE LOCK WITH REMOVABLE RESET KEY - SIMPLEX 2097-9035. <br />3.7 FLOW SWITCH: PROVIDE AN ELECTRIC FLOW SWITCH WHERE INDICATED OR REQUIRED. FLOW <br />SHALL BE SENSED BY AN IMMERSION PADDLE, WITH AN ADJUSTABLE RETARD SETTING FROM 0 <br />TO 70 SECONDS TO MINIMIZE FALSE ALARMS. FLOW SWITCH SHALL HAVE 2 SEPARATE SINGLE <br />POLE, DOUBLE THROW MICROSWITCHES TO ACTIVATE A FLOW ALARM, OR TO INDICATE A <br />TROUBLE SIGNAL IF THE FLOW SWITCH HOUSING IS TAMPERED. FLOW ALARM SHALL BE <br />AUTOMATICALLY RESETTING. PROVIDE CLAMP -ON HOUSING TO SECURE UNIT TO PIPE, OR <br />THREADED CONNECTION FOR TEE FITTING - POTTER ELECTRIC SIGNAL CO. VSR-S. <br />3.8 INSPECTOR'S TEST AND DRAIN: TEST AND DRAIN SHALL BE PROVIDED WITH INTEGRAL SIGHT <br />GLASS, INTEGRAL 1/2 INCH TEST ORIFICE AND POSITIVE POSITIONING OF HANDLE FOR OFF, <br />TEST AND DRAIN OPERATIONS - G/J INNOVATIONS, INC "SURE -TEST" OR AGF MANUFACTURING, <br />INC. "TESTDRAIN". <br />RS&H <br />301 E. Pine Street, Suite 350 <br />Orlando, Florida 32801 <br />407-893-5800 Fax 407-264-6624 <br />www.rsandh.com <br />FL Cert. Nos. AAC001886 " IB26000956 <br />5620 * LCC000210 " GB238 <br />TLC ENGINEERING <br />,, SOLUTIONS <br />®Copyright 2019 <br />256 S. Orange Avenue <br />Suite 1600 COA 15 <br />Orlando, FL 32801 WNW.0 engineers.com <br />P 407.841.9050 TLC No.:119469 <br />THINK. LISTEN. CREATE. <br />PROJECT TITLE: <br />AdventHealth - ZEPHYRHILLS <br />OPERATING ROOMS BUILT OUT <br />PROJECT ADDRESS: <br />7050 GALL BLVD, <br />ZEPHYRHILLS, FL, 33541 <br />Aaron Lee Johnson, P.E. <br />Florida License #71576 <br />`���r��ir�rrrrri <br />.V ........EEfly <br />Q`� -* •- -.0 <br />16, '�. 16, 0.2 <br />T. : <br />No 71576 <br />� r <br />STATE OF <br />• <br />• �41 P' •• .` <br />���'�.• O R �•• • ��ti <br />,,' <br />LU <br />G <br />rr N AL ����%. <br />Srrriinr, <br />H <br />Z <br />LU <br />l � <br />v <br />a <br />6 <br />sd <br />REVISIONS <br />NO. DESCRIPTION DATE <br />DATE ISSUED: 12/11/2019 <br />REVIEWED BY: ALJ <br />DRAWN BY: JLL <br />DESIGNED BY: AL <br />PROJECT NUMBER: <br />504-0253-000 <br />0 2019 RS&H, INC. <br />SHEET TITLE: <br />GENERAL FIRE <br />PROTECTION <br />INFORMATION <br />SHEET ID: <br />BLDG. ID <br />FP001 <br />PROJECT STATUS: <br />CONSTRUCTION <br />DOCUMENTS <br />Copyright O 20% This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the <br />expressed written consent of this corporation is prohibited. All rights reserved. <br />3" SCALE 0 3" 6" 1' <br />1 1/2" SCALE 0 6" 1' 2' <br />3/8" SCALE 3' 0 18" 3' 6' <br />1/4" SCALE 4' 0 2' 4' 8' <br />1 /8" SCALE 8' 0 4' 8' 16' <br />